Home / Browse projects / Bengaluru Urban, Karnataka / ABHEE CITY URBAN GLENN PHASE II

Registration approved No litigation declared Residential/Group Housing project

ABHEE CITY URBAN GLENN PHASE II

By ABHEE VENTURES PRIVATE LIMITED

RG-KA-98520 · RERA PRM/KA/RERA/1251/308/PR/300926/008986 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2033Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 0%
1,000 of 1,000Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 245 documents Report an error

ABHEE CITY URBAN GLENN PHASE II is a Residential/Group Housing project by ABHEE VENTURES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/300926/008986 on 30 Sep 2026. Possession is promised by 31 Dec 2033. 0 of the 1,000 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameABHEE CITY URBAN GLENN PHASE II
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 560087
  • Pincode560087
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/300926/008986
  • ReraGenie IDRG-KA-98520

Builder

  • NameABHEE VENTURES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45203KA2021PTC153091
  • GSTIN29AAVCA9517E1Z5
  • Authorized SignatoryR Nagaraja Reddy
  • Managing DirectorR Nagaraja Reddy
  • DirectorsRNagarajaReddy, AmaravthiR
  • Project HeadAnanda Kumar
  • Other registrations8 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredSep 2026PromisedDec 2033

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Sep 2026
  • Promised completion31 Dec 2033
  • Revised completionNone
  • Buildings4 building records
  • Documents filed245 files

Current status

0%0 of 1,000 units booked
0.0%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower-11---2140214
Tower-12---2860286
Tower-13---2140214
Tower-14---2860286

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.

Building: 0% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work0%
Foundation footing work0%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership74

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area31,399 sq m
Named landowners74
LandownerVillageDistrict
ANNAYAPPA S--
N MAHESHWARA REDDY--
PRADEEP VENKATAPPA--
PRARTHANA RAGHAVA--
MASTER. ADVITH P GOWDA--
KUMARI. AVANI P GOWDA--
PUSHPAVATHAMMA--
GURUPRASAD N--
RASHMI N--
INDRAMMA--
MADHU MK--
KUSUMA K--
M R NITHINKUMAR--
Lakshmamma C--
RADHA K--
T.N. PRAKASH--
GAYATHRI P--
TEJESHWINI P--
JAYANTH P--
K. MAMATHA--
RAJA REDDY H M--
JAYASHREE R--
HEMASHREE R--
T.N. ESHWARA REDDY--
SUJATHA. S--
E. PADMANABA--
CHAITHRA G--
KUMARI NITYA CHETHANA SAI--
KUMARI VAISHNAVI CHAITHANYA SAI--
E. PRATHAP--
KSHITHIJA C REDDY--
KUMARI. JITHANYA NAMASVI P--
JAYAMMA N--
D V BHUVANESH--
D V DHANARAJ--
DEVARATHNA--
BHAGYALAKSHMI--
D V KRISHNAPPA--
D V MANJULA--
T.N. PRAKASH--
RADHA K--
GAYATHRI P--
TEJASHWINI P--
JAYANTH P--
Abhee Ventures Private Limited--
MANJUNATHA K V--
GUMMADI SUDHA--
P.V. MANJUNATHA--
V RAMAKRISHNA--
MUDHAPPA S ALLUR--
GUJJULA MADHAVA REDDY--
RAMOJI GOWDA--
MANJUNATHA REDDY--
RAJANNA K L--
NANJAMMA--
CHANDRASHEKAR N S--
NARASHIMA MURTHY K N--
N. SHIVARAMA REDDY--
YASHODA N--
BHARATH S--
SUDHA M--
Master KUSHIK B--
SHARATH S--
INDU H.S--
MASTER PARINITH S--
T.N. PRAKASH--
RADHA K--
GAYATHRI P--
TEJASHWINI P--
JAYANTH P--
M. CHANDRA REDDY--
VEDHAVATHI CR--
AKASH C--
VISHWAS C--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 723.38 cr
Spent of the estimate0.0%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 485.71 cr-
Payment of taxesRs 103.86 cr-
On-site expenditure-Site OverheadRs 82.45 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 42.49 cr-
On-site expenditure-Consultants FeesRs 8.87 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRSP Design Consultants (India) Pvt Ltd
EngineerDESIGNTREE SERVICE CONSULTANTS PVT LTD
Chartered AccountantV Raveendra Reddy

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed245

As listed on the registration, under the names the promoter filed them with; the newest 80 of 245 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/300926/008986 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 UG-2 Q2.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architecture Certificate Q2 26-27 P-2.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate Q2 26-27 P-2.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Podi MR from 131/10 to 131/11,12,13,14.File: Podi MR from 13110 to 13111,12,13,14.pdf24 Sep 2026
129/1 to 4,5.File: 129-1 to 4,5.pdf24 Sep 2026
Sale deed for sy no 131/2File: Sale Deed 6434-2026-27.pdf24 Sep 2026
Khata 131/2File: Katha 131-2.pdf24 Sep 2026
EC upto date in sr no 131/2.File: EC Upto Date 131-2.pdf24 Sep 2026
Upload the Bank 100%File: Phase II Collection account.pdf13 Aug 2026
Upload the Bank 70%File: Phase II RERA Escrow account.pdf13 Aug 2026
Upload the Bank 30%File: Phase II RERA account.pdf13 Aug 2026
Bank affidavitFile: Affidavit Phase II.pdf13 Aug 2026
Notarized Non Litigation AffidavitFile: Affidavit for non litigation.pdf13 Aug 2026
Chartered accountant membership registration certificateFile: CA Membership Certificate.pdf13 Aug 2026
Chartered accountant certificate (CA) in prescribed format form -01File: Form 1 Phase II.pdf13 Aug 2026
Annual audit report of the previous projectFile: ABHEE Aaria Form 7 @@.pdf13 Aug 2026
Quarterly report of the previous projectFile: Aaria Q4 2025-26.pdf13 Aug 2026
Advocate search report for Sy No 131/1,131/2,131/3,131/10,131/11,131/12,131/13,131/14File: Legal Opinion 131.pdf13 Aug 2026
Advocate search report for Sy No 129/1,129/4,129/5File: Legal Opinion Sy No 129-1, 129-4 & 129-5.pdf13 Aug 2026
Advocate search report for Sy No 130/1,130/2,130/5,130/6,130/7,130/8File: Legal Opinion Sy No 130.pdf13 Aug 2026
JD Cum AffidavitFile: JD Affidavit cum Declaration (2).pdf13 Aug 2026
Area statement related to this phase Declaration affidavit wrt phasesFile: Affidavit Cum Declaration.pdf13 Aug 2026
Land details corrections in promoter details and land details sectionFile: Decalration for project address Phase 1 & 2.pdf13 Aug 2026
Undertaking Affidavit cum acknowledgment for Building LicenseFile: Affidavit Building License & Ackn.pdf13 Aug 2026
ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR Sketch TC Halli & Chikvaderpura-rotated.pdf13 Aug 2026
Demarcation of proposed land in original Village mapFile: Thigalachowdadenahalli Village Map-rotated.pdf13 Aug 2026
Affidavit cum Acknowledgment of KSPCB NOCFile: Affidavit KSPCB NOC merged.pdf13 Aug 2026
Approval/NOC under section 14 of the KTCP Act from competent AuthorityFile: CLU Order 129, 130 & 131.pdf13 Aug 2026
Proforma of agreement (AFS) for saleFile: Agreement of Sale Proforma Phase 2.pdf13 Aug 2026
Proforma Allotment letterFile: ALLOTMENT LETTER - PHASE 2.pdf13 Aug 2026
BESCOM NOC.File: 3-BESCOM NOC.pdf13 Aug 2026
Water supply NOC belongs to this projectFile: Water NOC TC Halli.pdf13 Aug 2026
SEIAA NOC.File: 5-SEIAA NOC.pdf13 Aug 2026
Affidavit cum Acknowledgment for HAL NOC.File: Affidavit HAL, Ackn, Receipt.pdf13 Aug 2026
Demarcation of proposed land in Approved Master planFile: New CDP - Chikkavaderapura & TC Halli-rotated.pdf13 Aug 2026
Details of amenities and facilitiesFile: EXTERNAL AMENITIES PHASE 2 (1).pdf13 Aug 2026
Project BrochureFile: ABHEE CITY - URBNA GLENN-PHASE2 Brochure.pdf13 Aug 2026
Phasewise Bifurcation DeclarationFile: Phasewise Bifurcation Declaration.pdf13 Aug 2026
UNIT BIFURCATION DECLARATION -PHASE II(Tower-11,12,13 &14)File: UNIT BIFURCATION DECLARATION -PHASE 2.pdf13 Aug 2026
Structural stability certificateFile: STABILITY CERTIFICATE-P2 (1).pdf13 Aug 2026
Project specifications with signatureFile: Project Specification List-ABHEE CITY URBAN GLENN.pdf13 Aug 2026
PROJECT ESTIMATION PHASE IIFile: PROJECT ESTIMATION PHASE 2.PDF13 Aug 2026
STP drawing certified by the EngineerFile: 1260 KLD STP LAYOUT PHASE 2.PDF13 Aug 2026
Land cost calculation sheet as per the guidance valueFile: LAND COST CALCULATION - PHASE 2.pdf13 Aug 2026
Location details of the projectFile: Project Location.pdf13 Aug 2026
Source of water supply to the project along with the supporting documentsFile: Borewell Affidavit.pdf13 Aug 2026
Phase 2 Area - DEMARKATION PLANFile: Phase 2 Area - DEMARKATION PLAN (1).pdf13 Aug 2026
DEVELOPMENT PLANFile: DEVELOPMENT PLAN.pdf13 Aug 2026
DLP-38 TC Halli orderFile: DLP-38 TC Halli order.pdf13 Aug 2026
SITE PLANFile: 1-SITE PLAN.pdf13 Aug 2026
GROUND FLOOR PLANSFile: 2-GROUND FLOOR PLANS.pdf13 Aug 2026
BASEMENT 1File: 3-BASEMENT 1.pdf13 Aug 2026
BASEMENT 2File: 4-BASEMENT 2.pdf13 Aug 2026
Abhee TC halli Sanction OrderFile: Abhee TC halli Sanction Order.pdf13 Aug 2026
ELEVATIONSFile: ELEVATIONS.pdf13 Aug 2026
SECTIONSFile: SECTIONS -.pdf13 Aug 2026
TOWER 11File: TOWER 11.pdf13 Aug 2026
TOWER 12 FLOOR PLANSFile: TOWER 12 FLOOR PLANS.pdf13 Aug 2026
TOWER 12 TERRACEFile: TOWER 12 TERRACE.pdf13 Aug 2026
TOWER 13File: TOWER 13.pdf13 Aug 2026
TOWER 14File: TOWER 14.pdf13 Aug 2026
RTC, survey Sy No. 131/10 (Old Sy No. 131/1)-
Mutation, survey Sy No. 131/10 (Old Sy No. 131/1)-
Encumbrance Certificate, survey Sy No. 131/10 (Old Sy No. 131/1)-
Conversion/Alienation Order, survey Sy No. 131/10 (Old Sy No. 131/1)-
Sale/Title/Gift Deed, survey Sy No. 131/10 (Old Sy No. 131/1)-
JDA, survey Sy No. 131/10 (Old Sy No. 131/1)-
Khatha, survey Sy No. 131/10 (Old Sy No. 131/1)-
RTC, survey Sy No. 131/1-
Mutation, survey Sy No. 131/1-
Encumbrance Certificate, survey Sy No. 131/1-
Conversion/Alienation Order, survey Sy No. 131/1-
Sale/Title/Gift Deed, survey Sy No. 131/1-
JDA, survey Sy No. 131/1-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationStatusPromisedDelivered
ABHEE AARIAABHEE AARIA, SY.NO:58/1, 58/2, 58/3, 58/4, 58/5, 58/6, 58/7, 58/9, 58/12,58/13, 302/2, 302/3A1(NEW SY.NO.302/7), 302/3A2, 302/5 & 302/6, GUNJURVILLAGE VARTHUR HOBLI, BANGALORE EAST TALUK, WARD NO.149,BANGALORE, BENGALURU NORTH, BENGALURU URBAN, KARNATAKA - 560087OngoingMay 2031Not due yet

How this compares with Bengaluru Urban

0%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ABHEE CITY URBAN GLENN PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmABHEE CITY URBAN GLENN POther 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: ABHEE VENTURES PRIVATE LIMITED

ABHEE VENTURES PRIVATE LIMITED has 9 registrations on RERA Karnataka, including ABHEE SRISHTI LAYOUT and ABHEE SERENITY SPRINGS. Its filings declare 5 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ABHEE CITY URBAN GLENN PHASE II is delayed beyond 31 Dec 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ABHEE CITY URBAN GLENN PHASE II?

The registered promoter entity is ABHEE VENTURES PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2021PTC153091 and GSTIN 29AAVCA9517E1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ABHEE CITY URBAN GLENN PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ABHEE CITY URBAN GLENN PHASE II?

The professionals named in the filing: Architect: RSP Design Consultants (India) Pvt Ltd; Engineer: DESIGNTREE SERVICE CONSULTANTS PVT LTD; Chartered Accountant: V Raveendra Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ABHEE CITY URBAN GLENN PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ABHEE CITY URBAN GLENN PHASE II. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ABHEE CITY URBAN GLENN PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.