Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
ABHEE CITY URBAN GLENN PHASE II is a Residential/Group Housing project by ABHEE VENTURES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/300926/008986 on 30 Sep 2026. Possession is promised by 31 Dec 2033. 0 of the 1,000 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameABHEE CITY URBAN GLENN PHASE II
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 560087
- Pincode560087
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/300926/008986
- ReraGenie IDRG-KA-98520
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on30 Sep 2026
- Promised completion31 Dec 2033
- Revised completionNone
- Buildings4 building records
- Documents filed245 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower-11 | - | - | - | 214 | 0 | 214 |
| Tower-12 | - | - | - | 286 | 0 | 286 |
| Tower-13 | - | - | - | 214 | 0 | 214 |
| Tower-14 | - | - | - | 286 | 0 | 286 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.
Building: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 0% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership74
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ANNAYAPPA S | - | - |
| N MAHESHWARA REDDY | - | - |
| PRADEEP VENKATAPPA | - | - |
| PRARTHANA RAGHAVA | - | - |
| MASTER. ADVITH P GOWDA | - | - |
| KUMARI. AVANI P GOWDA | - | - |
| PUSHPAVATHAMMA | - | - |
| GURUPRASAD N | - | - |
| RASHMI N | - | - |
| INDRAMMA | - | - |
| MADHU MK | - | - |
| KUSUMA K | - | - |
| M R NITHINKUMAR | - | - |
| Lakshmamma C | - | - |
| RADHA K | - | - |
| T.N. PRAKASH | - | - |
| GAYATHRI P | - | - |
| TEJESHWINI P | - | - |
| JAYANTH P | - | - |
| K. MAMATHA | - | - |
| RAJA REDDY H M | - | - |
| JAYASHREE R | - | - |
| HEMASHREE R | - | - |
| T.N. ESHWARA REDDY | - | - |
| SUJATHA. S | - | - |
| E. PADMANABA | - | - |
| CHAITHRA G | - | - |
| KUMARI NITYA CHETHANA SAI | - | - |
| KUMARI VAISHNAVI CHAITHANYA SAI | - | - |
| E. PRATHAP | - | - |
| KSHITHIJA C REDDY | - | - |
| KUMARI. JITHANYA NAMASVI P | - | - |
| JAYAMMA N | - | - |
| D V BHUVANESH | - | - |
| D V DHANARAJ | - | - |
| DEVARATHNA | - | - |
| BHAGYALAKSHMI | - | - |
| D V KRISHNAPPA | - | - |
| D V MANJULA | - | - |
| T.N. PRAKASH | - | - |
| RADHA K | - | - |
| GAYATHRI P | - | - |
| TEJASHWINI P | - | - |
| JAYANTH P | - | - |
| Abhee Ventures Private Limited | - | - |
| MANJUNATHA K V | - | - |
| GUMMADI SUDHA | - | - |
| P.V. MANJUNATHA | - | - |
| V RAMAKRISHNA | - | - |
| MUDHAPPA S ALLUR | - | - |
| GUJJULA MADHAVA REDDY | - | - |
| RAMOJI GOWDA | - | - |
| MANJUNATHA REDDY | - | - |
| RAJANNA K L | - | - |
| NANJAMMA | - | - |
| CHANDRASHEKAR N S | - | - |
| NARASHIMA MURTHY K N | - | - |
| N. SHIVARAMA REDDY | - | - |
| YASHODA N | - | - |
| BHARATH S | - | - |
| SUDHA M | - | - |
| Master KUSHIK B | - | - |
| SHARATH S | - | - |
| INDU H.S | - | - |
| MASTER PARINITH S | - | - |
| T.N. PRAKASH | - | - |
| RADHA K | - | - |
| GAYATHRI P | - | - |
| TEJASHWINI P | - | - |
| JAYANTH P | - | - |
| M. CHANDRA REDDY | - | - |
| VEDHAVATHI CR | - | - |
| AKASH C | - | - |
| VISHWAS C | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 485.71 cr | - |
| Payment of taxes | Rs 103.86 cr | - |
| On-site expenditure-Site Overhead | Rs 82.45 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 42.49 cr | - |
| On-site expenditure-Consultants Fees | Rs 8.87 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RSP Design Consultants (India) Pvt Ltd |
| Engineer | DESIGNTREE SERVICE CONSULTANTS PVT LTD |
| Chartered Accountant | V Raveendra Reddy |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed245
As listed on the registration, under the names the promoter filed them with; the newest 80 of 245 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/300926/008986 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 UG-2 Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architecture Certificate Q2 26-27 P-2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate Q2 26-27 P-2.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Podi MR from 131/10 to 131/11,12,13,14.File: Podi MR from 13110 to 13111,12,13,14.pdf | 24 Sep 2026 |
| 129/1 to 4,5.File: 129-1 to 4,5.pdf | 24 Sep 2026 |
| Sale deed for sy no 131/2File: Sale Deed 6434-2026-27.pdf | 24 Sep 2026 |
| Khata 131/2File: Katha 131-2.pdf | 24 Sep 2026 |
| EC upto date in sr no 131/2.File: EC Upto Date 131-2.pdf | 24 Sep 2026 |
| Upload the Bank 100%File: Phase II Collection account.pdf | 13 Aug 2026 |
| Upload the Bank 70%File: Phase II RERA Escrow account.pdf | 13 Aug 2026 |
| Upload the Bank 30%File: Phase II RERA account.pdf | 13 Aug 2026 |
| Bank affidavitFile: Affidavit Phase II.pdf | 13 Aug 2026 |
| Notarized Non Litigation AffidavitFile: Affidavit for non litigation.pdf | 13 Aug 2026 |
| Chartered accountant membership registration certificateFile: CA Membership Certificate.pdf | 13 Aug 2026 |
| Chartered accountant certificate (CA) in prescribed format form -01File: Form 1 Phase II.pdf | 13 Aug 2026 |
| Annual audit report of the previous projectFile: ABHEE Aaria Form 7 @@.pdf | 13 Aug 2026 |
| Quarterly report of the previous projectFile: Aaria Q4 2025-26.pdf | 13 Aug 2026 |
| Advocate search report for Sy No 131/1,131/2,131/3,131/10,131/11,131/12,131/13,131/14File: Legal Opinion 131.pdf | 13 Aug 2026 |
| Advocate search report for Sy No 129/1,129/4,129/5File: Legal Opinion Sy No 129-1, 129-4 & 129-5.pdf | 13 Aug 2026 |
| Advocate search report for Sy No 130/1,130/2,130/5,130/6,130/7,130/8File: Legal Opinion Sy No 130.pdf | 13 Aug 2026 |
| JD Cum AffidavitFile: JD Affidavit cum Declaration (2).pdf | 13 Aug 2026 |
| Area statement related to this phase Declaration affidavit wrt phasesFile: Affidavit Cum Declaration.pdf | 13 Aug 2026 |
| Land details corrections in promoter details and land details sectionFile: Decalration for project address Phase 1 & 2.pdf | 13 Aug 2026 |
| Undertaking Affidavit cum acknowledgment for Building LicenseFile: Affidavit Building License & Ackn.pdf | 13 Aug 2026 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR Sketch TC Halli & Chikvaderpura-rotated.pdf | 13 Aug 2026 |
| Demarcation of proposed land in original Village mapFile: Thigalachowdadenahalli Village Map-rotated.pdf | 13 Aug 2026 |
| Affidavit cum Acknowledgment of KSPCB NOCFile: Affidavit KSPCB NOC merged.pdf | 13 Aug 2026 |
| Approval/NOC under section 14 of the KTCP Act from competent AuthorityFile: CLU Order 129, 130 & 131.pdf | 13 Aug 2026 |
| Proforma of agreement (AFS) for saleFile: Agreement of Sale Proforma Phase 2.pdf | 13 Aug 2026 |
| Proforma Allotment letterFile: ALLOTMENT LETTER - PHASE 2.pdf | 13 Aug 2026 |
| BESCOM NOC.File: 3-BESCOM NOC.pdf | 13 Aug 2026 |
| Water supply NOC belongs to this projectFile: Water NOC TC Halli.pdf | 13 Aug 2026 |
| SEIAA NOC.File: 5-SEIAA NOC.pdf | 13 Aug 2026 |
| Affidavit cum Acknowledgment for HAL NOC.File: Affidavit HAL, Ackn, Receipt.pdf | 13 Aug 2026 |
| Demarcation of proposed land in Approved Master planFile: New CDP - Chikkavaderapura & TC Halli-rotated.pdf | 13 Aug 2026 |
| Details of amenities and facilitiesFile: EXTERNAL AMENITIES PHASE 2 (1).pdf | 13 Aug 2026 |
| Project BrochureFile: ABHEE CITY - URBNA GLENN-PHASE2 Brochure.pdf | 13 Aug 2026 |
| Phasewise Bifurcation DeclarationFile: Phasewise Bifurcation Declaration.pdf | 13 Aug 2026 |
| UNIT BIFURCATION DECLARATION -PHASE II(Tower-11,12,13 &14)File: UNIT BIFURCATION DECLARATION -PHASE 2.pdf | 13 Aug 2026 |
| Structural stability certificateFile: STABILITY CERTIFICATE-P2 (1).pdf | 13 Aug 2026 |
| Project specifications with signatureFile: Project Specification List-ABHEE CITY URBAN GLENN.pdf | 13 Aug 2026 |
| PROJECT ESTIMATION PHASE IIFile: PROJECT ESTIMATION PHASE 2.PDF | 13 Aug 2026 |
| STP drawing certified by the EngineerFile: 1260 KLD STP LAYOUT PHASE 2.PDF | 13 Aug 2026 |
| Land cost calculation sheet as per the guidance valueFile: LAND COST CALCULATION - PHASE 2.pdf | 13 Aug 2026 |
| Location details of the projectFile: Project Location.pdf | 13 Aug 2026 |
| Source of water supply to the project along with the supporting documentsFile: Borewell Affidavit.pdf | 13 Aug 2026 |
| Phase 2 Area - DEMARKATION PLANFile: Phase 2 Area - DEMARKATION PLAN (1).pdf | 13 Aug 2026 |
| DEVELOPMENT PLANFile: DEVELOPMENT PLAN.pdf | 13 Aug 2026 |
| DLP-38 TC Halli orderFile: DLP-38 TC Halli order.pdf | 13 Aug 2026 |
| SITE PLANFile: 1-SITE PLAN.pdf | 13 Aug 2026 |
| GROUND FLOOR PLANSFile: 2-GROUND FLOOR PLANS.pdf | 13 Aug 2026 |
| BASEMENT 1File: 3-BASEMENT 1.pdf | 13 Aug 2026 |
| BASEMENT 2File: 4-BASEMENT 2.pdf | 13 Aug 2026 |
| Abhee TC halli Sanction OrderFile: Abhee TC halli Sanction Order.pdf | 13 Aug 2026 |
| ELEVATIONSFile: ELEVATIONS.pdf | 13 Aug 2026 |
| SECTIONSFile: SECTIONS -.pdf | 13 Aug 2026 |
| TOWER 11File: TOWER 11.pdf | 13 Aug 2026 |
| TOWER 12 FLOOR PLANSFile: TOWER 12 FLOOR PLANS.pdf | 13 Aug 2026 |
| TOWER 12 TERRACEFile: TOWER 12 TERRACE.pdf | 13 Aug 2026 |
| TOWER 13File: TOWER 13.pdf | 13 Aug 2026 |
| TOWER 14File: TOWER 14.pdf | 13 Aug 2026 |
| RTC, survey Sy No. 131/10 (Old Sy No. 131/1) | - |
| Mutation, survey Sy No. 131/10 (Old Sy No. 131/1) | - |
| Encumbrance Certificate, survey Sy No. 131/10 (Old Sy No. 131/1) | - |
| Conversion/Alienation Order, survey Sy No. 131/10 (Old Sy No. 131/1) | - |
| Sale/Title/Gift Deed, survey Sy No. 131/10 (Old Sy No. 131/1) | - |
| JDA, survey Sy No. 131/10 (Old Sy No. 131/1) | - |
| Khatha, survey Sy No. 131/10 (Old Sy No. 131/1) | - |
| RTC, survey Sy No. 131/1 | - |
| Mutation, survey Sy No. 131/1 | - |
| Encumbrance Certificate, survey Sy No. 131/1 | - |
| Conversion/Alienation Order, survey Sy No. 131/1 | - |
| Sale/Title/Gift Deed, survey Sy No. 131/1 | - |
| JDA, survey Sy No. 131/1 | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| ABHEE AARIA | ABHEE AARIA, SY.NO:58/1, 58/2, 58/3, 58/4, 58/5, 58/6, 58/7, 58/9, 58/12,58/13, 302/2, 302/3A1(NEW SY.NO.302/7), 302/3A2, 302/5 & 302/6, GUNJURVILLAGE VARTHUR HOBLI, BANGALORE EAST TALUK, WARD NO.149,BANGALORE, BENGALURU NORTH, BENGALURU URBAN, KARNATAKA - 560087 | Ongoing | May 2031 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep ABHEE CITY URBAN GLENN PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 31 registered projects within 2 km.
Prestige Lavender Fields
Prestige Office Ventures
Brigade Sanctuary
Brigade Enterprises Ltd
MYHNA VISTARA
MYHNA PROPERTIES PRIVATE LIMITED
ABHEE AARIA
ABHEE VENTURES PRIVATE LIMITED
GODREJ PARK RETREAT
Godrej Properties Limited
MANA SKANDA THE RIGHT LIFE T14-18
NEOBUILD VENTURES LLP
See every Bengaluru Urban project, with the district possession charts
Builder: ABHEE VENTURES PRIVATE LIMITED
ABHEE VENTURES PRIVATE LIMITED has 9 registrations on RERA Karnataka, including ABHEE SRISHTI LAYOUT and ABHEE SERENITY SPRINGS. Its filings declare 5 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if ABHEE CITY URBAN GLENN PHASE II is delayed beyond 31 Dec 2033?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of ABHEE CITY URBAN GLENN PHASE II?
The registered promoter entity is ABHEE VENTURES PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2021PTC153091 and GSTIN 29AAVCA9517E1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in ABHEE CITY URBAN GLENN PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ABHEE CITY URBAN GLENN PHASE II?
The professionals named in the filing: Architect: RSP Design Consultants (India) Pvt Ltd; Engineer: DESIGNTREE SERVICE CONSULTANTS PVT LTD; Chartered Accountant: V Raveendra Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ABHEE CITY URBAN GLENN PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.