Home / Browse projects / Belagavi, Karnataka / SNEH KUNJ

Registration approved No litigation declared Residential/Group Housing project

SNEH KUNJ

By SNEHA ASSOCIATES

RG-KA-15943 · RERA PRM/KA/RERA/1249/447/PR/220923/006293 · Last updated on RERA Karnataka portal: 16 Sep 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 123 documents Report an error

SNEH KUNJ is a Residential/Group Housing project by SNEHA ASSOCIATES in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/220923/006293 on 22 Sep 2023. Possession is promised by 30 Jun 2026.

At a glance

Project

  • NameSNEH KUNJ
  • TypeResidential/Group Housing
  • Location
    • Belagavi
    • 590006
  • Pincode590006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1249/447/PR/220923/006293
  • ReraGenie IDRG-KA-15943

Builder

  • NameSNEHA ASSOCIATES
  • Entity typeProprietorship
  • GSTIN29ACKPM3975C1ZB
  • Authorized SignatoryMr. SHRIKANT MAHADEO OULKAR

Key dates

this monthRegisteredSep 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Sep 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed123 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SNEH KUNJ---25025

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 16 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 16 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area847 sq m
Named landowners1
LandownerVillageDistrict
MR. SHRIKANT M OULKAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.77 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 6.00 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 60.00 lakh-
Administrative CostsRs 10.00 lakh-
On-site expenditure-Consultants FeesRs 7.46 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. ANAND YALLAPPA AKNOJI
EngineerEr. SHRIKANT M OULKAR
Chartered AccountantULHAS NARSIMHA KINI

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed123

As listed on the registration, under the names the promoter filed them with; the newest 80 of 123 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/220923/006293 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
pent house ZR copy of BelagaviFile: Penthouse ZR Belagavi PDF.pdf16 Sep 2023
ZR Copy of BelagaviFile: ZR Belagavi.pdf16 Sep 2023
Bank AccountFile: RERA Account Abbreviation Revised.pdf16 Sep 2023
Source of fundsFile: Source of Funds Revised with Relevant Documents.pdf16 Sep 2023
Certified Amenties & Common Area Details PDFFile: Certified Amenties & Common Area Details PDF.pdf1 Sep 2023
Loan Sanction LetterFile: Loan Sanction Letter.pdf1 Sep 2023
Penthouse ZR Belagavi PDFFile: Penthouse ZR Belagavi PDF.pdf1 Sep 2023
RERA Account Abbreviation RevisedFile: RERA Account Abbreviation Revised.pdf1 Sep 2023
Self Declration of KGWA NOC for Sneh Kunj PDFFile: Self Declration of KGWA NOC for Sneh Kunj PDF.pdf1 Sep 2023
Source of Funds Revised with Relevant DocumentsFile: Source of Funds Revised with Relevant Documents.pdf1 Sep 2023
STP DEMARKATION ONLYFile: STP DEMARKATION ONLY.pdf1 Sep 2023
STP DrawingFile: STP Drawing.pdf1 Sep 2023
STP Report of Sneh Kunj PDFFile: STP Report of Sneh Kunj PDF.pdf1 Sep 2023
ZR BelagaviFile: ZR Belagavi.pdf1 Sep 2023
Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23with CA UDIN along with sFile: 2020-21.pdf4 Aug 2023
Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23with CA UDIN along with sFile: CA Udin-2021-22.pdf4 Aug 2023
Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23with CA UDIN along with sFile: BS-P&L-2022-23.pdf4 Aug 2023
Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23with CA UDIN along with sFile: Declaration of CA UDIN 2022-23.pdf4 Aug 2023
Bank account name should be as per bank account direction circular.File: RERA Account Abbreviation.pdf4 Aug 2023
What are all the sources of funds to complete the project? With supporting documents.File: Source of Funds Revised with Relevant Documents.pdf4 Aug 2023
Upload Proprietorship registration certificate.File: Self Declaration of Proprietorship PDF.pdf4 Aug 2023
Need to uploaded firm registration certificate instead of GSTFile: Self Declaration of Proprietorship PDF.pdf4 Aug 2023
need advocate search reportFile: Advocate Search Report.pdf4 Aug 2023
need to upload latest approved sanction plan for the current projectFile: Approved Plan of Current Project.pdf4 Aug 2023
Height of the building mentioned in the development details page is not matching with the sanction pFile: Self Declration of Building Height PDF.pdf4 Aug 2023
Upload certified Carpet area calculation.File: Carpet Area Calculation Sheet PDF.pdf4 Aug 2023
Upload CDP map showing the proposed site.File: CDP Extract Plan Copy CTS No-3360.pdf4 Aug 2023
Upload village map showing the proposed site. (CTS EXTRACT MAP)File: Village Map Copy.pdf4 Aug 2023
As per the Zr is the pent house space slaable / habitable space Clarify.File: Rectifcation of Penthouse.pdf4 Aug 2023
Built up area / Number of units in the KSPCB NOC is not matching with the sanction Plan.File: Declaration of KSPCB NOC Sneh Kunj PDF.pdf4 Aug 2023
Please upload the land calculation sheet as per the guidance values self attested copy.File: Land Value Calculation Sheet PDF.pdf4 Aug 2023
STP design report not certified by the concerned Engineer.File: STP DRAWING SNEH KUNJ.pdf4 Aug 2023
STP design report not certified by the concerned Engineer.File: STP Report of Sneh Kunj PDF.pdf4 Aug 2023
Uploaded project specification not certified by the Engineer.File: Project Specification of Sneh Kunj PDF.pdf4 Aug 2023
Please upload the permission letter issued by Karnataka Ground water Authority along with the bore wFile: Declaration of KGWA NOC.pdf4 Aug 2023
Please upload the Amenities and common area details certified by the Engineer.File: Certified Amenties & Common Area Details PDF.pdf4 Aug 2023
Registration CertificateFile: GST CERTIFICATE.pdf-
Certificate issued by CA Form 1File: Form No-1 CA (PR).pdf-
Certificate issued by Architect Form 2File: Form No-2 Architect.pdf-
Certificate issued by Engineer Form 3File: Form No-3 Engineer.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigations- Own Land without Mortgage PDFf.pdf-
Certificate from Chartered AccountFile: Form No-1 CA (PR).pdf-
Balance Sheet 2021 - 2022File: BALANCE SHEET SNEH KUNJ.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet 21-22.pdf-
Balance Sheet 2019 - 2020File: PROFIT LOSS 2020-21_compressed.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PROFIT LOSS 2021-22-31-32.pdf-
Audited Profit and Loss Statement 2020 - 2021File: PROFIT LOSS 2020-21_compressed.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PROFIT LOSS 2019-20-22-23.pdf-
Auditor's Report 2019 - 2020File: PROFIT LOSS 2020-21_compressed.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 2021-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2020-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2019-20.pdf-
Commencement Certificate-
HESCOM NOC_compressed-
WATER NOC WITH DD_compressed-
Single Plot Order & Plan Copy-
APPROVED DRAWING SNEH KUNJ-
Single Plot Order & Plan Copy-
SECTIONAL ELEVATION ONLY-Model-
Project Specification of Sneh Kunj PDF-
APPROVED DRAWING SNEH KUNJ-
STABILITY CERTIFICATE SNEH KUNJ-
Sale Deed to Sneh Associates-
NA Order_compressed-
Title Deed Copy-
Agreement of Sale Proforma Sneh Kunj PDF-
ALLOTMENT LETTER SNEH KUNJ PDF-
Form B - Declaration PDFf_compressed-
Affidavit - Non Violation of Section 3(1)-Individual PDFf-
HESCOM NOC_compressed-
WATER NOC WITH DD_compressed-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB-
Unnamed document-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep SNEH KUNJ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

2 kmSNEH KUNJOther 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 67 registered projects within 2 km.

Builder: SNEHA ASSOCIATES

SNEHA ASSOCIATES has 1 registration on RERA Karnataka, including SNEH KUNJ. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if SNEH KUNJ is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SNEH KUNJ?

The registered promoter entity is SNEHA ASSOCIATES, a proprietorship as per the filing. Its GSTIN 29ACKPM3975C1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SNEH KUNJ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SNEH KUNJ?

The professionals named in the filing: Architect: Ar. ANAND YALLAPPA AKNOJI; Engineer: Er. SHRIKANT M OULKAR; Chartered Accountant: ULHAS NARSIMHA KINI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SNEH KUNJ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SNEH KUNJ. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SNEH KUNJ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.