Home / Browse projects / Bengaluru Urban, Karnataka / SJ CLASSIQUE
SJ CLASSIQUE
RG-KA-99839 · RERA PRM/KA/RERA/1251/446/PR/020726/008784 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SJ CLASSIQUE is a Residential/Group Housing project by SJ CONSTRUCTIONS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/020726/008784 on 2 Jul 2026. Possession is promised by 30 Sep 2029. 1 of the 64 units on this registration are recorded sold or booked, and 0 of 15 construction stages are filed complete.
At a glance
Project
- NameSJ CLASSIQUE
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560087
- Pincode560087
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/020726/008784
- ReraGenie IDRG-KA-99839
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on2 Jul 2026
- Promised completion30 Sep 2029
- Revised completionNone
- Buildings2 building records
- Documents filed113 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Block | - | - | - | 60 | 0 | 60 |
| B Block | - | - | - | 4 | 0 | 4 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 15 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 80%.
Building: 8% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 80% |
| Foundation footing work | 20% |
| Upto Plinth Level | 20% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 10% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| G N Srinivas | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 26.62 cr | Rs 1.90 cr |
| Payment of taxes | Rs 3.50 cr | - |
| On-site expenditure-Site Overhead | Rs 2.50 cr | Rs 49,500 |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 50.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 25.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bommu Veera Narendranath Reddy |
| Engineer | S GANDHI |
| Chartered Accountant | Payyavula Srikanth |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed113
As listed on the registration, under the names the promoter filed them with; the newest 80 of 113 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/020726/008784 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 Q2_compressed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: form-5 Archi Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| PRM/KA/RERA/1251/446/PR/200117/003182 and ARR 2022-23 Upload Annual Audit ReportFile: Annual Return Confirmation Pinnacle 22-23.pdf | 29 Jun 2026 |
| PRM/KA/RERA/1251/446/PR/200117/003182 and ARR 2022-23 Upload Annual Audit ReportFile: Form 7 Pinnacle 22-23_compressed.pdf | 29 Jun 2026 |
| PRM/KA/RERA/1251/446/PR/200117/003185 Upload annual audit report for the year 2022-23File: Annual Return COnfirmation Trillium 22-23.pdf | 29 Jun 2026 |
| PRM/KA/RERA/1251/446/PR/200117/003185 Upload annual audit report for the year 2022-23File: Form 7 Trillium 22-23_compressed.pdf | 29 Jun 2026 |
| PRM/KA/RERA/1251/446/PR/180507/001636 Upload annual audit report and quarterly report of the projecFile: Annual Return Confirmation East Breeze.pdf | 29 Jun 2026 |
| PRM/KA/RERA/1251/446/PR/180507/001636 Upload annual audit report and quarterly report of the projecFile: Form 7 EB 19-20.pdf | 29 Jun 2026 |
| PRM/KA/RERA/1251/446/PR/180507/001636 Upload annual audit report and quarterly report of the projecFile: Quarterly Update Details Q2 19-20.pdf | 29 Jun 2026 |
| PRM/KA/RERA/1251/446/PR/180507/001636 Upload annual audit report and quarterly report of the projecFile: Quarterly Update Details Q3 19-20.pdf | 29 Jun 2026 |
| PRM/KA/RERA/1251/446/PR/180507/001636 Upload annual audit report and quarterly report of the projecFile: Quarterly Update Details Q419-20.pdf | 29 Jun 2026 |
| Kindly update the flat dimension wise break up details in development details.File: Declaration for Flats Dimensions Details.pdf | 29 Jun 2026 |
| Kindly upload amenties declaration and kindly update the amenities section details properly(water anFile: Declaration for Amenities.pdf | 29 Jun 2026 |
| Kindly upload elaborated structural stability certificate clearly stating the number of floors consiFile: Final Structural Stability Certificate.pdf | 29 Jun 2026 |
| Kindly upload the Land cost calculation sheet as per the guidance value(Self-attested copy) along wiFile: Declaration for Guidance Value of Land Cost.pdf | 29 Jun 2026 |
| Kindly upload the Land cost calculation sheet as per the guidance value(Self-attested copy) along wiFile: Guidance Value Report.pdf | 29 Jun 2026 |
| Upload Partnership registration certificateFile: Firm Registration Certificate.pdf | 3 Jun 2026 |
| There is revenue from sales/ operation why it is not considered for section 3(1) violation of the acFile: Declaration for violation of sec 3(1).pdf | 3 Jun 2026 |
| Upload annual audit report and quarterly report of the previous projectFile: S J Pinnaacle fORM 7.pdf | 3 Jun 2026 |
| Upload annual audit report and quarterly report of the previous projectFile: sj pinnacle from 4.pdf | 3 Jun 2026 |
| Upload annual audit report and quarterly report of the previous projectFile: S J Trillium fORM 7.pdf | 3 Jun 2026 |
| Upload annual audit report and quarterly report of the previous projectFile: sj trilium form 4.pdf | 3 Jun 2026 |
| Upload annual audit report and quarterly report of the previous projectFile: FORM-4 eAST bREEZE.pdf | 3 Jun 2026 |
| Podi MR from 76/2 to 76/6File: MR Phodi 76-2.png | 3 Jun 2026 |
| Podi MR from 76/2 to 76/6File: MR Phodi 76-2-1.png | 3 Jun 2026 |
| Podi MR from 76/2 to 76/6File: MR Phodi 76-6.png | 3 Jun 2026 |
| EC upto dateFile: EC Till date.pdf | 3 Jun 2026 |
| Advocate Search ReportFile: Advocate Search Report.PDF | 3 Jun 2026 |
| Single Plot layout/Development plan Approved by the competent authority (Original and clearly visiblFile: single plot plan.pdf | 3 Jun 2026 |
| Single Plot layout/Development plan order Approved by the competent authority(Original and clearlyFile: single plot work order.pdf | 3 Jun 2026 |
| Building License from Local Authority Original Copy.File: building license.pdf | 3 Jun 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Approved Plan.pdf | 3 Jun 2026 |
| Upload commencement certificateFile: WILL BE UPLOADED SOON.pdf | 3 Jun 2026 |
| Kindly update the flat dimension wise break up details in development detailsFile: Flatwise Dimensions Details.pdf | 3 Jun 2026 |
| Kindly upload amenties declaration and kindly update the amenities section details properly(water anFile: Declaration for Amenites.pdf | 3 Jun 2026 |
| Kindly upload elaborated structural stability certificateFile: Structural Stability Certificate.pdf | 3 Jun 2026 |
| Kindly upload project specifications with signatureFile: SJ CLASSIQUE Project Specifications.pdf | 3 Jun 2026 |
| Kindly update the AFS with following corrections,escrow account details,possession date and defect lFile: sale agreement proforma.pdf | 3 Jun 2026 |
| Kindly update the possession date and annexure A details in allotment letter.File: ALLOTMENT LETTER- SJ Apartment.pdf | 3 Jun 2026 |
| Kindly upload the estimate duly signed by engineer only whose having valid licence,not the architectFile: Brief Estimated Cost certified by engineer.pdf | 3 Jun 2026 |
| Kindly upload the Land cost calculation sheet as per the guidance value(Self-attested copy) along wiFile: Self attested Guidance Value as per sub registrar.pdf | 3 Jun 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents anFile: Declaration of Source of water.pdf | 3 Jun 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents anFile: Borewell 1.jpeg | 3 Jun 2026 |
| Kindly clarify the main source of water supply to the project along with the supporting documents anFile: Borewell 2.jpeg | 3 Jun 2026 |
| Kindly upload the STP/septic tank/soak pit/sewer line drawing with full project name and address aloFile: STP certified by engineer.pdf | 3 Jun 2026 |
| Google Image with Latitude and LogitudeFile: Google Maps image with Latitude and Longitude.jpeg | 3 Jun 2026 |
| RTC, survey 76/6 | - |
| Mutation, survey 76/6 | - |
| Encumbrance Certificate, survey 76/6 | - |
| Conversion/Alienation Order, survey 76/6 | - |
| Sale/Title/Gift Deed, survey 76/6 | - |
| JDA, survey 76/6 | - |
| Khatha, survey 76/6 | - |
| Registration CertificateFile: Reconstitution Prantership deed.pdf | - |
| GST CertificateFile: GST Certificate.pdf | - |
| Partnership DeedFile: Reconstitution Prantership deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form -1 SJ Classique.pdf | - |
| Certificate issued by Architect Form 2File: Form -2 Architect.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: No litigation Affidavit.pdf | - |
| Balance Sheet 2024 - 2025File: BS 25-26.pdf | - |
| Balance Sheet 2023 - 2024File: BS 24-25.pdf | - |
| Balance Sheet 2022 - 2023File: BS 23-24.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: P&L 25-26.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: P&L 24-25.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: P&L 23-24.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: ITR 25-26.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR 24-25.pdf | - |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SJ Park Ville | Sy No. 32/2, 42/1, 42/3 and 43/2, Gullekaipura Village, Anugondanahalli Hobli, Hoskote Taluk | Ongoing | Dec 2029 | Not due yet |
| SJ TRILLIUM | Sy No. 71/7, Near Anjaneya Temple, Varthur Village, Varthur Hobli | Completed | - | No date filed |
| SJ PINNACLE | Sy No. 5/4, 5/7, 5/8, Katha No. 2882, Varthuru Village, Bangalore | Completed | - | No date filed |
| East Breeze | Sy No. 164/2, 164/5, 164/6, 164/7, 164/8, 164/9, Hagadur, Whitefield, Immadihalli Main Road | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SJ CLASSIQUE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 77 registered projects within 2 km.
Prestige Lavender Fields
Prestige Office Ventures
Brigade Sanctuary
Brigade Enterprises Ltd
MYHNA VISTARA
MYHNA PROPERTIES PRIVATE LIMITED
ABHEE AARIA
ABHEE VENTURES PRIVATE LIMITED
ABHEE CITY URBAN GLENN PHASE II
ABHEE VENTURES PRIVATE LIMITED
GODREJ PARK RETREAT
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SJ CONSTRUCTIONS
SJ CONSTRUCTIONS has 4 registrations on RERA Karnataka, including SJ PARK VILLE and SJ CLASSIQUE. Its filings declare 4 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SJ CLASSIQUE is delayed beyond 30 Sep 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SJ CLASSIQUE?
The registered promoter entity is SJ CONSTRUCTIONS, a partnership firm as per the filing. Its GSTIN 29ADCFS7935H1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SJ CLASSIQUE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SJ CLASSIQUE?
The professionals named in the filing: Architect: Bommu Veera Narendranath Reddy; Engineer: S GANDHI; Chartered Accountant: Payyavula Srikanth. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SJ CLASSIQUE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.