SHRIVALLABHA PRATISHTHA

By DEEPAK GURUNATH GOJAGEKAR

RG-KA-82020 · RERA PRM/KA/RERA/1249/447/PR/200117/003204 · Last updated on RERA Karnataka portal: 7 Sep 2023

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2024Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 110 documents Report an error

SHRIVALLABHA PRATISHTHA is a Residential/Group Housing project by DEEPAK GURUNATH GOJAGEKAR in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/200117/003204 on 17 Jan 2020. Possession is promised by 30 Mar 2024. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameSHRIVALLABHA PRATISHTHA
  • TypeResidential/Group Housing
  • Location
    • Belagavi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1249/447/PR/200117/003204
  • ReraGenie IDRG-KA-82020

Builder

  • NameDEEPAK GURUNATH GOJAGEKAR
  • Entity typeOther
  • Authorized SignatoryDEEPAK GURUNATH GOJAGEKAR

Key dates

this monthRegisteredJan 2020First promiseJun 2023Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Jan 2020
  • Promised completion30 Mar 2024
  • Revised completionRevised to 30 Mar 2024 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed110 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRIVALLABHA PRATISHTHA---90090

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 7 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 7 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,990 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 22.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKapil Desai
EngineerPrashant S. Hadkar

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2023 → Mar 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed110

As listed on the registration, under the names the promoter filed them with; the newest 80 of 110 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/200117/003204 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
ABOUT FARFile: ABOUT FAR.pdf7 Sep 2023
ENGINEER CERTIFICATE IN FORMATFile: Form No 6.pdf7 Sep 2023
ABOUT AIR PORT NOCFile: ABOUT AIR PORT NOC.pdf7 Sep 2023
CCZM GRID OF BELGAUMFile: CCZMGrid_Belgaum.pdf7 Sep 2023
CONSENT LETTERFile: 20 CONSENT LETTER.pdf7 Sep 2023
confirmation letter certified by Engineer about airport NOCFile: Eng confirmation for Airport NOC.pdf7 Sep 2023
COPY OF ZR/BYE LAW SHOWING EXEMPTION OF PENT HOUSE AREA FOR FAR AND BUILT UP AREAFile: ZR.pdf12 Jul 2023
BHK WISE BREAK UP DETAILS AS PER MODIFIED PLANFile: BHK wise Breakup Details Builders.pdf12 Jul 2023
BHK WISE BREAK UP DETAILS AS PER MODIFIED PLANFile: BHK wise breakup Details Engineer.pdf12 Jul 2023
SOLD AND UNSOLD DETAILS WITH ABSTRACTFile: Sold and Unsold Details.pdf12 Jul 2023
ABOUT AIR PORT NOCFile: Airport NOC.pdf12 Jul 2023
2/3 CONSENT OF ALLOTEEFile: Consent letter Allottees_compressed.pdf12 Jul 2023
Cash Flow statement 2016-17File: CASHFLOW-16-17.pdf13 Jan 2020
Cash Flow statement 2017-18File: CASHFLOW-17-18.pdf13 Jan 2020
Cash Flow Statement 2018-19File: CASHFLOW-18-19.pdf13 Jan 2020
Auditor Report 2016-17File: Auditor report 2016-17.pdf13 Jan 2020
Auditor Report 2017-18File: Auditor Report 2017-18.pdf13 Jan 2020
Auditor Report 2018-19File: Auditor Report 2018-19.pdf13 Jan 2020
Sale Deed with first pageFile: Sale Deed with first page.pdf13 Jan 2020
Proprietorship firm GST certificateFile: About Partnership Deed.pdf13 Jan 2020
Project head DetailsFile: Project head details.pdf13 Jan 2020
Number of flat floor wiseFile: Number of flat floor wise.pdf13 Jan 2020
Already registered project ongoing detailsFile: FORM 6.pdf-
Modified plan details site plan, floor plans, Plan Licence LetterFile: Order Copy.pdf-
Elevation, Sections, Specifications ( If changes are there )File: Permission Drawing.pdf-
List Of AllotteesFile: Form 4 wherein sold-unslod details.pdf-
Consent LetterFile: consent letter 1.pdf-
Chartered Accountant CertificateFile: FORM 4.pdf-
Notarized AffidavitFile: affidavit cum declaration.pdf-
Engineer CertificateFile: FORM 6.pdf-
Architect CertificateFile: FORM 5.pdf-
Structural Engineer Certificate for stability of structureFile: Stability Certificate (2).pdf-
Modification of Plan DetailsFile: Approved plan.pdf-
Modification of Plan DetailsFile: Permission Drawing.pdf-
Modification of Plan DetailsFile: Commencment Certificate.jpeg-
Modification of Plan DetailsFile: Order Copy.pdf-
Modification of Plan DetailsFile: Form 4 wherein sold-unslod details.pdf-
Modification of Plan DetailsFile: Form 4 wherein sold-unslod details.pdf-
consent letterFile: Mahesh Bhirangi.pdf-
consent letterFile: Mohan Naik.pdf-
consent letterFile: Nilesh Nadkarni.pdf-
consent letterFile: Pradyumkumar Hukkeri.pdf-
consent letterFile: Ramesh Kolekar.pdf-
Commencment Certificate-
Approved plan-
Not yet done-
Not yet done-
SALEDEED (1)-
Approved plan-
Approved plan-
Not yet done-
Not yet done-
18-12-2019 - SPECIFICATION-
12 yrs EC-
affidavit under 3 (1)-
khata-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Fire NOC-
Unnamed document-
HESCOM NOC-
WATER NOC-
Pollution NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Approved plan-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one moved by 9 months
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep SHRIVALLABHA PRATISHTHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

Builder: DEEPAK GURUNATH GOJAGEKAR

DEEPAK GURUNATH GOJAGEKAR has 1 registration on RERA Karnataka, including SHRIVALLABHA PRATISHTHA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if SHRIVALLABHA PRATISHTHA is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHRIVALLABHA PRATISHTHA?

The registered promoter entity is DEEPAK GURUNATH GOJAGEKAR. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHRIVALLABHA PRATISHTHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHRIVALLABHA PRATISHTHA?

The professionals named in the filing: Architect: Kapil Desai; Engineer: Prashant S. Hadkar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRIVALLABHA PRATISHTHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRIVALLABHA PRATISHTHA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRIVALLABHA PRATISHTHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.