ReraGenieLog inGet a buyer report

Home / Browse projects / Belagavi, Karnataka / SHRISAI RESIDENCY

Registration approved No litigation declared Residential/Group Housing project

SHRISAI RESIDENCY

By R K ASSOCIATES AND BUILDERS, PROP. RADHA KRISHNA HIRAPACHE

RG-KA-64198 · RERA PRM/KA/RERA/1249/447/PR/181122/005473 · Last updated on RERA Karnataka portal: 26 Oct 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 75 documents Report an error

SHRISAI RESIDENCY is a Residential/Group Housing project by R K ASSOCIATES AND BUILDERS, PROP. RADHA KRISHNA HIRAPACHE in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/181122/005473 on 18 Nov 2022. Possession is promised by 30 Jun 2025.

At a glance

Project

  • NameSHRISAI RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Belagavi
    • 590005
  • Pincode590005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1249/447/PR/181122/005473
  • ReraGenie IDRG-KA-64198

Builder

  • NameR K ASSOCIATES AND BUILDERS, PROP. RADHA KRISHNA HIRAPACHE
  • Entity typeProprietorship Firm
  • GSTIN29ALUPH9390K1Z1
  • Authorized SignatoryRADHA KRISHNA HIRAPACHE

Key dates

this monthRegisteredNov 2022PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Nov 2022
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRISAI RESIDENCY---10010

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 26 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area297 sq m
Named landowners1
LandownerVillageDistrict
RADHA KRISHNA HIRAPACHE--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.12 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.12 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAILENDRA SADASHIV ARBOLE
EngineerUDAY KALKUNDRIKAR
Chartered AccountantSANDEEP KAJUKAR

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed75

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/181122/005473 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Proprietorship Firm registration certificateFile: Prop Certificate (GST Certificate).pdf26 Oct 2022
Bank Letter for RERA designated account of projectFile: Bank letter for project account.pdf26 Oct 2022
2020-2021 and 2019-20 balance sheet, profit and loss accountFile: BALANC SHEET AND P AND L.pdf26 Oct 2022
self attested PANFile: self attested PAN.pdf26 Oct 2022
No litigation affidavit with land owner signatureFile: No litigation affidavit.pdf26 Oct 2022
title deed of ramesh maruti and othersFile: Title deed of Maruti Sawant and others.pdf26 Oct 2022
certified copy of the land valuation certificate obtained from Sub Registrar of BelagaviFile: Radha Land valuation certificate.pdf26 Oct 2022
No. of car parking slotsFile: ABOUT CAR PARKING ALLOTMENT.pdf26 Oct 2022
brief estimated cost of the construction certified by EngineerFile: Hirrapache estimate-final_compressed.pdf26 Oct 2022
stability certificate for proposed buildingFile: Stability certificate.pdf26 Oct 2022
undertaking for water supplyFile: undertaking for water supply.pdf26 Oct 2022
sewer line drawingFile: Chamber line drawing.pdf26 Oct 2022
Proforma of allotment letterFile: draft of allotment letter.pdf26 Oct 2022
draft of agreement of sale as notifiedFile: Agreement of Sale Proforma (1).pdf26 Oct 2022
Registration CertificateFile: GST Certificate.pdf-
Certificate issued by CA Form 1File: CA Form 1.pdf-
Certificate issued by Architect Form 2File: RERA-FORM-2-Architect (1).pdf-
Certificate issued by Engineer Form 3File: Eng Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: No litigation affidavit.pdf-
Certificate from Chartered AccountFile: CA Form 1.pdf-
Balance Sheet 2021 - 2022File: Balance sheet 21-22.pdf-
Audited Profit and Loss Statement 2021 - 2022File: P abd L 21-22.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: IT Ack 22-23.pdf-
Building permission-
HESCOM NOC with Fees receipt_compressed-
water NOC Hirappache-
LAYOUT COPY-
Approved plan-
LAYOUT COPY-
Approved plan-
Approved plan-
Project specification-
Approved plan-
Approved plan-
legal opinion-
Agreement of Sale (2) (2)-
NOT YET Finalized-
Not yet done-
Form B-
Sec 3 Affidavit-
HESCOM NOC with Fees receipt_compressed-
water NOC Hirappache-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Radha Land valuation certificate-
Water NOC DD-
NA ORDER-
Commencement Certificate-
Bhagyanagar+Angol+vadgaon+khasbag+shastrinagar+tilakwadi+ Hindwadi-
Prospectus/BrochureFile: 1722410339572.jpg-
Advertisement Copy 1File: 1722410339572.jpg-
Advertisement Copy 2File: PSX_20221209_170456.jpg-
Advertisement Copy 3File: PSX_20221209_170230.jpg-
Advertisement Copy 4File: PSX_20221209_170100.jpg-
Occupancy CertificateFile: COMPLETION CERTIFICATE.pdf-
Completion certificate issued by the competent authorityFile: COMPLETION CERTIFICATE.pdf-
Registered Agreement of SaleFile: RADHA K HIRAPACHE_compressed-compressed.pdf-
Registered conveyance deed for an individual unitFile: RADHA K HIRAPACHE_compressed-compressed.pdf-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep SHRISAI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

2 kmSHRISAI RESIDENCYOther 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: R K ASSOCIATES AND BUILDERS, PROP. RADHA KRISHNA HIRAPACHE

R K ASSOCIATES AND BUILDERS, PROP. RADHA KRISHNA HIRAPACHE has 1 registration on RERA Karnataka, including SHRISAI RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if SHRISAI RESIDENCY is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHRISAI RESIDENCY?

The registered promoter entity is R K ASSOCIATES AND BUILDERS, PROP. RADHA KRISHNA HIRAPACHE, a proprietorship firm as per the filing. Its GSTIN 29ALUPH9390K1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHRISAI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHRISAI RESIDENCY?

The professionals named in the filing: Architect: SHAILENDRA SADASHIV ARBOLE; Engineer: UDAY KALKUNDRIKAR; Chartered Accountant: SANDEEP KAJUKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRISAI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRISAI RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRISAI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.