Valid until 31 Dec 2029 Mixed Development project

SHREENILAY EMPIRE

By SHREENILAY INFRA

RG-GJ-83592 · RERA PR/GJ/GANDHINAGAR/MANSA/Mansa Municipality/MAA16945/030626/311229 · Last updated on GujRERA portal: 3 Jun 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Dec 2029Possession promisedno revision filed
0 of 54Construction stages doneacross 6 buildings; furthest along: Excavation, 50%
160 of 160Units unsoldnot recorded sold or booked
Jump to the 31 documents Report an error

SHREENILAY EMPIRE is a Mixed Development project by SHREENILAY INFRA in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/MANSA/Mansa Municipality/MAA16945/030626/311229 on 3 Jun 2026. Possession is promised by 31 Dec 2029. 0 of the 160 units on this registration are recorded sold or booked, and 0 of 54 construction stages are filed complete.

At a glance

Project

  • NameSHREENILAY EMPIRE
  • TypeMixed Development
  • Location
    • MANSA GANDHINAGAR HIGHWAY
    • TA. MANSA
    • DIST. GANDHINAGAR.
    • MANSA
    • Gandhinagar
    • 382845
  • Pincode382845
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/MANSA/Mansa Municipality/MAA16945/030626/311229
  • ReraGenie IDRG-GJ-83592

Builder

  • NameSHREENILAY INFRA
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJun 2026PromisedDec 2029

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2029
  • Registered on3 Jun 2026
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings6 building records
  • Documents filed31 files

Current status

0%0 of 160 units booked
1.0%Of the estimated cost spent so far

Figures as on 3 Jun 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A---27027
BLOCK B---27027
BLOCK C---26026
BLOCK D---26026
BLOCK E---26026
COMMERCIAL---02828

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 54 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 50%.

BLOCK A6%
ActivityProgress
Excavation50%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BLOCK B6%
ActivityProgress
Excavation50%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BLOCK C6%
ActivityProgress
Excavation50%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BLOCK D6%
ActivityProgress
Excavation50%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
BLOCK E6%
ActivityProgress
Excavation50%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
COMMERCIAL6%
ActivityProgress
Excavation50%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationYes0%
Use of renewable energyYes0%
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,936 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 22.50 cr
Cost incurredRs 23.50 lakh
Spent of the estimate1.04%
BuildingWingEstimatedIncurred
COMMERCIALNARs 7.00 crRs 50,000
BLOCK ANARs 4.00 crRs 5.00 lakh
BLOCK BNARs 4.00 crRs 5.00 lakh
BLOCK CNARs 2.50 crRs 5.00 lakh
BLOCK DNARs 2.50 crRs 5.00 lakh
BLOCK ENARs 2.50 crRs 3.00 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHAVAL NATUBHAI MEWADA
EngineerNITINKUMAR PATEL

Documents filed31

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/MANSA/Mansa Municipality/MAA16945/030626/311229 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA registration certificate3 Jun 2026
Architect's certificate (Form 1)17 Apr 2026
Engineer's certificate (Form 2)17 Apr 2026
Engineer's certificate annexure17 Apr 2026
Accountant's certificate (Form 3)17 Apr 2026
Site photograph, BLOCK A16 Apr 2026
Site photograph, BLOCK B16 Apr 2026
Site photograph, BLOCK C16 Apr 2026
Site photograph, BLOCK C16 Apr 2026
Site photograph, BLOCK D16 Apr 2026
Site photograph, BLOCK E16 Apr 2026
Site photograph, COMMERCIAL16 Apr 2026
Proforma agreement for sale-
Project specific document-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Other document-
Project photograph-
Proforma sale deed-

How this compares with Gandhinagar

0%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one has not

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep SHREENILAY EMPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near MANSA1,600+ in Gandhinagar

2 kmSHREENILAY EMPIREOther 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: SHREENILAY INFRA

SHREENILAY INFRA has 1 registration on GujRERA, including SHREENILAY EMPIRE. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if SHREENILAY EMPIRE is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHREENILAY EMPIRE?

The registered promoter entity is SHREENILAY INFRA, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHREENILAY EMPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHREENILAY EMPIRE?

The professionals named in the filing: Architect: DHAVAL NATUBHAI MEWADA; Engineer: NITINKUMAR PATEL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREENILAY EMPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREENILAY EMPIRE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREENILAY EMPIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.