SHREE SWAMI SAMARTH SANKALP RESIDENCY is a Residential/Group Housing project by AADISHAKTI CONSTRUCTION COMPANY in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/221123/006420 on 22 Nov 2023. Possession is promised by 16 Sep 2025.
At a glance
Project
- NameSHREE SWAMI SAMARTH SANKALP RESIDENCY
- TypeResidential/Group Housing
- Location
- Belagavi
- PincodeNot stated
- RERA no.PRM/KA/RERA/1249/447/PR/221123/006420
- ReraGenie IDRG-KA-20546
Builder
- NameAADISHAKTI CONSTRUCTION COMPANY
- Entity typePartnership Firm
- GSTIN29ABRFA0152F1Z1
- Authorized SignatoryMR. PRAMOD PUNDALIK PATIL
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Nov 2023
- Promised completion16 Sep 2025
- Revised completionNone
- Buildings1 building record
- Documents filed119 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE SWAMI SAMARTH SANKALP RESIDENCY | - | - | - | 25 | 0 | 25 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 10 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 10 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | Yes | - |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PRAMOD PUNDALIK PATIL PARTNER AADISHAKTI CONSTRUCTION COMPANY | - | - |
| PRAMOD PUNDALIK PATIL PARTNER AADISHAKTI CONSTRUCTION COMPANY | - | - |
| PRAMOD PUNDALIK PATIL PARTNER AADISHAKTI CONSTRUCTION COMPANY | - | - |
| PRAMOD PUNDALIK PATIL PARTNER AADISHAKTI CONSTRUCTION COMPANY | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 4.50 cr | - |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 96.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 21.24 lakh | - |
| On-site expenditure-Site Overhead | Rs 12.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. AAISHWARYA MOHAN LAD |
| Engineer | Er. MOHAN. P. LAD |
| Chartered Accountant | ANIL. S. MANDOLKAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed119
As listed on the registration, under the names the promoter filed them with; the newest 80 of 119 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/221123/006420 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Sales of rupees 2,36,48,000 happened during 2022 please clarify ( Upload bank account statements )File: Clarification Certificate from CA.pdf | 10 Nov 2023 |
| bank account statementsFile: RERA 21298 Statement.pdf | 10 Nov 2023 |
| bank account statementsFile: RERA 21289 Statement.pdf | 10 Nov 2023 |
| bank account statementsFile: RERA 21270 Statement.pdf | 10 Nov 2023 |
| Invalid UDIN mentioned in the financial statement please clarifyFile: Clarification for Invalid UDIN Details.pdf | 10 Nov 2023 |
| CA UDINFile: adishakti con 2022.pdf | 3 Nov 2023 |
| Please upload the self-attested copy of the renewed Engineer's license certificateFile: Engineer Licence Renewed (1).pdf | 3 Nov 2023 |
| PLC CERTIFICATEFile: Plinth Level Certificate (2).pdf | 3 Nov 2023 |
| Cost Details on the cost detail Details on the cost as per the CA & Engineer certificate.File: Undertaking Cum Declaration of Construction Cost.pdf | 3 Nov 2023 |
| Construction CostFile: Construction Cost (1) (1).pdf | 3 Nov 2023 |
| Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: ITR 2021-22 P&L.pdf | 10 Oct 2023 |
| The cost of land is not reflected in the financial statement please clarify.File: Land Cost in Financial Statement PDF.pdf | 10 Oct 2023 |
| Upload a Certificate of Authorization with partners attested with the seal on letterhead and firm PFile: Declaration for Authorised Signatory PDF.pdf | 10 Oct 2023 |
| Notarized form-B in prescribed RERA Format on Stamp paper.File: Form-B Affidavit.pdf | 10 Oct 2023 |
| Khata Certificate and Khata Extract issued by the local Authority Belagavi Mahanagara Palike.File: Khata Copy_organized.pdf | 10 Oct 2023 |
| Guidance Value certificate issued by the Sub RegisterFile: SR Guidance Value (1).pdf | 10 Oct 2023 |
| Guidance Value certificate issued by the Sub RegisterFile: Self Declration of Land Value Calculaion for Swami Samarth PDF.pdf | 10 Oct 2023 |
| Upload Architects certificate(For On going Project)File: F5 Architect (QU) Swami Samarth PDF.pdf | 10 Oct 2023 |
| Upload commencement certificateFile: Self Declration of Commenecement Certificate Swami Samarth PDF.pdf | 10 Oct 2023 |
| Amenities and common area details properly as per the sanctioned drawing along with the area calculaFile: Certified Amenties & Common Area Details PDF.pdf | 10 Oct 2023 |
| Please upload the self-attested copy of the renewed Engineer's license certificate.File: Engineer Licence Revised.pdf | 10 Oct 2023 |
| self-attested copy of the Water supply NOC and Power supply NOC along with the copy of fee receipt.File: Self Attested Hescom NOC.pdf | 10 Oct 2023 |
| self-attested copy of the Water supply NOC and Power supply NOC along with the copy of fee receipt.File: Self Declration of HESCOM Paid Receipt for Shree Swami Samarth PDF_removed_removed.pdf | 10 Oct 2023 |
| self-attested copy of the Water supply NOC and Power supply NOC along with the copy of fee receipt.File: Self Attested Water NOC.pdf | 10 Oct 2023 |
| self-attested copy of the Water supply NOC and Power supply NOC along with the copy of fee receipt.File: Self Declration of Water Supply Paid Receipt Shree Swami Samarth_removed.pdf | 10 Oct 2023 |
| original copy of notarized section 3(1) affidavit(Colour copy).File: Non-Violation Affidavit.pdf | 10 Oct 2023 |
| Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: ITR 2021-22.pdf | 10 Oct 2023 |
| Registration CertificateFile: Firm Registration.pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form No-1 CA Revised.pdf | - |
| Certificate issued by Architect Form 2File: Form No-2 Architect (PR).pdf | - |
| Certificate issued by Engineer Form 3File: Form No-3 Engineer (PR).pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non-Litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form No-1 CA Revised.pdf | - |
| Balance Sheet 2021 - 2022File: ITR 2022-23 P&L.pdf | - |
| Balance Sheet 2020 - 2021File: ITR 2021-22.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: ITR 2022-23 P&L.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: ITR 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR 2022-23 P&L.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR 2021-22.pdf | - |
| Commencement Certificate | - |
| HESCOM NOC | - |
| Water NOC | - |
| Amalgamation Plan Copy | - |
| Approved Plan_compressed | - |
| Approved Plan_compressed | - |
| Project Specification of Swami Samarth Sankalp PDF | - |
| SOUNDNESS STABILITY CERTIFICATE | - |
| Advocate Search Report | - |
| SALE DEED | - |
| NA Order Copy (2) | - |
| Single Plot Order Copy | - |
| Khata Copy | - |
| Agreement of Sale Proforma Shree Swami Samarth PDF | - |
| ALLOTMENT LETTER SHREE SWAMI SAMARTH PDF | - |
| Form No-B Affidavit (1) (1) | - |
| Non-Violation Affidavit | - |
| HESCOM NOC | - |
| Water NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| GOVERNMENT OF KARNATAKA FIRE | - |
| Unnamed document | - |
| KSPCB NOC-compressed | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep SHREE SWAMI SAMARTH SANKALP RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: AADISHAKTI CONSTRUCTION COMPANY
AADISHAKTI CONSTRUCTION COMPANY has 2 registrations on RERA Karnataka, including SHREE SWAMI SAMARTH SHIV RESIDENCY and SHREE SWAMI SAMARTH SANKALP RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if SHREE SWAMI SAMARTH SANKALP RESIDENCY is delayed beyond 16 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SHREE SWAMI SAMARTH SANKALP RESIDENCY?
The registered promoter entity is AADISHAKTI CONSTRUCTION COMPANY, a partnership firm as per the filing. Its GSTIN 29ABRFA0152F1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SHREE SWAMI SAMARTH SANKALP RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SHREE SWAMI SAMARTH SANKALP RESIDENCY?
The professionals named in the filing: Architect: Ar. AAISHWARYA MOHAN LAD; Engineer: Er. MOHAN. P. LAD; Chartered Accountant: ANIL. S. MANDOLKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE SWAMI SAMARTH SANKALP RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback