Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SHREE SWAMI KRUPA is a Mixed Development project by PANARE BUILDERS & DEVELOEPRS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/230125/007425 on 23 Jan 2025. Possession is promised by 10 Apr 2028.
At a glance
Project
- NameSHREE SWAMI KRUPA
- TypeMixed Development
- Location
- Belagavi
- PincodeNot stated
- RERA no.PRM/KA/RERA/1249/447/PR/230125/007425
- ReraGenie IDRG-KA-45118
Builder
- NamePANARE BUILDERS & DEVELOEPRS
- Entity typePartnership Firm
- GSTIN29AAJFP7127J1ZR
- Authorized SignatorySUDHIR C PANARE
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on23 Jan 2025
- Promised completion10 Apr 2028
- Revised completionNone
- Buildings1 building record
- Documents filed150 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE SWAMI KRUPA | - | - | - | - | - | 13 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PANARE BUILDERS & DEVELOEPRS | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 3.45 cr | - |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 2.80 cr | - |
| On-site expenditure-Consultants Fees | Rs 5.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUMIT P GAWADE |
| Engineer | SAGAR V HUDDAR |
| Chartered Accountant | SANDEEP S KAJUKAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed150
As listed on the registration, under the names the promoter filed them with; the newest 80 of 150 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/230125/007425 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 CA CERTIFICATE-Q4.pdf | 10 Jun 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Q4_25-26 ARCHITECT CERTIFICATE SHREE SWAMI KRUPA.pdf | 10 Jun 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: SSK Engineer's Certificate.pdf | 10 Jun 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 CA CERTIFICATE-Q3.pdf | 25 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Q-3 25-26 ARCHITECT CERTIFICATE SHREE SWAMI KRUPA.pdf | 25 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: SSK Q3 Engineers Certificate.pdf | 25 Mar 2026 |
| Q3 2025-26 Water supply and sewage board | 25 Mar 2026 |
| Q3 2025-26 KPTCL- BESCOM | 25 Mar 2026 |
| self attested HESCOM NOC with receiptFile: HESCOM NOC AND RECEIPT.pdf | 27 Nov 2024 |
| self attested water NOC with DD of payment receiptFile: KUIDFC NOC AND RECEIPT.pdf | 27 Nov 2024 |
| Reply NoticeFile: To - Copy.pdf | 27 Nov 2024 |
| CA certification fo the utilization of loan amount by verification of books of accountsFile: Certification from CA for funds uitilization as per books of account.pdf | 20 Oct 2024 |
| CA certification fo the utilization of loan amount by verification of books of accounts with CA UDINFile: Certification from CA for funds uitilization as per books of account1.pdf | 20 Oct 2024 |
| certified clarification about the area details in building license and plan areaFile: KRERA SECRETARY (1).pdf | 20 Oct 2024 |
| original approved building permission plan with QR code issued by the City Corporation of BelagaviFile: approved dwg panare builder with QR Code.pdf | 20 Oct 2024 |
| Reply NoticeFile: Reply Notice.pdf | 20 Oct 2024 |
| Building licenseFile: SHREE SWAMI KRUPA PERMISSION ORDER COPY with QR CODE.pdf | 20 Oct 2024 |
| Certification by CA for the utilization of loan amount by verification of books of accountsFile: Certification from CA for funds uitilization as per books of account.pdf | 26 Sep 2024 |
| Original copy of Building license from local authority with QR codeFile: SHREE SWAMI KRUPA PERMISSION ORDER COPY with QR CODE.pdf | 26 Sep 2024 |
| Approved building plan - Original - with QR codeFile: approved dwg panare builder with QR Code - Copy.pdf | 26 Sep 2024 |
| about Phase wise Development phase demarcation drawingsFile: about phase wise development.pdf | 26 Sep 2024 |
| pload all sanctioned original drawings, floor plan, sectional drawings and elevationsFile: Sectional, floor and elvation plan with QR Code.pdf | 26 Sep 2024 |
| verification of Architects COA number on COA websiteFile: Council of Architecture.pdf | 26 Sep 2024 |
| Commencement certificate (Plinth level)File: Plinth level certificate SSK.pdf | 26 Sep 2024 |
| Original modified Building license from Local Authority since same consist of QR CodeFile: SHREE SWAMI KRUPA PERMISSION ORDER COPY with QR CODE.pdf | 12 Sep 2024 |
| original approved building plan with QR CODEFile: approved dwg panare builder with QR Code.pdf | 12 Sep 2024 |
| all sanctioned original drawing, floor plan, sectional drawing and elevation all in one sheetFile: Sectional, floor and elvation plan with QR Code.pdf | 12 Sep 2024 |
| verification of validity of COA certificate from the COA websiteFile: Council of Architecture.pdf | 12 Sep 2024 |
| original commencement certificateFile: Plinth level certificate SSK.pdf | 12 Sep 2024 |
| about Phase wise Development phase demarcation drawings certified by the project ArchitectFile: about phase wise development.pdf | 12 Sep 2024 |
| CA certificate for Fund utilization of loan amount with UDINFile: FUNDS UTILISATION CERTIFICATE.pdf | 9 Aug 2024 |
| CDP map showing the proposed siteFile: CDP - DEMARCATED SITE PLAN.jpg | 9 Aug 2024 |
| CTS Map-Village MapFile: CTS Map- Village Map.pdf | 9 Aug 2024 |
| self attested HESCOM NOC with receiptFile: HESCOM NOC AND RECEIPT.pdf | 9 Aug 2024 |
| self attested water NOC with DD of payment receiptFile: KUIDFC NOC AND RECEIPT.pdf | 9 Aug 2024 |
| modified permission plan with QR CodeFile: SSK Permission Drawing.pdf | 9 Aug 2024 |
| modified permission order letter (Building license) with QR CodeFile: SSK Permission order.pdf | 9 Aug 2024 |
| certified carpet area as per modified planFile: certified carpet area calculations as per modified plan.pdf | 9 Aug 2024 |
| clarification about deletion/rectification of project land detailsFile: about editing part of project land.pdf | 9 Aug 2024 |
| about units in the Project details pageFile: about units details in the project (2).pdf | 9 Aug 2024 |
| about loan amountFile: About Loan Amount SSK.pdf | 23 Jun 2024 |
| Source of fund with supporting documentsFile: Source of fund with supporting document.pdf | 23 Jun 2024 |
| financial with self attested schedule for 2022-23File: ITR with self attested schedule 2022-23.pdf | 23 Jun 2024 |
| Financial with self attested schedule for 2023-24File: ITR with Sefl attested schedule for 2023-24.pdf | 23 Jun 2024 |
| Financial with schedule for 2021-22File: ITR with schedule 2021-22.pdf | 23 Jun 2024 |
| about sale deed for 4 NumbersFile: about Sale Deed in respect of concern survey .pdf | 23 Jun 2024 |
| about single plot layout orderFile: about single plot layout order and its plan.pdf | 23 Jun 2024 |
| about single plot layout planFile: about single plot layout order and its plan.pdf | 23 Jun 2024 |
| Village Map (CTS Map)File: CTS MAP SSK.pdf | 23 Jun 2024 |
| draft of agreement of saleFile: Draft of Agreement of sale.pdf | 23 Jun 2024 |
| certified brief estimation by engineerFile: SHREE SWAMI KRUPA ESTIMATION FOR RERA - Abstract.pdf | 23 Jun 2024 |
| sewer line drawingFile: SITE PLAN WITH SANITARY LINE.pdf | 23 Jun 2024 |
| Form 6 of EngineerFile: Form -6, Engineer (QU).pdf | 23 Jun 2024 |
| about HESCOM and water NOCFile: about HESCOM and Water NOC.pdf | 23 Jun 2024 |
| about loan amountFile: About Loan Amount SSK.pdf | 1 May 2024 |
| current year RTCFile: RTC Copy 23-24.pdf | 1 May 2024 |
| connected MRFile: Diaries_compressed.pdf | 1 May 2024 |
| EC from 30/11/2022 till dateFile: EC FROM 01-12-2022 To 22-04-2024 (ssk).pdf | 1 May 2024 |
| connected CTSFile: CTS Exract.pdf | 1 May 2024 |
| about conversion order issued by Deputy commissionerFile: NA Copy.pdf | 1 May 2024 |
| about single plot layout and its orderFile: about single plot layout order and its plan.pdf | 1 May 2024 |
| Certified carpet area calculationFile: carpet area calculations SSK.pdf | 1 May 2024 |
| Village Map (CTS Map)File: CTS MAP SSK.pdf | 1 May 2024 |
| land cost calculationFile: ABOUT LAND COST FOR SSK.pdf | 1 May 2024 |
| Project specification with project name and addressFile: specification SSK.pdf | 1 May 2024 |
| common area and amenities calculationsFile: Common Area Calculation sheet.pdf | 1 May 2024 |
| Receipt (DD) for Water NOCFile: DD for KUIDFC.pdf | 1 May 2024 |
| Receipt of HESCOM NOCFile: HESCON NOC FEES RECEIPT SSK.pdf | 1 May 2024 |
| Sewer Line DrawingFile: SITE PLAN WITH SANITARY LINE.pdf | 1 May 2024 |
| About Pollution NOCFile: about Pollution NOC.pdf | 1 May 2024 |
| about SEIAA NOCFile: about SEIAA NOC.pdf | 1 May 2024 |
| about Relinquishment DeedFile: ABOUT RELINQISHMENT DEED.pdf | 1 May 2024 |
| about Sale Deed in respect of concern 4 entriesFile: about Sale Deed in respect of concern survey .pdf | 1 May 2024 |
| about FARFile: about FAR.pdf | 1 May 2024 |
| Commencement CertificateFile: Plinth level certificate SSK.pdf | 1 May 2024 |
| No litigation affidavitFile: Affidavit Non Litigation.pdf | 1 May 2024 |
| Draft of agreement as notifiedFile: Draft of Agreement of sale.pdf | 1 May 2024 |
| sanction drawing consist of sectional, all floor & elevation reflected in single page approvedbyCCBFile: approved Building permission Plan.pdf | 1 May 2024 |
| Registration CertificateFile: Firm Registration Certificate_compressed.pdf | - |
| Partnership DeedFile: Partnership Deed_compressed.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SHREE KRUPASINDU | “Shree Krupasindhu Apt”, R.S. No.129/*/2, CTS NO.1594/1, Godsewadi, Mandoli Road, Belagavi. | Ongoing | Mar 2026 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep SHREE SWAMI KRUPA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: PANARE BUILDERS & DEVELOEPRS
PANARE BUILDERS & DEVELOEPRS has 1 registration on RERA Karnataka, including SHREE SWAMI KRUPA. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if SHREE SWAMI KRUPA is delayed beyond 10 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SHREE SWAMI KRUPA?
The registered promoter entity is PANARE BUILDERS & DEVELOEPRS, a partnership firm as per the filing. Its GSTIN 29AAJFP7127J1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SHREE SWAMI KRUPA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SHREE SWAMI KRUPA?
The professionals named in the filing: Architect: SUMIT P GAWADE; Engineer: SAGAR V HUDDAR; Chartered Accountant: SANDEEP S KAJUKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE SWAMI KRUPA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback