Home / Browse projects / Vadodara, Gujarat / SHIVABHI LUXURIA
SHIVABHI LUXURIA
By GURUPRASAD INFRASTRUCTURE PRIVATE LIMITED
RG-GJ-45890 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA04073/EX1/280520 · Last updated on GujRERA portal: 28 Aug 2022
Source: official GujRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- Separate project account declared
Saved.
SHIVABHI LUXURIA is a Residential/Group Housing project by GURUPRASAD INFRASTRUCTURE PRIVATE LIMITED in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA04073/EX1/280520 on 19 Nov 2018. Possession is promised by 31 Dec 2020. The completion date has moved by 12 months from the original filing. 308 of the 319 units on this registration are recorded sold or booked, and 150 of 150 construction stages are filed complete.
At a glance
Project
- NameSHIVABHI LUXURIA
- TypeResidential/Group Housing
- Location
- Opp. Jiji Mata mandir
- Nr. ABB compound
- Makarpura Main road
- Jambuva Makarpura
- Vadodara
- 390014
- Pincode390014
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA04073/EX1/280520
- ReraGenie IDRG-GJ-45890
Builder
- NameGURUPRASAD INFRASTRUCTURE PRIVATE LIMITED
- Entity typeCOMPANY
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusValid until 31 Dec 2020
- Registered on19 Nov 2018
- Promised completion31 Dec 2020
- Revised completionRevised to 31 Dec 2020 (originally 31 Dec 2019)
- Buildings22 building records
- Documents filed59 files
Current status
Figures as on 28 Aug 2022, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER T | - | - | - | 16 | 0 | 16 |
| TOWER U | - | - | - | 16 | 0 | 16 |
| TOWER V | - | - | - | 12 | 0 | 12 |
| TOWER W | - | - | - | 12 | 0 | 12 |
| TOWER X | - | - | - | 11 | 0 | 11 |
| TOWER Y | - | - | - | 12 | 0 | 12 |
| TOWER Z | - | - | - | 12 | 0 | 12 |
| TOWER E | - | - | - | 16 | 0 | 16 |
| TOWER F | - | - | - | 16 | 0 | 16 |
| TOWER G | - | - | - | 14 | 0 | 14 |
| TOWER H | - | - | - | 14 | 0 | 14 |
| TOWER I | - | - | - | 16 | 0 | 16 |
| TOWER J | - | - | - | 16 | 0 | 16 |
| TOWER K | - | - | - | 16 | 0 | 16 |
| TOWER L | - | - | - | 14 | 0 | 14 |
| TOWER M | - | - | - | 14 | 0 | 14 |
| TOWER N | - | - | - | 14 | 0 | 14 |
| TOWER O | - | - | - | 16 | 0 | 16 |
| TOWER P | - | - | - | 14 | 0 | 14 |
| TOWER Q | - | - | - | 16 | 0 | 16 |
| TOWER R | - | - | - | 16 | 0 | 16 |
| TOWER S | - | - | - | 16 | 0 | 16 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building20
As on 28 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 22 buildings; the table lists the first 20.
150 of 150 construction stages are filed complete across 22 buildings.
TOWER T100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER U100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER V100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER W100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER X100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER Y100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER Z100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER E100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER F100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER G100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | Not applicable |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
TOWER H100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER I100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER J100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | Not applicable |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | Not applicable |
TOWER K100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER L100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER M100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER N100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER O100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER P100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
TOWER Q100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | 100% |
| Slabs of Super Structure | Not applicable |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
Progress on shared amenities19
As on 28 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 100% |
| Water supply | Yes | 100% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 100% |
| Storm water drains | Yes | 100% |
| Landscaping and tree planting | Yes | 80% |
| Street lighting | Yes | 100% |
| Community buildings | Yes | 100% |
| Treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation, rain water harvesting | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Fire fighting | No | Not applicable |
| Drinking water facilities | No | Not applicable |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | Yes | 100% |
| Letter box | Yes | 100% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TOWER E | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER F | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER G | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER H | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER I | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER J | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER K | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER L | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER M | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER N | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER O | NA | Rs 2.01 cr | Rs 2.01 cr |
| TOWER P | NA | Rs 2.01 cr | Rs 2.01 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pramukh Engineers |
| Engineer | Swati Associates |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Documents filed59
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA04073/EX1/280520 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Accountant's certificate (Form 3) | 28 Aug 2022 |
| Architect's certificate (Form 1) | 27 Aug 2022 |
| Engineer's certificate (Form 2) | 27 Aug 2022 |
| Engineer's certificate annexure | 27 Aug 2022 |
| Site photograph, TOWER T | 27 Aug 2022 |
| Site photograph, TOWER U | 27 Aug 2022 |
| Site photograph, TOWER V | 27 Aug 2022 |
| Site photograph, TOWER W | 27 Aug 2022 |
| Site photograph, TOWER X | 27 Aug 2022 |
| Site photograph, TOWER Y | 27 Aug 2022 |
| Site photograph, TOWER Z | 27 Aug 2022 |
| Site photograph, TOWER E | 27 Aug 2022 |
| Site photograph, TOWER F | 27 Aug 2022 |
| Site photograph, TOWER G | 27 Aug 2022 |
| Site photograph, TOWER H | 27 Aug 2022 |
| Site photograph, TOWER I | 27 Aug 2022 |
| Site photograph, TOWER J | 27 Aug 2022 |
| Site photograph, TOWER K | 27 Aug 2022 |
| Site photograph, TOWER L | 27 Aug 2022 |
| Site photograph, TOWER M | 27 Aug 2022 |
| Site photograph, TOWER N | 27 Aug 2022 |
| Site photograph, TOWER O | 27 Aug 2022 |
| Site photograph, TOWER P | 27 Aug 2022 |
| Site photograph, TOWER Q | 27 Aug 2022 |
| Site photograph, TOWER R | 27 Aug 2022 |
| Site photograph, TOWER S | 27 Aug 2022 |
| RERA registration certificate | 19 Nov 2018 |
| Proforma agreement for sale | - |
| Auditor's report (1 of 3) | - |
| Auditor's report (2 of 3) | - |
| Auditor's report (3 of 3) | - |
| Income tax return (1 of 3) | - |
| Income tax return (2 of 3) | - |
| Income tax return (3 of 3) | - |
| Project specific document | - |
| Directors' report (1 of 3) | - |
| Directors' report (2 of 3) | - |
| Directors' report (3 of 3) | - |
| Commencement certificate | - |
| Approved sanctioned plan | - |
| Approved layout plan | - |
| Agreement | - |
| Land location | - |
| Encumbrance certificate | - |
| Area development document | - |
| Proforma allotment letter | - |
| Brochure | - |
| Project related document | - |
| Declaration in Form B | - |
| Project photograph | - |
| Audited balance sheet (1 of 3) | - |
| Audited balance sheet (2 of 3) | - |
| Audited balance sheet (3 of 3) | - |
| Audited profit and loss statement (1 of 3) | - |
| Audited profit and loss statement (2 of 3) | - |
| Audited profit and loss statement (3 of 3) | - |
| Cash flow statement (1 of 3) | - |
| Cash flow statement (2 of 3) | - |
| Cash flow statement (3 of 3) | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Vadodara
Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.
Keep SHIVABHI LUXURIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Jambuva Makarpura2,900+ in Vadodara
Filed coordinates, straight-line distance. 106 registered projects within 2 km.
AATMIYA LANDMARK
AATMIYA REALTY
WINGS (TOWER A)
ONS BUILDTECH LLP
THE RISE PLAZA
THE DWARKESH INFRA
HAVELI RESI CUM PLAZA
VRAJ ASSOCIATES
ROSEDALE COUNTY
CALLA ASSOCIATES
DARSHANAM KINGSVILLE PHASE 1
MSK VENTURES LLP
See every Vadodara project, with the district possession charts
Builder: GURUPRASAD INFRASTRUCTURE PRIVATE LIMITED
GURUPRASAD INFRASTRUCTURE PRIVATE LIMITED has 2 registrations on GujRERA, including SHIVABHI LUXURIA and J P PRISMA. Read the full track record. See more projects on the Vadodara district page.
Frequently asked questions
What are my rights if SHIVABHI LUXURIA is delayed beyond 31 Dec 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of SHIVABHI LUXURIA?
The registered promoter entity is GURUPRASAD INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in SHIVABHI LUXURIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SHIVABHI LUXURIA?
The professionals named in the filing: Architect: Pramukh Engineers; Engineer: Swati Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIVABHI LUXURIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback