Home / Browse projects / Kalaburagi, Karnataka / SHARANARA ASHIRWAD APARTMENT

Registration approved No litigation declared Residential/Group Housing project

SHARANARA ASHIRWAD APARTMENT

By LINGARAJ BASAWARAJ APPA

RG-KA-23165 · RERA PRM/KA/RERA/1263/419/PR/230223/005750 · Last updated on RERA Karnataka portal: 2 Feb 2023

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
Jun 2024Possession promisedmoved 10 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 116 documents Report an error

SHARANARA ASHIRWAD APARTMENT is a Residential/Group Housing project by LINGARAJ BASAWARAJ APPA in Kalaburagi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1263/419/PR/230223/005750 on 23 Feb 2023. Possession is promised by 30 Jun 2024. The completion date has moved by 10 months from the original filing.

At a glance

Project

  • NameSHARANARA ASHIRWAD APARTMENT
  • TypeResidential/Group Housing
  • Location
    • Kalaburagi
    • 585102
  • Pincode585102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1263/419/PR/230223/005750
  • ReraGenie IDRG-KA-23165

Builder

  • NameLINGARAJ BASAWARAJ APPA
  • Entity typeOther ( PROPRIETORSHIP )
  • GSTIN29ABGPA4427L1ZL
  • Authorized SignatoryLINGARAJ BASAWARAJ APPA

Key dates

this monthRegisteredFeb 2023First promiseAug 2023Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Feb 2023
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 31 Aug 2023)
  • Buildings1 building record
  • Documents filed116 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHARANARA ASHIRWAD APARTMENT---808

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 2 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities32

As on 2 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesYes-

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area446 sq m
Named landowners2
LandownerVillageDistrict
SRI LINGARAJ s/o BASAWARAJ APPA--
LINGARAJ BASAWARAJ APPA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.54 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.90 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 54.00 lakh-
ADMINISTRATIVE COSTSRs 8.00 lakh-
On-site expenditure-Consultants FeesRs 2.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHREY MALHAR RAO
EngineerRAMESH DHULAPPA
Chartered AccountantSHRISHAIL VEERANNA MANTGOL

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1263/419/PR/240228/005750Aug 2023 → Jun 2024

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed116

As listed on the registration, under the names the promoter filed them with; the newest 80 of 116 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1263/419/PR/230223/005750 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
FORM B OF RERA AFFADAVIT CUM DECLARTION WITH REVISED DATE IN POINT NO. 3File: AFFADAVIT CUM DECLARTION LATEST.pdf2 Feb 2023
CA CERTFICATEFile: FORM 1 CA_compressed.pdf26 Dec 2022
ENGINEER VALUTION REPORTFile: ENGINEER VALUATION REPORT BY RAMESH.pdf26 Dec 2022
FORM B OF RERA, REVISEDFile: Affadavit Cum Declartion 3_compressed.pdf26 Dec 2022
ENGINEER ESTIMATION AND VALUATION CERTIFICATEFile: Lingraj appa valuation report 12 (1).pdf9 Oct 2022
ENGINEER CONSTRUCTION ESTIMATION CERTIFICATEFile: 22 MELKUNDI SIR PROJECT COST ESTIMATION.pdf9 Oct 2022
CA CERTIFICATE AS PER RERA FORMATFile: FORM 1 CA.pdf9 Oct 2022
FORM B IN RERA FORMAT MENTIONED WITH COMPLETION DATE IN PAGE 2, 11TH POINTFile: AFFADAVIT CUM DECLARTION RECT.pdf9 Oct 2022
LBPAS APPROVED PLAN ALONG WITH NAME AND ADDRESSFile: LBPAS PLAN (2).pdf9 Oct 2022
CA CERTIFICATEFile: FORM 1 CA.pdf14 Sep 2022
ENGINEER VALUATION REPORTFile: Lingraj appadocx.pdf14 Sep 2022
FORM B RECTIFIED AS PER NEW QUERYFile: AFFADAVIT CUM DECLARTION RECT.pdf14 Sep 2022
DETAILED LEGAL SEARCH REPORTEDFile: LSR.pdf14 Sep 2022
APPROVED DRAWING PDF FILE FOR BETTER VIEWING AND CLEAR VISIBLITY OF VALUESFile: 17 PERMISSION PLAN LAYOUT BY SB.pdf14 Sep 2022
FORM1 CAFile: FORM 1 CA.pdf20 Aug 2022
AUDIT REPORT FY 2018-19File: LBA AR 19-20.pdf20 Aug 2022
AUDIT REPORT FY 2019-20File: LBA AR 20-21.pdf20 Aug 2022
AUDIT REPORT FY 2020-21File: LBA AR 21-22.pdf20 Aug 2022
KALABURAGI CDP MAPFile: CDP MAP .pdf20 Aug 2022
BHRAMPUR VILLAGE MAPFile: VILLAGE MAP RERA.pdf20 Aug 2022
LSRFile: LSR BY SHIVEELA.pdf20 Aug 2022
FORM B OF RERAFile: SECTION 3 (1) RERA.pdf20 Aug 2022
NON LITIGATATION AFFADAVITFile: NON LITIGATION AFFADAVIT.pdf20 Aug 2022
COMMENCEMENT CERTIFICATE ACKNOWLDEGMENTFile: CMC COMMENCEMENT CERTF ACK.pdf20 Aug 2022
GODUTAI NAGAR LAYOUT MAP SYNO 102 & 103File: 102 AND 103 MAP GODUTAI NAGAR.pdf20 Aug 2022
SURVEY NO 102 NA ORDER COPYFile: SY 102 ORDER COPY.pdf20 Aug 2022
SURVEY NO 102 OF BHRAMPUR LAYOUT MAPFile: SY NO 102 LAYOUT MAP.pdf20 Aug 2022
SURVEY NO 102 RORFile: SY 102 ROR.pdf20 Aug 2022
SURVEY NO 103 LAYOUT MAP WITH DEMARCATION OF PLOT NO 7 & 8 OF PROPOSED SITEFile: Syno103 Layout And plot demarcation .pdf20 Aug 2022
PLOT NO 7 & 8, AMELGAMATION OF PLOTSFile: 12 Amalgamation.pdf20 Aug 2022
PROJECT PLAN WITH ADDRESSFile: PLAN .pdf20 Aug 2022
CDP MAP OF VILLAGE AND DEMARCATIONFile: CDP MAP KLBG-merged_compressed.pdf30 Jul 2022
FORM BFile: AFFADAVIT AND DECLARATION.pdf30 Jul 2022
RTC RECENTFile: BHOOMI SY 103.pdf30 Jul 2022
MUTATION REPORT MRFile: 6 KHATA 13-14-pages-1.pdf30 Jul 2022
KHATA OF 2022-23File: 6 KHATA 2022.pdf30 Jul 2022
TITLE DEED OF DR MALLINATH KOLOLGIFile: 1st deed.pdf30 Jul 2022
LAYOUT PLAN OF 103File: 4 LAYOUT PLAN MAP.pdf30 Jul 2022
LAYOUT PLAN OF 102 AND 103 COMBINED BELONING TO ONE OWNER ( BASAWARAJ DODDAPPA APPA)File: LAYOUT OF 102 & 103.pdf30 Jul 2022
GUIDANCE VALUE OBTAINED BY SUB REGISTRARFile: SUB REGISTRAR VALUE.pdf30 Jul 2022
NON LITIGATATION AFFADAVITFile: ANNEX 45 NON LIT AFFADAVIT.pdf30 Jul 2022
SECTION 3 (1) AFFADAVITFile: SECTION 3(1).pdf30 Jul 2022
LBPAS APPROVED ACKNOWLEGEMENT AND COMMENCEMENT CERTIFICIATEFile: 18 APPROVED PLAN ACK.pdf30 Jul 2022
RTC FROM 1963-64 TO 2021-22File: RTC.pdf30 Jul 2022
SOAK PIT, SEPTIC TANK AND SEWER LINE PROJECTIONFile: PIT DESGIN.pdf30 Jul 2022
REVISED AGREEMENT FOR SALEFile: AOS FINAL.pdf30 Jul 2022
APPROVED PLAN SIGNED COPYFile: PLAN SIGN COPY.pdf30 Jul 2022
ALLOTMENT LETTERFile: allotement letter.pdf30 Jul 2022
RTC, survey 103-
Mutation, survey 103-
Encumbrance Certificate, survey 103-
Conversion/Alienation Order, survey 103-
Sale/Title/Gift Deed, survey 103-
Khatha, survey 103-
Registration CertificateFile: AA290317096226V_RC08072018.pdf-
Certificate issued by CA Form 1File: FORM 1 CA_compressed.pdf-
Certificate issued by Architect Form 2-
Certificate issued by Engineer Form 3File: ENGINEER VALUATION REPORT BY RAMESH.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NON LITIGATION AFFADAVIT.pdf-
Certificate from Chartered AccountFile: FORM 1 CA_compressed.pdf-
Balance Sheet 2020 - 2021File: 21-22 BS.pdf-
Balance Sheet 2019 - 2020File: 20-21 BS.pdf-
Audited Profit and Loss Statement 2020 - 2021File: 21-22 PL.pdf-
Audited Profit and Loss Statement 2019 - 2020File: 20-21 PL.pdf-
Cash Flow Statement 2020 - 2021File: ic statement 2122.pdf-
Cash Flow Statement 2019 - 2020File: IC STATEMENT 20-21.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: 21-22 ITR.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: 20-21 ITR.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: 19-20 itr-compressed.pdf-
18 APPROVED PLAN ACK-
19 GESCOM NOC-
21 WATER BOARD NOC_compressed-
4 LAYOUT PLAN MAP-
17 PERMISSION PLAN LAYOUT BY SB-
4 LAYOUT PLAN MAP-
sectional plan-
specs-

How this compares with Kalaburagi

32%of Kalaburagi projects moved their completion datethis one moved by 10 months
0%of Kalaburagi registrations are shown as withdrawn or revokedthis one is not

Computed across the 210+ Kalaburagi projects on ReraGenie, from their own filings.

Keep SHARANARA ASHIRWAD APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kalaburagi210+ in Kalaburagi

2 kmSHARANARA ASHIRWAD APARTOther 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: LINGARAJ BASAWARAJ APPA

LINGARAJ BASAWARAJ APPA has 1 registration on RERA Karnataka, including SHARANARA ASHIRWAD APARTMENT. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Kalaburagi district page.

Frequently asked questions

What are my rights if SHARANARA ASHIRWAD APARTMENT is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHARANARA ASHIRWAD APARTMENT?

The registered promoter entity is LINGARAJ BASAWARAJ APPA, an other ( proprietorship ) as per the filing. Its GSTIN 29ABGPA4427L1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHARANARA ASHIRWAD APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHARANARA ASHIRWAD APARTMENT?

The professionals named in the filing: Architect: SHREY MALHAR RAO; Engineer: RAMESH DHULAPPA; Chartered Accountant: SHRISHAIL VEERANNA MANTGOL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHARANARA ASHIRWAD APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHARANARA ASHIRWAD APARTMENT. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHARANARA ASHIRWAD APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.