Home / Browse projects / Bengaluru Urban, Karnataka / SAFFRON CREST
SAFFRON CREST
By SREEHAN INFRACON (OPC) PRIVATE LIMITED
RG-KA-41182 · RERA PRM/KA/RERA/1251/308/PR/300426/008609 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SAFFRON CREST is a Residential/Group Housing project by SREEHAN INFRACON (OPC) PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/300426/008609 on 30 Apr 2026. Possession is promised by 22 Jan 2031. 0 of the 42 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete.
At a glance
Project
- NameSAFFRON CREST
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 562125
- Pincode562125
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/300426/008609
- ReraGenie IDRG-KA-41182
Builder
- NameSREEHAN INFRACON (OPC) PRIVATE LIMITED
- Entity typeCompany
- CINU45203KA2022OPC159091
- GSTIN29ABICS0882Q1ZF
- Authorized SignatorySiva Kumar Dasari
- DirectorsSiva Kumar Dasari, Siva Kumar Dasari
- Project HeadSiva Kumar Dasari
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on30 Apr 2026
- Promised completion22 Jan 2031
- Revised completionNone
- Buildings2 building records
- Documents filed132 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 1 | - | - | - | 14 | 0 | 14 |
| Building 2 | - | - | - | 28 | 0 | 28 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 17 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 90%.
Building: 12% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 90% |
| Foundation footing work | 60% |
| Upto Plinth Level | 60% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities41
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Staircases and Lift lobbies, corridor, lobbies, corridor | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 0% |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Manjunatha S N | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 59.41 cr | Rs 69.00 lakh |
| On-site expenditure-Consultants Fees | Rs 12.00 lakh | Rs 1.50 lakh |
| Payment of taxes | Rs 10.00 lakh | Rs 60,000 |
| Administrative Cost | Rs 8.00 lakh | Rs 1.40 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mohamed Sidique Nawaz |
| Engineer | Ramesh B |
| Chartered Accountant | P Venkobi |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed132
As listed on the registration, under the names the promoter filed them with; the newest 80 of 132 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/300426/008609 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 6 Engineer Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 5 Architect Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Ca certificate.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate June 2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certifiacte June 2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Bank AffidavitFile: 1 Bank affidavit (2).pdf | 15 Apr 2026 |
| CA CertficateFile: 2 CA Certficate.pdf | 15 Apr 2026 |
| RTC For Sy No 486File: 4 RTC For Sy No 486.pdf | 15 Apr 2026 |
| MR 22 96-97File: 5 MR 22 96-97.pdf | 15 Apr 2026 |
| Partition deedFile: 6 Partition deed.pdf | 15 Apr 2026 |
| Release deed datedFile: 6 Release deed dated.pdf | 15 Apr 2026 |
| Conversion OrderFile: 7 Conversion Order.pdf | 15 Apr 2026 |
| ECFile: 8 EC.pdf | 15 Apr 2026 |
| Building License Application and AffidavitFile: 9 Building License Application and Affidavit.pdf | 15 Apr 2026 |
| ADLR Survey Sketch AffidavitFile: 10 ADLR Survey Sketch Affidavit.pdf | 15 Apr 2026 |
| Section & ElevationFile: 11 Section & Elevation.pdf | 15 Apr 2026 |
| Saffron crest,CC declarationFile: 12 Saffron crest,CC declaration.pdf | 15 Apr 2026 |
| CDP Plan - DemarcatedFile: 13 CDP Plan - Demarcated.pdf | 15 Apr 2026 |
| Village mapFile: 14 Village map.pdf | 15 Apr 2026 |
| CLU Ktcp AffidavitFile: 15 CLU Ktcp Affidavit.pdf | 15 Apr 2026 |
| AmenitiesFile: 18 Amenities.pdf | 15 Apr 2026 |
| Common AreaFile: 19 Common Area.pdf | 15 Apr 2026 |
| Engineer LicenseFile: 20 Engineer License.pdf | 15 Apr 2026 |
| Saffron crest source of fundFile: 3 Saffron crest source of fund.pdf | 15 Apr 2026 |
| Saffron Crest Structural stability certificateFile: Saffron Crest Structural stability certificate.pdf | 15 Apr 2026 |
| SIPL AOAFile: 1 SIPL AOA.pdf | 4 Mar 2026 |
| SIPL MOAFile: 1 SIPL MOA.pdf | 4 Mar 2026 |
| SIPL Collection ACCFile: 2 SIPL Collection ACC.pdf | 4 Mar 2026 |
| SIPL Designated ACCFile: 2 SIPL Designated ACC.pdf | 4 Mar 2026 |
| SIPL Current ACCFile: 2 SIPL Current ACC.pdf | 4 Mar 2026 |
| SIPL Director Report 2023-2024File: SIPL Director Report 2022-2023.pdf | 4 Mar 2026 |
| SIPL Auditor Report 2023-2024File: SIPL Auditor Report 2022-2023.pdf | 4 Mar 2026 |
| SIPL Balance Sheet with notes 2022-23File: SIPL Balance Sheet with notes 2022-23.pdf | 4 Mar 2026 |
| SIPl Profit & Loss with notes 2022-2023File: SIPl Profit & Loss with notes 2022-2023.pdf | 4 Mar 2026 |
| SIPL ITR FY 2022-2023File: SIPL ITR FY 2022-2023.pdf | 4 Mar 2026 |
| SIPL Balance Sheet with notes 2023-2024File: SIPL Balance Sheet with notes 2023-2024.pdf | 4 Mar 2026 |
| SIPL Director Report 2023-2024 1File: SIPL Directior Report 2024-2025.pdf | 4 Mar 2026 |
| SIPL Profit & Loss with notes 2023-2024File: SIPL Profit & Loss with notes 2023-2024.pdf | 4 Mar 2026 |
| SIPL Indepemndent Auditor Report 2023-2024File: SIPL Auditor Report 2024-2025.pdf | 4 Mar 2026 |
| SIPL ITR FY 2023-2024File: SIPL ITR FY 2023-2024.pdf | 4 Mar 2026 |
| SIPL Balnce sheet With Notes 2024-2025File: SIPL Balnce sheet With Notes 2024-2025.pdf | 4 Mar 2026 |
| SIPL Directior Report 2024-2025File: SIPL Directior Report 2024-2025.pdf | 4 Mar 2026 |
| SIPL Independent Auditor Report 2024-2025File: SIPL Auditor Report 2024-2025.pdf | 4 Mar 2026 |
| SIPL ITR FY 2024-2025File: SIPL ITR FY 2024-2025 1.pdf | 4 Mar 2026 |
| SIPL Profit & Loss With Notes 2024-2025File: SIPL Profit & Loss With Notes 2024-2025.pdf | 4 Mar 2026 |
| Form 3 Engineer CertificateFile: 7 Form 3 Engineer Certificate.pdf | 4 Mar 2026 |
| Saffron Crest No litigationFile: 8 Saffron Crest No litigation.pdf | 4 Mar 2026 |
| SIPL JDAFile: 13 SIPL JDA.pdf | 4 Mar 2026 |
| SIPL GPAFile: 13 SIPL GPA.pdf | 4 Mar 2026 |
| SIPL E KhataFile: 16 SIPL E Khata.pdf | 4 Mar 2026 |
| Saffron Crest Form BFile: 17 Saffron Crest Form B.pdf | 4 Mar 2026 |
| Saffron Crest Joint AffidavitFile: 18 Saffron Crest Joint Affidavit.pdf | 4 Mar 2026 |
| Saffron Crest Legal ReportFile: 19 Saffron Crest Legal Report.pdf | 4 Mar 2026 |
| Saffron Crest No litigationFile: 20 Saffron Crest No litigation.pdf | 4 Mar 2026 |
| Approval LetterFile: 21 Approval Letter.pdf | 4 Mar 2026 |
| Deamractaed MapFile: 23 Deamractaed Map.pdf | 4 Mar 2026 |
| Saffron Crest Approved Building PlanFile: 24 Saffron Crest Approved Building Plan.pdf | 4 Mar 2026 |
| Saffron Crest Plan ElevationFile: 24 Saffron Crest Plan Elevation.pdf | 4 Mar 2026 |
| Saffron Crest Plan SectionFile: 24 Saffron Crest Plan Section.pdf | 4 Mar 2026 |
| Approval letter & CC declarationFile: 25 Approval letter & CC declaration.pdf | 4 Mar 2026 |
| Reason For DealyFile: 31 Reason For Dealy.pdf | 4 Mar 2026 |
| Saffron Crest Aminities DetailsFile: 33 Saffron Crest Aminities Details.pdf | 4 Mar 2026 |
| Saffron Crest Common area DetailsFile: 34 Saffron Crest Common area Details.pdf | 4 Mar 2026 |
| Engineer license CopyFile: 35 Engineer license Copy.pdf | 4 Mar 2026 |
| Form 3 Engineer CertificateFile: 37 Form 3 Engineer Certificate.pdf | 4 Mar 2026 |
| Structural stability certificate of Saffron CrestFile: 38 Structural stability certificate of Saffron Crest.pdf | 4 Mar 2026 |
| Agreement OF SaleFile: 39 Agreement OF Sale.pdf | 4 Mar 2026 |
| Allotment LetterFile: 40 Allotment Letter.pdf | 4 Mar 2026 |
| SIPL Engineer LicenseFile: 41 SIPL Engineer License.pdf | 4 Mar 2026 |
| saffron crest Land cost calculationFile: 42 saffron crest Land cost calculation.pdf | 4 Mar 2026 |
| SAFFRON CREST water available declaration (1)File: 43 SAFFRON CREST water available declaration (1).pdf | 4 Mar 2026 |
| Booking FormFile: Booking Form.pdf | 4 Mar 2026 |
| Inventory Saffron CrestFile: SAFFRON crest INVENTORY.pdf | 4 Mar 2026 |
| SAFFRON CREST QUERY 1 REPLYFile: SAFFRON CREST QUERY 1 REPLY.pdf | 4 Mar 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SAFFRON CREST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 49 registered projects within 2 km.
Nambiar District 25 Phase 3
Nambiar EnsembleResidential Projects LLP
Meridian Park Phase II @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase I @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Meridian Park Phase III @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
Nambiar District 25 Phase 2
Nambiar EnsembleResidential Projects LLP
SEVEN SARJAPUR
FORTUNE PRIMERO LLP
See every Bengaluru Urban project, with the district possession charts
Builder: SREEHAN INFRACON (OPC) PRIVATE LIMITED
SREEHAN INFRACON (OPC) PRIVATE LIMITED has 2 registrations on RERA Karnataka, including SISIRA PARK and SAFFRON CREST. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SAFFRON CREST is delayed beyond 22 Jan 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SAFFRON CREST?
The registered promoter entity is SREEHAN INFRACON (OPC) PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2022OPC159091 and GSTIN 29ABICS0882Q1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SAFFRON CREST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SAFFRON CREST?
The professionals named in the filing: Architect: Mohamed Sidique Nawaz; Engineer: Ramesh B; Chartered Accountant: P Venkobi. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAFFRON CREST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.