Home / Browse projects / Bengaluru Urban, Karnataka / Renaissance Srichakra
Renaissance Srichakra
By Renaissance Holdings and Developers Pvt Ltd
RG-KA-30207 · RERA PRM/KA/RERA/1251/309/PR/110325/007570 · Last updated on RERA Karnataka portal: 15 Jul 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Renaissance Srichakra is a Residential/Group Housing project by Renaissance Holdings and Developers Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/110325/007570 on 11 Mar 2025. Possession is promised by 11 Aug 2027. 5 of the 8 units on this registration are recorded sold or booked, and 16 of 16 construction stages are filed complete.
At a glance
Project
- NameRenaissance Srichakra
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560055
- Pincode560055
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/110325/007570
- ReraGenie IDRG-KA-30207
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on11 Mar 2025
- Promised completion11 Aug 2027
- Revised completionNone
- Buildings1 building record
- Documents filed132 files
Current status
Figures as on 15 Jul 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Srichakra | - | - | - | 8 | 0 | 8 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 16 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 100% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 100% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | No | Not applicable |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 100% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Srichakra Engineering Equipments | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 9.21 cr | Rs 3.95 cr |
| On-site expenditure-Salaries of workers | Rs 27.00 lakh | Rs 22.78 lakh |
| On-site expenditure-Consultants Fees | Rs 10.00 lakh | - |
| On-site expenditure-Site Overhead | Rs 2.04 lakh | Rs 1.91 lakh |
Certifying professionals and partners4
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kaavya R |
| Engineer | Anand G |
| Engineer | Neminath Parigond |
| Chartered Accountant | Srikakolapu Varada Rajesh |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed132
As listed on the registration, under the names the promoter filed them with; the newest 80 of 132 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/110325/007570 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA Cert-Srichakra-Q1FY27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: AC.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: EC.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Signed FORM 4 Cert-Srichakra-Q4FY26_260414_134801.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: AC.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: EC.pdf | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 Cert-Srichakra-Q3FY26_260114_184900.pdf | 16 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: AC.pdf | 16 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: EC.pdf | 16 Jan 2026 |
| RENAISANCE NATURE WALK PHASE iii LAST QR UPLOADED IS DTD 14/8/20 WHICH SHOWS 92 % COMPLETION AND NOFile: Letter to RERA Acknowledgment Dt 07 11 2024.pdf | 11 Nov 2024 |
| uploaded EC for the period for the same propertyFile: ECC-from 01 04 2008 To 21 09 2024 Srichakra.pdf | 23 Sep 2024 |
| survey sketch Certifying the BoundaryFile: Srichakra Survey plan.pdf | 23 Sep 2024 |
| Approved Original Single Plot layout planFile: Approved single plot layout plan.pdf | 23 Sep 2024 |
| Approved Original Single Plot layout plan work orderFile: Approved single plot layout Work order.pdf | 23 Sep 2024 |
| Upload commencement certificateFile: upload commencement certificate.pdf | 23 Sep 2024 |
| Approved Master plan Extract ear mark the proposed land and certified by the concern AuthorityFile: Site marked in CDP Map (Malleshwaram Map-A).pdf | 23 Sep 2024 |
| KSPCB NOCFile: KSPCB NOC.pdf | 23 Sep 2024 |
| Change of land use details if anyFile: Change of Land use details.pdf | 23 Sep 2024 |
| Area details in approved plan and details uploaded is not MatchingFile: Area Details.pdf | 23 Sep 2024 |
| Since the built up area is more than 2000 sqm i.e. 2088.4 sqm as per the BBMP License BWSSB NOC andFile: BWSSB and BESCOM NOC.pdf | 23 Sep 2024 |
| The total estimated cost and project completion date mentioned in the bank affidavit are incorrect,File: Annexure 113 Affidavit for Bank account 24 08 2024.pdf | 28 Aug 2024 |
| The Total estimated cost of the project is not matched with the CA certificate, please upload the CAFile: Annexure 57 Construction cost-CA 23 08 2024.pdf | 28 Aug 2024 |
| profit and loss account 2020-21File: Annexure 61 P&L Ac-fy21.pdf | 28 Aug 2024 |
| profit and loss account 2021-22File: Annexure 61 P&L Ac-fy22.pdf | 28 Aug 2024 |
| profit and loss account 2022-23File: Annexure 61 P&L Ac-fy23.pdf | 28 Aug 2024 |
| balance sheet 2020-21File: Annexure 60 Balancesheet-fy21.pdf | 28 Aug 2024 |
| balance sheet 2021-22File: Annexure 60 Balancesheet-fy22.pdf | 28 Aug 2024 |
| balance sheet 2022-23File: Annexure 60 Balancesheet-fy23.pdf | 28 Aug 2024 |
| ITR 2020-21File: Annexure 65 ITR Ack-fy21.pdf | 28 Aug 2024 |
| ITR 2021-22File: Annexure 65 ITR Ack-fy22.pdf | 28 Aug 2024 |
| ITR 2022-23File: Annexure 65 ITR Ack-fy23.pdf | 28 Aug 2024 |
| sources of fundsFile: Source of funds.pdf | 28 Aug 2024 |
| director's KYC Mr RamanjFile: Director KYC- Mr Ramanj.pdf | 28 Aug 2024 |
| director's KYC Mrs RamanjFile: Director KYC- Mrs Ramanj.pdf | 28 Aug 2024 |
| chartered accountant's KYCFile: CA KYC & COP.pdf | 28 Aug 2024 |
| ECFile: Annexure 40 EC from 01 04 2004 To 20 08 2024.pdf | 28 Aug 2024 |
| RTCFile: Annexure 35 RTC.pdf | 28 Aug 2024 |
| kathaFile: Annexure 39 Khata endorsement 20 08 24.pdf | 28 Aug 2024 |
| notarized affidavit in form-BFile: Annexure 90 Declaration Form B 24 08 24.pdf | 28 Aug 2024 |
| notarized JD cum AffidavitFile: Annexure 92 JD Affidavit cum Declaration 24 08 24.pdf | 28 Aug 2024 |
| Building License for construction of building from Local AuthorityFile: Annexure 67 BBMP plan approval letter.pdf | 28 Aug 2024 |
| Phase wise Development phase demarcation drawings certified by the project Architect.File: Annexure 71 Approved Building plan.pdf | 28 Aug 2024 |
| All sanctioned drawings floor plan, sectional drawings and elevationsFile: Annexure 70 Approved Building plan.pdf | 28 Aug 2024 |
| Architects certificate with valid COA number.File: Annexure 48 Architect Registration Certificate (COA).pdf | 28 Aug 2024 |
| self attested copy of the Engineer license certificateFile: Annexure 50 engineer registration certificate.pdf | 28 Aug 2024 |
| Amenities and Common area detailsFile: Amenities & common area.pdf | 28 Aug 2024 |
| Engineer certificateFile: Annexure 58 Certificate issued by Engineer under Construction 23 08 2024.pdf | 28 Aug 2024 |
| structural safety adopted for the proposed buildingFile: Structural safety.pdf | 28 Aug 2024 |
| project specification certified by the EngineerFile: Annexure 75 Project Specifications.pdf | 28 Aug 2024 |
| The Built up area is more than 2000 sqm, please upload the STP design drawing as per the GuidelinesFile: STP corregendum Notification dt 12 03 2024 by MOFE.pdf | 28 Aug 2024 |
| BESCOM and BWSSB NOCFile: BESCOM & BWSSB NOC.pdf | 28 Aug 2024 |
| Land cost calculation sheetFile: Land cost as per guidance value 22 08 24.pdf | 28 Aug 2024 |
| source of water supply to the projectFile: Source of water.pdf | 28 Aug 2024 |
| estimated cost of construction certified by the EngineerFile: Estimated cost.pdf | 28 Aug 2024 |
| Registration CertificateFile: Annexure 1 incorporation certificate.pdf | - |
| Memorandum of AssociationFile: Annexure 1 MOA & AOA.pdf | - |
| Article of AssociationFile: Annexure 1 MOA & AOA.pdf | - |
| Organization StructureFile: Annexure 11 organisation structure.pdf | - |
| Certificate issued by CA Form 1File: Annexure 57 Construction cost-CA 23 08 2024.pdf | - |
| Certificate issued by Architect Form 2File: Annexure 59 Certificate issued by Architect under Construction 23 08 2024.pdf | - |
| Certificate issued by Engineer Form 3File: Annexure 58 Certificate issued by Engineer under Construction 23 08 2024.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Annexure 45 Non-Litigation Affidavit-Srichakra.pdf | - |
| Certificate from Chartered AccountFile: Annexure 56 Approval cost-CA.pdf | - |
| Balance Sheet 2022 - 2023File: Annexure 60 Balancesheet-fy22.pdf | - |
| Balance Sheet 2021 - 2022File: Annexure 60 Balancesheet-fy21.pdf | - |
| Balance Sheet 2020 - 2021File: Annexure 60 Balancesheet-fy20.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Annexure 61 P&L-fy22.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Annexure 61 P&L Ac-fy21.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Annexure 61 P&L Ac-fy20.pdf | - |
| Director's Report 2022 - 2023File: Annexure 62 directors report-fy22.pdf | - |
| Director's Report 2021 - 2022File: Annexure 62 Directors report-fy21.pdf | - |
| Director's Report 2020 - 2021File: Annexure 62 Directors report-fy20.pdf | - |
| Cash Flow Statement 2022 - 2023File: Annexure 63 CFS-fy22.pdf | - |
| Cash Flow Statement 2021 - 2022File: Annexure 63 CFS-fy21.pdf | - |
| Auditor's Report 2022 - 2023File: Annexure 64 Audit Report-fy22.pdf | - |
| Auditor's Report 2021 - 2022File: Annexure 64 Audit Report-fy21.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Renaissance Marigold Meadows | Sy No. 59 & 60, Maralakunte village, Jala Hobli, Yelahanka taluka, | Ongoing | Sep 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Renaissance Srichakra on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
SUMADHURA EDITION PHASE-II
SUMADHURA INFRACON PRIVATE LIMITED
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: Renaissance Holdings and Developers Pvt Ltd
Renaissance Holdings and Developers Pvt Ltd has 2 registrations on RERA Karnataka, including Renaissance Srichakra and Renaissance Nature Walk Phase III (Building 04,Building 09 and Building 10). Its filings declare 6 earlier projects, 5 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Renaissance Srichakra is delayed beyond 11 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Renaissance Srichakra?
The registered promoter entity is Renaissance Holdings and Developers Pvt Ltd, a company as per the filing. Its CIN U07010KA1994PTC016339 and GSTIN 29AAACR6804J1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Renaissance Srichakra?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Renaissance Srichakra?
The professionals named in the filing: Architect: Kaavya R; Engineer: Anand G; Engineer: Neminath Parigond; Chartered Accountant: Srikakolapu Varada Rajesh. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Renaissance Srichakra?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.