Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jan 2030Possession promisedno revision filed
0 of 17Construction stages donefurthest along: Earth work and other leveling..., 60%
49 of 62Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 104 documents Report an error

RAINBOW MAYFAIR is a Residential/Group Housing project by MR INFRAA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/190325/007593 on 19 Mar 2025. Possession is promised by 31 Jan 2030. 13 of the 62 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete.

At a glance

Project

  • NameRAINBOW MAYFAIR
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 560083
  • Pincode560083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/190325/007593
  • ReraGenie IDRG-KA-70656

Builder

  • NameMR INFRAA
  • Entity typePartnership Firm
  • GSTIN29ABOFM5930A1Z7
  • Authorized SignatorySUPREETTH VIMALA SURESH
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2025PromisedJan 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Mar 2025
  • Promised completion31 Jan 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Current status

21%13 of 62 units booked
4.3%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAINBOW MAYFAIR---62062

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 17 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 60%.

Building: 20% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work60%
Foundation footing work60%
Upto Plinth Level60%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)60%
Retaining wall (All types)30%
RCC or MS Framed structure50%
Masonry Construction20%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes0%
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes3%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes10%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes20%
LiftsYes10%
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,075 sq m
Named landowners2
LandownerVillageDistrict
MR INFRAA--
MR INFRAA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 160.17 cr
Cost incurredRs 6.95 cr
Spent of the estimate4.34%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 95.51 crRs 4.21 cr
On-site expenditure-Site OverheadRs 41.08 crRs 96.97 lakh
Payment of taxesRs 13.00 crRs 66,383
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 8.34 crRs 79.45 lakh
On-site expenditure-Consultants FeesRs 2.24 crRs 8.68 lakh
On-site expenditure-Salaries of workers-Rs 85.89 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)-Rs 2.31 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATHISH KUMAR DESAI
EngineerS LAKSHMIKANTHA
Chartered AccountantSURESH BABU NANJA RAMAN

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed104

As listed on the registration, under the names the promoter filed them with; the newest 80 of 104 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/190325/007593 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA MAYFAIR CA CERT Sep 26.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: RERA MAYFAIR ARCH CERT SEP 26.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: RERA MAYFAIR ENGR CERT SEP 26.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA MAYFAIR CA CERT Jun 26.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: RERA MAYFAIR ARCH CERT JUNE 26.PDF15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: RERA MAYFAIR ENGR CERT JUNE 26.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: RERA MAYFAIR CA CERT Mar 26.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: RERA MAYFAIR ARCH CERT MAR 26.PDF15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: RERA MAYFAIR ENGR CERT Mar 26.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: RERA MAYFAIR CA CERT DEC 25.pdf13 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: RERA MAYFAIR ARCH CERT DEC 25.PDF13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: RERA MAYFAR ENGR CERT DEC 25.pdf13 Jan 2026
Q3 2025-26 Water supply and sewage board13 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)13 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)13 Jan 2026
Q3 2025-26 KPTCL- BESCOM13 Jan 2026
AMENITIES DETAILSFile: amenities details.pdf28 Feb 2025
AREA DETAILSFile: details.pdf28 Feb 2025
SELF ATTESTED ENGINEER LICENSEFile: Engineer self attested.pdf28 Feb 2025
PROJECT SPECIFICATIONFile: Specification.pdf28 Feb 2025
STP DRAWINGFile: STP drawing.pdf28 Feb 2025
WATER NOCFile: Water NOC.jpeg28 Feb 2025
RTC, survey 41/4-
Mutation, survey 41/4-
Encumbrance Certificate, survey 41/4-
Conversion/Alienation Order, survey 41/4-
Sale/Title/Gift Deed, survey 41/4-
Khatha, survey 41/4-
RTC, survey 43/1-
Mutation, survey 43/1-
Encumbrance Certificate, survey 43/1-
Conversion/Alienation Order, survey 43/1-
Sale/Title/Gift Deed, survey 43/1-
Khatha, survey 43/1-
Registration CertificateFile: Firm registration certificate.pdf-
GST CertificateFile: Firm registration certificate.pdf-
Partnership DeedFile: MR INFRAA Reconstitution of Partnership 11zon.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1.pdf-
Certificate issued by Architect Form 2File: Form 2.PDF-
Certificate issued by Engineer Form 3File: Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non litigation Affidavit.pdf-
Balance Sheet 2023 - 2024File: MR Infraa AY 24 25.pdf-
Balance Sheet 2022 - 2023File: MR Infraa AY 23 24.pdf-
Balance Sheet 2021 - 2022File: MR Infraa AY 22 23.pdf-
Audited Profit and Loss Statement 2023 - 2024File: MR Infraa AY 24 25.pdf-
Audited Profit and Loss Statement 2022 - 2023File: MR Infraa AY 23 24.pdf-
Audited Profit and Loss Statement 2021 - 2022File: MR Infraa AY 22 23.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: MR Infraa AY 24 25.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: MR Infraa AY 23 24.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: MR Infraa AY 22 23.pdf-
Plan approval-
MAYFAIR SANC PLAN 01 compressed-
MAYFAIR RERA Brochure11zon-
Agreement of Sale Proforma-
MODEL FORM OF ALLOTMENT LETTER-
FORM B-
AFFIDAVIT sec 3-
AFFDAVIT CUM DECLARATION-
Legal opinion 11zon-
MAYFAIR BESCOM NOC-
MAYFAIR WATER NOC ACK-

How this compares with Bengaluru Urban

21%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep RAINBOW MAYFAIR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmRAINBOW MAYFAIROther 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: MR INFRAA

MR INFRAA has 2 registrations on RERA Karnataka, including RAINBOW MAYFAIR and RAINBOW MISTY GREENS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if RAINBOW MAYFAIR is delayed beyond 31 Jan 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of RAINBOW MAYFAIR?

The registered promoter entity is MR INFRAA, a partnership firm as per the filing. Its GSTIN 29ABOFM5930A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in RAINBOW MAYFAIR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at RAINBOW MAYFAIR?

The professionals named in the filing: Architect: SATHISH KUMAR DESAI; Engineer: S LAKSHMIKANTHA; Chartered Accountant: SURESH BABU NANJA RAMAN. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAINBOW MAYFAIR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAINBOW MAYFAIR. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAINBOW MAYFAIR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.