Home / Browse projects / Bengaluru Urban, Karnataka / PURSUIT OF A RADICAL RHAPSODY- TOWER 8
PURSUIT OF A RADICAL RHAPSODY- TOWER 8
By Total Environment Habitat Pvt. Ltd.
RG-KA-41451 · RERA PRM/KA/RERA/1251/446/PR/220922/005261 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
PURSUIT OF A RADICAL RHAPSODY- TOWER 8 is a Residential/Group Housing project by Total Environment Habitat Pvt. Ltd. in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/220922/005261 on 22 Sep 2022. Possession is promised by 30 Sep 2029. 312 of the 362 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.
At a glance
Project
- NamePURSUIT OF A RADICAL RHAPSODY- TOWER 8
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560048
- Pincode560048
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/220922/005261
- ReraGenie IDRG-KA-41451
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Sep 2022
- Promised completion30 Sep 2029
- Revised completionNone
- Buildings1 building record
- Documents filed145 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 08 | - | - | - | 362 | 0 | 362 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 18 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 95%.
Building: 26% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 95% |
| Retaining wall (All types) | 70% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | No | Not applicable |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Total Environment Habitat Pvt. Ltd. | - | - |
| Total Environment Habitat Pvt. Ltd. | - | - |
| Total Environment Habitat Pvt. Ltd. | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 839.70 cr | Rs 132.77 cr |
| On-site expenditure-Site Overhead | - | Rs 64.53 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 320.61 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Varun Biltoria |
| Engineer | Vishnu Kumar |
| Chartered Accountant | Ankush Jain |
Litigation declaredYes
The promoter declares litigation on this registration. The case records are in the filed documents.
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed145
As listed on the registration, under the names the promoter filed them with; the newest 80 of 145 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/220922/005261 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 PURSUIT OF A RADICAL RHAPSODY TOWER-08 Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM-5 PURSUIT OF A RADICAL RHAPSODY TOWER-08 Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM-6 PURSUIT OF A RADICAL RHAPSODY TOWER-08 Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 PoaRR T8 Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 PoaRR T8 Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 PoaRR T8 Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Q4 25-26 POARR- TOWER 8.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q4 25-26 POARR- TOWER 8.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Q4 25-26 POARR- TOWER 8.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: POARR Tower 8_CA Certificates Q3-25-26.pdf | 28 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Pursuit T08 2025-26 Q3 RERA Arch cert.pdf | 28 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Pursuit of a Radical Rhapsody Tower - 8 31-12-2025.pdf | 28 Jan 2026 |
| Proforma Agreement of Sale UpdatedFile: Proforma Agreement of Sale for T8 V1.pdf | 20 Sep 2022 |
| RERA Demarcation on Master PlanFile: 1 RERA Demarcation on Master Plan.pdf | 17 Sep 2022 |
| PoaRR - Demarcation on DPFile: 2 PoaRR - Demarcation on DP.pdf | 17 Sep 2022 |
| Building Site PlanFile: 3 Building Sanction Plan.pdf | 17 Sep 2022 |
| Building 2- Residential 2 Basement and type even floor planFile: 4 Building 2- Residential 2 Basement and typ even floor plan.pdf | 17 Sep 2022 |
| Building 2- Residential 3 Basement and typical odd levels FPFile: 5 Building 2- Residential 3 Basement and typical odd levels FP.pdf | 17 Sep 2022 |
| Building 2- Residential 4 Basement 1st and typical floor planFile: 6 Building 2- Residential 4 Basement 1st and typical floor plan.pdf | 17 Sep 2022 |
| Building 2-Residential 1 Basement 33 and Terrace floor planFile: 7 Building 2-Residential 1 Basement 33 and Terrace floor plan.pdf | 17 Sep 2022 |
| Building 2-Residential ground floor plan and elevationFile: 8 Building 2-Residential ground floor plan and elevation.pdf | 17 Sep 2022 |
| Building 2- Residential SectionFile: 9 Building 2- Residential Section.pdf | 17 Sep 2022 |
| BBMP Building licenceFile: 10 BBMP Building licence.pdf | 17 Sep 2022 |
| Title Deed venkatamma Sy No 136 2A 6GFile: 11 Title Deed venkatamma Sy No 136 2A 6G.pdf | 17 Sep 2022 |
| Title Deed venkatamma Sy No 136 1A 3GFile: 12 Title Deed venkatamma Sy No 136 1A 3G.pdf | 17 Sep 2022 |
| Litigation AffidavitFile: 13 Litigation Affidavit.pdf | 17 Sep 2022 |
| OS 6657-2010 - Case Status and Order sheetFile: 14 OS 6657-2010 - Case Status and Order sheet.pdf | 17 Sep 2022 |
| OS 27087-2008 - Case Status and Order sheetFile: 15 OS 27087-2008 - Case Status and Order sheet.pdf | 17 Sep 2022 |
| KSPCB CFE sep-2022 with Fee paid receiptFile: 16 KSPCB CFE sep-2022 with Fee paid receipt.pdf | 17 Sep 2022 |
| Form 3 Engineer Certificate POARR Tower 8File: 17 Form 3 Engineer Certificate POARR Tower 8.pdf | 17 Sep 2022 |
| Hissa Phodi copy MR Sy No 136-1 2File: 18 Hissa Phodi copy MR Sy No 136-1 2.pdf | 17 Sep 2022 |
| Relinquishment and Rectification DeedFile: 19 Relinquishment and Rectification Deed.pdf | 17 Sep 2022 |
| BESCOM NOCFile: 20 BESCOM NOC.pdf | 17 Sep 2022 |
| BWSSB NOCFile: 21 BWSSB NOC.pdf | 17 Sep 2022 |
| Proforma RERA AOS PoARRFile: 22 Proforma RERA AOS PoARR.pdf | 17 Sep 2022 |
| Form B Affidavit 13-09-2022File: 23 Form B Affidavit 13-09-2022.pdf | 17 Sep 2022 |
| BBMP Approved Plan SignatureFile: 24 BBMP Approved Plan Signature.png | 17 Sep 2022 |
| BBMP Approved Building Sanction Plan Pg 1-4File: BBMP Approved Building Sanction Plan-1.pdf | 17 Sep 2022 |
| BBMP Approved Building Sanction Plan Pg 5-8File: BBMP Approved Building Sanction Plan-2.pdf | 17 Sep 2022 |
| BBMP Approved Building Sanction Plan Pg 9-12File: BBMP Approved Building Sanction Plan-3.pdf | 17 Sep 2022 |
| BBMP Approved Building Sanction Plan Pg 13-16File: BBMP Approved Building Sanction Plan-4.pdf | 17 Sep 2022 |
| BBMP Approved Building Sanction Plan Pg 17-20File: BBMP Approved Building Sanction Plan-5.pdf | 17 Sep 2022 |
| BBMP Approved Building Sanction Plan Pg 21-24File: BBMP Approved Building Sanction Plan-6.pdf | 17 Sep 2022 |
| BBMP Approved Building Sanction Plan Pg 25-28File: BBMP Approved Building Sanction Plan-7.pdf | 17 Sep 2022 |
| BBMP Approved Building Sanction Plan Pg 29-32File: BBMP Approved Building Sanction Plan-8.pdf | 17 Sep 2022 |
| RTC, survey 136/1 | - |
| Mutation, survey 136/1 | - |
| Encumbrance Certificate, survey 136/1 | - |
| Conversion/Alienation Order, survey 136/1 | - |
| Sale/Title/Gift Deed, survey 136/1 | - |
| Khatha, survey 136/1 | - |
| RTC, survey 136/2 | - |
| Mutation, survey 136/2 | - |
| Encumbrance Certificate, survey 136/2 | - |
| Conversion/Alienation Order, survey 136/2 | - |
| Sale/Title/Gift Deed, survey 136/2 | - |
| Khatha, survey 136/2 | - |
| RTC, survey 136/2 | - |
| Mutation, survey 136/2 | - |
| Encumbrance Certificate, survey 136/2 | - |
| Conversion/Alienation Order, survey 136/2 | - |
| Sale/Title/Gift Deed, survey 136/2 | - |
| Khatha, survey 136/2 | - |
| Registration CertificateFile: TEH COI.pdf | - |
| Organization StructureFile: Org Structure.pdf | - |
| Certificate issued by CA Form 1File: Form 1.pdf | - |
| Certificate issued by Architect Form 2File: Architect certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 POARR Tower 8.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| PURSUIT OF A RADICAL RHAPSODY PHASE 2 | Sy. No. 170(P), 170/1A, 169/1 to 169/4, 176/3, 177, 172/1, 172/2, 175 (P) & 136/1, Hoodi Village, KR Puram Hobli, Ward No. 82, Bangalore | Ongoing | Mar 2027 | Not due yet |
| PURSUIT OF A RADICAL RHAPSODY PHASE III | Sy. No. 170(P), 170/1A, 169/1 to 169/4, 176/3, 177, 172/1, 172/2, 175 (P) & 136/1 , Hoodi Village, KR Puram Hobli, Ward No. 82, Bangalore | Ongoing | Jun 2026 | Not delivered |
| PURSUITOFARADICALRHAPSODYPHASE1 | SyNo170P1701A1691to1694176317717211722175and1361, HoodiVillageKRPuramHobliWardNo82Bangalore | Ongoing | Apr 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep PURSUIT OF A RADICAL RHAPSODY- TOWER 8 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
JAI KINGS LAND
JAI SHELTERS
JAI ROYAL PARK
JAI INFRASTRUCTURES
Y @ WHITEFIELD
GEN Y SOCIAL COMMUNITIES AT WHITEFIELD LLP
The Grand Strand Address
Oravia Buildcraft LLP
JAI FORTUNE SQUARE
JAI BUILDERS
Pursuit of a Radical Rhapsody Tower 5
Total Environment Habitat Pvt. Ltd.
See every Bengaluru Urban project, with the district possession charts
Builder: Total Environment Habitat Pvt. Ltd.
Total Environment Habitat Pvt. Ltd. has 2 registrations on RERA Karnataka, including PURSUIT OF A RADICAL RHAPSODY- TOWER 8 and Pursuit of a Radical Rhapsody Tower 5. Its filings declare 4 earlier projects, none of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if PURSUIT OF A RADICAL RHAPSODY- TOWER 8 is delayed beyond 30 Sep 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of PURSUIT OF A RADICAL RHAPSODY- TOWER 8?
The registered promoter entity is Total Environment Habitat Pvt. Ltd., a company as per the filing. Its CIN U45201KA2010PTC054651 and GSTIN 29AADCT5683N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in PURSUIT OF A RADICAL RHAPSODY- TOWER 8?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at PURSUIT OF A RADICAL RHAPSODY- TOWER 8?
The professionals named in the filing: Architect: Varun Biltoria; Engineer: Vishnu Kumar; Chartered Accountant: Ankush Jain. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PURSUIT OF A RADICAL RHAPSODY- TOWER 8?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.