ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Pursuit of a Radical Rhapsody Tower 5

Registration approved Litigation declared Residential/Group Housing project

Pursuit of a Radical Rhapsody Tower 5

By Total Environment Habitat Pvt. Ltd.

RG-KA-10691 · RERA PRM/KA/RERA/1251/446/PR/281222/005565 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2029Possession promisedno revision filed
5 of 18Construction stages donefurthest along: RCC or MS Framed structure, 93%
22 of 130Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 177 documents Report an error

Pursuit of a Radical Rhapsody Tower 5 is a Residential/Group Housing project by Total Environment Habitat Pvt. Ltd. in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/281222/005565 on 28 Dec 2022. Possession is promised by 1 Dec 2029. 108 of the 130 units on this registration are recorded sold or booked, and 5 of 18 construction stages are filed complete.

At a glance

Project

  • NamePursuit of a Radical Rhapsody Tower 5
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560048
  • Pincode560048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/281222/005565
  • ReraGenie IDRG-KA-10691

Builder

  • NameTotal Environment Habitat Pvt. Ltd.
  • Entity typeCompany
  • CINU45201KA2010PTC054651
  • GSTIN29AADCT5683N1ZI
  • Authorized SignatorySuresh Chandra Bhandari
  • CeoRahul Kumar
  • DirectorsKamal Sagar, Mrs. Shibanee Sagar
  • Project HeadRahul Kumar
  • Other registrations1 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2022PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on28 Dec 2022
  • Promised completion1 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed177 files

Current status

83%108 of 130 units booked
61.7%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 05---1300130

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 93%.

Building: 33% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure93%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja work0%
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyYes0%
Common storage spacesYes0%

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,530 sq m
Named landowners3
LandownerVillageDistrict
Total Environment Habitat Private Limited--
Total Environment Habitat Private Limited--
Total Environment Habitat Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 410.39 cr
Cost incurredRs 253.17 cr
Spent of the estimate61.69%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 410.39 crRs 93.38 cr
On-site expenditure-Site Overhead-Rs 40.99 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)-Rs 118.80 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVarun Biltoria
EngineerVishnu Kumar
Chartered AccountantAnkush Jain

Litigation declared2

CaseCourtStatus
OS 27087/08City Civil Court, CCH 29-
2189/06Prl. Senior Civil Judge, Bengaluru Rural-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed177

As listed on the registration, under the names the promoter filed them with; the newest 80 of 177 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/281222/005565 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 PURSUIT OF A RADICAL RHAPSODY TOWER-05 Q2 26-27 .pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM-5 PURSUIT OF A RADICAL RHAPSODY TOWER-05 Q2 26-27 .pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM-6 PURSUIT OF A RADICAL RHAPSODY TOWER-05 Q2 26-27 .pdf15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 PoaRR T5 Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 PoaRR T5 Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 PoaRR T5 Q1 26-27.pdf15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Q4 25-26 POARR TOWER 5.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q4 25-26 POARR TOWER 5.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Q4 25-26 POARR TOWER 5.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: POARR Tower 5_CA Certificate Q3-25-26.pdf27 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Pursuit T05 2025-26 Q3 RERA Arch cert.pdf27 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Pursuit of a Radical Rhapsody Tower - 5 31-12-2025.pdf27 Jan 2026
Company PANFile: 1 Company PAN.pdf24 Dec 2022
Authorized Signatory PANFile: 2 Authorized Signatory PAN.pdf24 Dec 2022
BBMP Approved Plan Page 1File: BBMP Approved Plan Page 1.pdf24 Dec 2022
BBMP Approved Plan Page 2File: BBMP Approved Plan Page 2.pdf24 Dec 2022
BBMP Approved Plan Page 3File: BBMP Approved Plan Page 3.pdf24 Dec 2022
BBMP Approved Plan Page 4File: BBMP Approved Plan Page 4.pdf24 Dec 2022
BBMP Approved Plan Page 5File: BBMP Approved Plan Page 5.pdf24 Dec 2022
BBMP Approved Plan Page 6File: BBMP Approved Plan Page 6.pdf24 Dec 2022
BBMP Approved Plan Page 7File: BBMP Approved Plan Page 7.pdf24 Dec 2022
BBMP Approved Plan Page 8File: BBMP Approved Plan Page 8.pdf24 Dec 2022
BBMP Approved Plan Page 9File: BBMP Approved Plan Page 9.pdf24 Dec 2022
BBMP Approved Plan Page 10File: BBMP Approved Plan Page 10.pdf24 Dec 2022
BBMP Approved Plan Page 11File: BBMP Approved Plan Page 11.pdf24 Dec 2022
BBMP Approved Plan Page 12File: BBMP Approved Plan Page 12.pdf24 Dec 2022
BBMP Approved Plan Page 13File: BBMP Approved Plan Page 13.pdf24 Dec 2022
BBMP Approved Plan Page 14File: BBMP Approved Plan Page 14.pdf24 Dec 2022
BBMP Approved Plan Page 15File: BBMP Approved Plan Page 15.pdf24 Dec 2022
BBMP Approved Plan Page 16File: BBMP Approved Plan Page 16.pdf24 Dec 2022
BBMP Approved Plan Page 17File: BBMP Approved Plan Page 17.pdf24 Dec 2022
BBMP Approved Plan Page 18File: BBMP Approved Plan Page 18.pdf24 Dec 2022
BBMP Approved Plan Page 19File: BBMP Approved Plan Page 19.pdf24 Dec 2022
BBMP Approved Plan Page 20File: BBMP Approved Plan Page 20.pdf24 Dec 2022
BBMP Approved Plan Page 21File: BBMP Approved Plan Page 21.pdf24 Dec 2022
BBMP Approved Plan Page 22File: BBMP Approved Plan Page 22.pdf24 Dec 2022
BBMP Approved Plan Page 23File: BBMP Approved Plan Page 23.pdf24 Dec 2022
BBMP Approved Plan Page 24File: BBMP Approved Plan Page 24.pdf24 Dec 2022
BBMP Approved Plan Page 25File: BBMP Approved Plan Page 25.pdf24 Dec 2022
BBMP Approved Plan Page 26File: BBMP Approved Plan Page 26.pdf24 Dec 2022
BBMP Approved Plan Page 27File: BBMP Approved Plan Page 27.pdf24 Dec 2022
BBMP Approved Plan Page 28File: BBMP Approved Plan Page 28.pdf24 Dec 2022
BBMP Approved Plan Page 29File: BBMP Approved Plan Page 29.pdf24 Dec 2022
BBMP Approved Plan Page 30File: BBMP Approved Plan Page 30.pdf24 Dec 2022
BBMP Approved Plan Page 31File: BBMP Approved Plan Page 31.pdf24 Dec 2022
BBMP Approved Plan Page 32File: BBMP Approved Plan Page 32.pdf24 Dec 2022
Clarification wrt RTC and MR for Sy No 170-2 and 1BFile: 1 Clarification wrt RTC and MR for Sy No 170-2 and 1B.pdf24 Dec 2022
Amalgamated Deed and Amalgamated khata for all sy noFile: 2 Amalgamated Deed and Amalgamated khata for all sy no.pdf24 Dec 2022
Khata Sy No 170 14A 35G and MR and RTC for 176-3File: 3 Khata Sy No 170 14A 35G and MR and RTC for 176-3.pdf24 Dec 2022
Title Deed Sy No 170-1B Shivamoni Steel - Godha RealtorsFile: 4 Title Deed Sy No 170-1B Shivamoni Steel - Godha Realtors.pdf24 Dec 2022
Title Deed Sy No 170-2-Shivmoni Steel Tubes LTD in favour of Ramaiah ReddyFile: 5 Title Deed Sy No 170-2-Shivmoni Steel Tubes LTD in favour of Ramaiah Reddy.pdf24 Dec 2022
Title Deed Sy No 176-3-SD-Doddathayappa and Ors in favour of Nayadu Venkata Reddy and OrsFile: 6 Title Deed Sy No 176-3-SD-Doddathayappa and Ors in favour of Nayadu Venkata Reddy and Or24 Dec 2022
Sy No 176-3-Partnership Deed dated-10-04-2010File: 7 Sy No 176-3-Partnership Deed dated-10-04-2010.pdf24 Dec 2022
Sy No 176-3-GPA_Nayadu Venkata Reddy and Ors in favour of V Sivakumar ReddyFile: 8 Sy No 176-3-GPA_Nayadu Venkata Reddy and Ors in favour of V Sivakumar Reddy.pdf24 Dec 2022
PoaRR - Non-Litigation Affidavit to KRERAFile: 1 PoaRR - Non-Litigation Affidavit to KRERA.pdf24 Dec 2022
BWSSB NOC with clarificationFile: 1 BWSSB NOC with clarification.pdf24 Dec 2022
BESCOM NOC with clarificationFile: 2 BESCOM NOC with clarification.pdf24 Dec 2022
Query Response 24-12-2022File: Query Response 24-12-2022.pdf24 Dec 2022
RTC, survey 170/1B-
Mutation, survey 170/1B-
Encumbrance Certificate, survey 170/1B-
Conversion/Alienation Order, survey 170/1B-
Sale/Title/Gift Deed, survey 170/1B-
Khatha, survey 170/1B-
RTC, survey 170/2-
Mutation, survey 170/2-
Encumbrance Certificate, survey 170/2-
Conversion/Alienation Order, survey 170/2-
Sale/Title/Gift Deed, survey 170/2-
Khatha, survey 170/2-
RTC, survey 176/3-
Mutation, survey 176/3-

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date1 under way, not due yet
ProjectLocationStatusPromisedDelivered
PURSUIT OF A RADICAL RHAPSODY- TOWER 8SY.NO:175,170/1A,170/1B,170/2,172/1,2,169/1,2, 3,4,176/3,177,136/1,136/2 & 137 , Hoodi Village, KR Puram Hobli, Ward No. 82 , KR Puram , Bengaluru East , Bengaluru Urban, KarnatakaOngoingSep 2029Not due yet
PURSUIT OF A RADICAL RHAPSODY PHASE IIISy. No. 170(P), 170/1A, 169/1 to 169/4, 176/3, 177, 172/1, 172/2, 175 (P) & 136/1 , Hoodi Village, KR Puram Hobli, Ward No. 82, BangaloreOngoingJun 2026Not delivered
PURSUIT OF A RADICAL RHAPSODY PHASE 2Sy. No. 170(P), 170/1A, 169/1 to 169/4, 176/3, 177, 172/1, 172/2, 175 (P) & 136/1, Hoodi Village, KR Puram Hobli, Ward No. 82, BangaloreOngoingJun 2026Not delivered
PURSUITOFARADICALRHAPSODYPHASE1SyNo170P1701A1691to1694176317717211722175and1361, HoodiVillageKRPuramHobliWardNo82BangaloreOngoingApr 2025Not delivered

How this compares with Bengaluru Urban

83%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Pursuit of a Radical Rhapsody Tower 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmPursuit of a Radical RhaOther 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 42 registered projects within 2 km.

Builder: Total Environment Habitat Pvt. Ltd.

Total Environment Habitat Pvt. Ltd. has 2 registrations on RERA Karnataka, including PURSUIT OF A RADICAL RHAPSODY- TOWER 8 and Pursuit of a Radical Rhapsody Tower 5. Its filings declare 4 earlier projects, none of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Pursuit of a Radical Rhapsody Tower 5 is delayed beyond 1 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Pursuit of a Radical Rhapsody Tower 5?

The registered promoter entity is Total Environment Habitat Pvt. Ltd., a company as per the filing. Its CIN U45201KA2010PTC054651 and GSTIN 29AADCT5683N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Pursuit of a Radical Rhapsody Tower 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Pursuit of a Radical Rhapsody Tower 5?

The professionals named in the filing: Architect: Varun Biltoria; Engineer: Vishnu Kumar; Chartered Accountant: Ankush Jain. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pursuit of a Radical Rhapsody Tower 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pursuit of a Radical Rhapsody Tower 5. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pursuit of a Radical Rhapsody Tower 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.