Red flags
- Litigation declared, 2 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Pursuit of a Radical Rhapsody Tower 5 is a Residential/Group Housing project by Total Environment Habitat Pvt. Ltd. in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/281222/005565 on 28 Dec 2022. Possession is promised by 1 Dec 2029. 108 of the 130 units on this registration are recorded sold or booked, and 5 of 18 construction stages are filed complete.
At a glance
Project
- NamePursuit of a Radical Rhapsody Tower 5
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560048
- Pincode560048
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/281222/005565
- ReraGenie IDRG-KA-10691
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on28 Dec 2022
- Promised completion1 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed177 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 05 | - | - | - | 130 | 0 | 130 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 93%.
Building: 33% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 93% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Total Environment Habitat Private Limited | - | - |
| Total Environment Habitat Private Limited | - | - |
| Total Environment Habitat Private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 410.39 cr | Rs 93.38 cr |
| On-site expenditure-Site Overhead | - | Rs 40.99 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 118.80 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Varun Biltoria |
| Engineer | Vishnu Kumar |
| Chartered Accountant | Ankush Jain |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| OS 27087/08 | City Civil Court, CCH 29 | - |
| 2189/06 | Prl. Senior Civil Judge, Bengaluru Rural | - |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed177
As listed on the registration, under the names the promoter filed them with; the newest 80 of 177 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/281222/005565 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 PURSUIT OF A RADICAL RHAPSODY TOWER-05 Q2 26-27 .pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM-5 PURSUIT OF A RADICAL RHAPSODY TOWER-05 Q2 26-27 .pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM-6 PURSUIT OF A RADICAL RHAPSODY TOWER-05 Q2 26-27 .pdf | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 PoaRR T5 Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 PoaRR T5 Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 PoaRR T5 Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Q4 25-26 POARR TOWER 5.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q4 25-26 POARR TOWER 5.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Q4 25-26 POARR TOWER 5.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: POARR Tower 5_CA Certificate Q3-25-26.pdf | 27 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Pursuit T05 2025-26 Q3 RERA Arch cert.pdf | 27 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Pursuit of a Radical Rhapsody Tower - 5 31-12-2025.pdf | 27 Jan 2026 |
| Company PANFile: 1 Company PAN.pdf | 24 Dec 2022 |
| Authorized Signatory PANFile: 2 Authorized Signatory PAN.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 1File: BBMP Approved Plan Page 1.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 2File: BBMP Approved Plan Page 2.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 3File: BBMP Approved Plan Page 3.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 4File: BBMP Approved Plan Page 4.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 5File: BBMP Approved Plan Page 5.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 6File: BBMP Approved Plan Page 6.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 7File: BBMP Approved Plan Page 7.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 8File: BBMP Approved Plan Page 8.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 9File: BBMP Approved Plan Page 9.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 10File: BBMP Approved Plan Page 10.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 11File: BBMP Approved Plan Page 11.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 12File: BBMP Approved Plan Page 12.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 13File: BBMP Approved Plan Page 13.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 14File: BBMP Approved Plan Page 14.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 15File: BBMP Approved Plan Page 15.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 16File: BBMP Approved Plan Page 16.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 17File: BBMP Approved Plan Page 17.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 18File: BBMP Approved Plan Page 18.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 19File: BBMP Approved Plan Page 19.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 20File: BBMP Approved Plan Page 20.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 21File: BBMP Approved Plan Page 21.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 22File: BBMP Approved Plan Page 22.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 23File: BBMP Approved Plan Page 23.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 24File: BBMP Approved Plan Page 24.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 25File: BBMP Approved Plan Page 25.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 26File: BBMP Approved Plan Page 26.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 27File: BBMP Approved Plan Page 27.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 28File: BBMP Approved Plan Page 28.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 29File: BBMP Approved Plan Page 29.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 30File: BBMP Approved Plan Page 30.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 31File: BBMP Approved Plan Page 31.pdf | 24 Dec 2022 |
| BBMP Approved Plan Page 32File: BBMP Approved Plan Page 32.pdf | 24 Dec 2022 |
| Clarification wrt RTC and MR for Sy No 170-2 and 1BFile: 1 Clarification wrt RTC and MR for Sy No 170-2 and 1B.pdf | 24 Dec 2022 |
| Amalgamated Deed and Amalgamated khata for all sy noFile: 2 Amalgamated Deed and Amalgamated khata for all sy no.pdf | 24 Dec 2022 |
| Khata Sy No 170 14A 35G and MR and RTC for 176-3File: 3 Khata Sy No 170 14A 35G and MR and RTC for 176-3.pdf | 24 Dec 2022 |
| Title Deed Sy No 170-1B Shivamoni Steel - Godha RealtorsFile: 4 Title Deed Sy No 170-1B Shivamoni Steel - Godha Realtors.pdf | 24 Dec 2022 |
| Title Deed Sy No 170-2-Shivmoni Steel Tubes LTD in favour of Ramaiah ReddyFile: 5 Title Deed Sy No 170-2-Shivmoni Steel Tubes LTD in favour of Ramaiah Reddy.pdf | 24 Dec 2022 |
| Title Deed Sy No 176-3-SD-Doddathayappa and Ors in favour of Nayadu Venkata Reddy and OrsFile: 6 Title Deed Sy No 176-3-SD-Doddathayappa and Ors in favour of Nayadu Venkata Reddy and Or | 24 Dec 2022 |
| Sy No 176-3-Partnership Deed dated-10-04-2010File: 7 Sy No 176-3-Partnership Deed dated-10-04-2010.pdf | 24 Dec 2022 |
| Sy No 176-3-GPA_Nayadu Venkata Reddy and Ors in favour of V Sivakumar ReddyFile: 8 Sy No 176-3-GPA_Nayadu Venkata Reddy and Ors in favour of V Sivakumar Reddy.pdf | 24 Dec 2022 |
| PoaRR - Non-Litigation Affidavit to KRERAFile: 1 PoaRR - Non-Litigation Affidavit to KRERA.pdf | 24 Dec 2022 |
| BWSSB NOC with clarificationFile: 1 BWSSB NOC with clarification.pdf | 24 Dec 2022 |
| BESCOM NOC with clarificationFile: 2 BESCOM NOC with clarification.pdf | 24 Dec 2022 |
| Query Response 24-12-2022File: Query Response 24-12-2022.pdf | 24 Dec 2022 |
| RTC, survey 170/1B | - |
| Mutation, survey 170/1B | - |
| Encumbrance Certificate, survey 170/1B | - |
| Conversion/Alienation Order, survey 170/1B | - |
| Sale/Title/Gift Deed, survey 170/1B | - |
| Khatha, survey 170/1B | - |
| RTC, survey 170/2 | - |
| Mutation, survey 170/2 | - |
| Encumbrance Certificate, survey 170/2 | - |
| Conversion/Alienation Order, survey 170/2 | - |
| Sale/Title/Gift Deed, survey 170/2 | - |
| Khatha, survey 170/2 | - |
| RTC, survey 176/3 | - |
| Mutation, survey 176/3 | - |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| PURSUIT OF A RADICAL RHAPSODY- TOWER 8 | SY.NO:175,170/1A,170/1B,170/2,172/1,2,169/1,2, 3,4,176/3,177,136/1,136/2 & 137 , Hoodi Village, KR Puram Hobli, Ward No. 82 , KR Puram , Bengaluru East , Bengaluru Urban, Karnataka | Ongoing | Sep 2029 | Not due yet |
| PURSUIT OF A RADICAL RHAPSODY PHASE III | Sy. No. 170(P), 170/1A, 169/1 to 169/4, 176/3, 177, 172/1, 172/2, 175 (P) & 136/1 , Hoodi Village, KR Puram Hobli, Ward No. 82, Bangalore | Ongoing | Jun 2026 | Not delivered |
| PURSUIT OF A RADICAL RHAPSODY PHASE 2 | Sy. No. 170(P), 170/1A, 169/1 to 169/4, 176/3, 177, 172/1, 172/2, 175 (P) & 136/1, Hoodi Village, KR Puram Hobli, Ward No. 82, Bangalore | Ongoing | Jun 2026 | Not delivered |
| PURSUITOFARADICALRHAPSODYPHASE1 | SyNo170P1701A1691to1694176317717211722175and1361, HoodiVillageKRPuramHobliWardNo82Bangalore | Ongoing | Apr 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Pursuit of a Radical Rhapsody Tower 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
JAI KINGS LAND
JAI SHELTERS
PURSUIT OF A RADICAL RHAPSODY- TOWER 8
Total Environment Habitat Pvt. Ltd.
JAI ROYAL PARK
JAI INFRASTRUCTURES
Y @ WHITEFIELD
GEN Y SOCIAL COMMUNITIES AT WHITEFIELD LLP
The Grand Strand Address
Oravia Buildcraft LLP
JAI FORTUNE SQUARE
JAI BUILDERS
See every Bengaluru Urban project, with the district possession charts
Builder: Total Environment Habitat Pvt. Ltd.
Total Environment Habitat Pvt. Ltd. has 2 registrations on RERA Karnataka, including PURSUIT OF A RADICAL RHAPSODY- TOWER 8 and Pursuit of a Radical Rhapsody Tower 5. Its filings declare 4 earlier projects, none of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Pursuit of a Radical Rhapsody Tower 5 is delayed beyond 1 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Pursuit of a Radical Rhapsody Tower 5?
The registered promoter entity is Total Environment Habitat Pvt. Ltd., a company as per the filing. Its CIN U45201KA2010PTC054651 and GSTIN 29AADCT5683N1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Pursuit of a Radical Rhapsody Tower 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Pursuit of a Radical Rhapsody Tower 5?
The professionals named in the filing: Architect: Varun Biltoria; Engineer: Vishnu Kumar; Chartered Accountant: Ankush Jain. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Pursuit of a Radical Rhapsody Tower 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback