Registration approved No litigation declared Residential/Group Housing project

PRISTINE PARK SQUARE

By PRISTINE PARK SQUARE

RG-KA-35180 · RERA PRM/KA/RERA/1249/447/PR/270924/007085 · Last updated on RERA Karnataka portal: 25 Sep 2024

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 111 documents Report an error

PRISTINE PARK SQUARE is a Residential/Group Housing project by PRISTINE PARK SQUARE in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/270924/007085 on 27 Sep 2024. Possession is promised by 30 Sep 2026.

At a glance

Project

  • NamePRISTINE PARK SQUARE
  • TypeResidential/Group Housing
  • Location
    • Belagavi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1249/447/PR/270924/007085
  • ReraGenie IDRG-KA-35180

Builder

  • NamePRISTINE PARK SQUARE
  • Entity typePartnership Firm
  • GSTIN29ABCFP8229R1ZB
  • Authorized SignatorySARFARAZ MOHAMMADSAB SHAIKH

Key dates

this monthRegisteredSep 2024PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on27 Sep 2024
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRISTINE PARK SQUARE---15015

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 25 Sep 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities30

As on 25 Sep 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
JIAVIRYA D/O. MAINUDDIN ABDULGANI--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 3.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAHBAZ KHATIB
EngineerVINAY BEHERE
Chartered AccountantCHANNABASAVRAJ BOLMAL

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed111

As listed on the registration, under the names the promoter filed them with; the newest 80 of 111 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/270924/007085 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Source of fund to complete the project with supporting documentsFile: Source of fund with supporting document.pdf25 Sep 2024
CTS map (Village Map)File: VILLAGE MAP-CTS MAP.pdf25 Sep 2024
about total number of units as per approved planFile: number of units.pdf25 Sep 2024
about village mapFile: about village Map.pdf25 Sep 2024
Financial with Promoter signatureFile: Park Square Financial Statement.pdf27 Aug 2024
Source of fund with supporting documentFile: Source of fund with supporting document.pdf27 Aug 2024
EC from 01012023 to till dateFile: Park Square EC.PDF27 Aug 2024
Original Building License of local authority with QR CodeFile: Building permission PS.pdf27 Aug 2024
Arch details with valid COA NumberFile: Council of Architecture.pdf27 Aug 2024
Approved Master plan Extra certified by the concern Authority.File: master plan.jpg27 Aug 2024
about land cost detailsFile: Land cost calculations.pdf27 Aug 2024
AOS as notified with defect liability clauseFile: Draft of Agreement of sale.pdf27 Aug 2024
Form 6File: Form-6 Enginner.pdf27 Aug 2024
CA CERTIFICATE WITH THREE BANK ACCOUNT DETAILSFile: CA certificate.pdf12 Jul 2024
SELF ATTESTED PAN OF FIRMFile: sefl attested PAN of firm.pdf12 Jul 2024
GST CERTIFICATEFile: GST.pdf12 Jul 2024
LETTER OF AUTHORIZATIONFile: authorization letter.pdf12 Jul 2024
ABOUT BALANCE SHEET AND P AND L FOR 2021-22 WITH CA UDINFile: about IT, Balance sheet, P and L 2021-22, 2022-23.pdf12 Jul 2024
BALANCE SHEET AND P AND L WITH CA UDIN FOR 2022-23File: P and L, Balance sheet 2022-23 with CA UDIN.pdf12 Jul 2024
BALANCE SHEET AND P AND L WITH CA UDIN FOR 2023-24File: P and L, Balance sheet 2023-24 with CA UDIN.pdf12 Jul 2024
SOURCE OF FUND WITH SUPPORTING DOCUMENTSFile: Source of Fund_merged.pdf12 Jul 2024
CURRENT RTC AND MRFile: CURRENT RTC AND MR.pdf12 Jul 2024
EC FROM 13/01/2023 TILL DATEFile: EC April - June 2024.pdf12 Jul 2024
CONVERSION ORDER BY DCFile: ABOUT CONVERSION ORDER (1).pdf12 Jul 2024
ABOUT IT BALANCE SHEET AND P AND L 2021-22, 2022-23File: about IT, Balance sheet, P and L 2021-22, 2022-23.pdf12 Jul 2024
LATEST KHATA EXTRACT FROM LOCAL AUTHORITYFile: Form2 24-25.pdf12 Jul 2024
ABOUT SINGLE PLOT LAYOUT ORDER AND PLANFile: About Single Plot layout and its order (1).pdf12 Jul 2024
CERTIFIED CARPET AREA CALCULATIONSFile: certified area statement.jpeg12 Jul 2024
ABOUT RELEASE (RELINQUISHMENT) DEEDFile: ABOUT RELEASE DEED (1).pdf12 Jul 2024
ALL SANCTIONED DRAWING AND ELEVATIONS, FLOOR PLAN SECTIONAL DRAWING AND ELEVATIONFile: approved plan.pdf12 Jul 2024
VILLAGE MAP (CTS MAP)File: VILLAGE MAP-CTS MAP.pdf12 Jul 2024
ABOUT KSPCB NOCFile: ABOUT POLLUTION NOC.pdf12 Jul 2024
LATEST ORIGINAL COPY OF LICENSE OF ENGINEERFile: original license of Engineer.pdf12 Jul 2024
ABOUT CAR PARKING ALLOTMENTFile: about car parking.pdf12 Jul 2024
ABOUT he Construction Cost Details properly from Sl. no. (2) to (13),File: about cost of construction in sr 2 to 13.pdf12 Jul 2024
SEWER LINE DRAWINGFile: sewer line drawing.pdf12 Jul 2024
DRAFT OF AGREEMENT OF SALEFile: Draft of Agreement of sale.pdf12 Jul 2024
PROJECT SPECIFICATION WITH PROJECT NAME AND ADDRESSFile: Specification.pdf12 Jul 2024
BRIEF ESTIMATION OF CONSTRUCTIONFile: Park square estimation costing.pdf12 Jul 2024
CERTIFIED COMMON AREA AND AMENITIES CALCULATIOSFile: certified common area and amenitied calculation.jpeg12 Jul 2024
GST CERTIFICATEFile: GST.pdf28 Jun 2024
SELF ATTESTED PAN OF FIRMFile: sefl attested PAN of firm.pdf28 Jun 2024
CERTIFIED CARPET AREAFile: certified area statement.jpeg28 Jun 2024
CERTIFIED COMMON AREA AND AMENITIESFile: certified common area and amenitied calculation.jpeg28 Jun 2024
ABOUT RELINQUSIHMENT DEEDFile: ABOUT RELEASE DEED.pdf28 Jun 2024
ABOUT CONVERSION ORDERFile: About Single Plot layout and its order.pdf28 Jun 2024
ABOUT SINGLE PLOT LAYOUT AND ITS ORDERFile: About Single Plot layout and its order.pdf28 Jun 2024
ORIGINAL LICENSE OF ENGINEERFile: original license of Engineer.pdf28 Jun 2024
COA CERTIFICATEFile: Arch certificate.jpeg28 Jun 2024
SOURCE OF FUNDFile: Source of Fund.pdf28 Jun 2024
ABOUT CAR PARKING ALLOTMENTFile: about number car parking.pdf28 Jun 2024
ALL SANCTIONED DRAWING FLOOR PLAN SECTIONAL DRAWINGS AND ELVATIONSFile: approved plan.pdf28 Jun 2024
Registration CertificateFile: Firm Registration PS.pdf-
Partnership DeedFile: Partnership Deed PS.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA.pdf-
Certificate issued by Architect Form 2File: Form2.pdf-
Certificate issued by Engineer Form 3File: Form3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: no litigation affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 CA.pdf-
Balance Sheet 2022 - 2023File: BSheet F Y 2022-23.pdf-
Audited Profit and Loss Statement 2022 - 2023File: PandLF Y 2022-23.pdf-
Building permission PS-
Hescom NOC PS-
Water NOC PS-
approved plan-
approved plan-
approved plan-
approved plan-
approved plan-
Project specification (1)-
approved plan-
approved plan-
Stability certificate-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep PRISTINE PARK SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

Builder: PRISTINE PARK SQUARE

PRISTINE PARK SQUARE has 1 registration on RERA Karnataka, including PRISTINE PARK SQUARE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if PRISTINE PARK SQUARE is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PRISTINE PARK SQUARE?

The registered promoter entity is PRISTINE PARK SQUARE, a partnership firm as per the filing. Its GSTIN 29ABCFP8229R1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PRISTINE PARK SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PRISTINE PARK SQUARE?

The professionals named in the filing: Architect: SHAHBAZ KHATIB; Engineer: VINAY BEHERE; Chartered Accountant: CHANNABASAVRAJ BOLMAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRISTINE PARK SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRISTINE PARK SQUARE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRISTINE PARK SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.