Home / Browse projects / Bengaluru Urban, Karnataka / Prestige Raintree Park
Prestige Raintree Park
By PRESTIGE ESTATES PROJECTS LTD
RG-KA-24777 · RERA PRM/KA/RERA/1251/446/PR/270824/006981 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 1 complaint at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
Prestige Raintree Park is a Residential/Group Housing project by PRESTIGE ESTATES PROJECTS LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/270824/006981 on 27 Aug 2024. Possession is promised by 31 Dec 2028. 1,455 of the 1,520 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NamePrestige Raintree Park
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560001
- Pincode560001
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/270824/006981
- ReraGenie IDRG-KA-24777
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on27 Aug 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings18 building records
- Documents filed548 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 1 - Tower 1 | - | - | - | 74 | 0 | 74 |
| Building 1 Tower 2 | - | - | - | 110 | 0 | 110 |
| Building 1 Tower 3 | - | - | - | 74 | 0 | 74 |
| Building 1 Tower 4 | - | - | - | 74 | 0 | 74 |
| Building 2 Tower 5 | - | - | - | 74 | 0 | 74 |
| Building 2 Tower 6 | - | - | - | 74 | 0 | 74 |
| Building 2 Tower 7 | - | - | - | 74 | 0 | 74 |
| Building 2 Tower 8 | - | - | - | 74 | 0 | 74 |
| Building 2 Tower 9 | - | - | - | 74 | 0 | 74 |
| Building 3 Tower 10 | - | - | - | 112 | 0 | 112 |
| Building 3 Tower 11 | - | - | - | 74 | 0 | 74 |
| Building 3 Tower 12 | - | - | - | 74 | 0 | 74 |
| Building 3 Tower 13 | - | - | - | 112 | 0 | 112 |
| Building 4 Tower 14 | - | - | - | 112 | 0 | 112 |
| Building 4 Tower 15 | - | - | - | 74 | 0 | 74 |
| Building 4 Tower 16 | - | - | - | 74 | 0 | 74 |
| Building 4 Tower 17 | - | - | - | 74 | 0 | 74 |
| Building 4 Tower 18 | - | - | - | 112 | 0 | 112 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 18 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 75%.
Building: 35% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 75% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 55% |
| Masonry Construction | 49% |
| Plastering inside , outside & Ceiling | 29% |
| Joinery: Doors, Windows, Ventilators etc | 5% |
| Basic work of Water supply, Sanitary and Electrification | 5% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 5% |
| Railing and Grill fixing | 2% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 5% |
| Fire prevention and fire fighting fitting and fixture with network | 8% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 10% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 23% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 27% |
| Lifts | Yes | 27% |
| Corridor/Lobbies | Yes | 27% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership65
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projetcs Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
| Prestige Estates Projects Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 1,387.77 cr | Rs 667.72 cr |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 266.88 cr | Rs 13.29 cr |
| Payment of taxes | Rs 253.31 cr | Rs 116.15 cr |
| On-site expenditure-Site Overhead | Rs 234.85 cr | Rs 128.24 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 138.78 cr | Rs 201.71 cr |
| On-site expenditure-Consultants Fees | Rs 32.03 cr | Rs 41.22 cr |
| On-site expenditure-Salaries of workers | Rs 13.88 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Zachariah Consultants |
| Engineer | Design Tree Service Consultants |
| Chartered Accountant | M Padmanabha Bhat |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 01029/2024 | - | PRESTIGE ESTATES PROJECTS LTD | 18/10/2024 |
Documents filed548
As listed on the registration, under the names the promoter filed them with; the newest 80 of 548 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/270824/006981 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q2 2026-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Q2 2026-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q2 2026-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q1 2026-27 Raintree Park.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Q1 2026-27 Raintree Park.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q1 2026-27 Raintree Park.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q4 Raintree Park.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Q4 Raintree Park.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q4 Raintree Park.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q3 Raintree Park.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Q3 Raintree Park.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Q3 Raintree Park.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Payment requestFile: Raintree Park - BESCOM NOC Payment request.jpeg | 19 Aug 2024 |
| Payment receiptFile: Raintree Park - Payment receipt.jpeg | 19 Aug 2024 |
| DP work orderFile: BDA Work Order.pdf | 2 Aug 2024 |
| Carpet Area signedFile: SALEABLE AREA STATEMENT.pdf | 2 Aug 2024 |
| CDPFile: Land use -Model CDP.pdf | 2 Aug 2024 |
| Village MapFile: Raintree park Combined Village Map.pdf | 2 Aug 2024 |
| CFE acknowledgmentFile: CFE-ack.png | 2 Aug 2024 |
| MOEF acknowledgementFile: Raintree Park - Ack.jpg | 2 Aug 2024 |
| Relinquishment DeedFile: RELINQUISHMENT DEED.pdf | 2 Aug 2024 |
| Building licenseFile: cc_BBMP_EoDB_CH_12135_24-25.pdf | 2 Aug 2024 |
| ZR copyFile: ZR Naala Buffer.png | 2 Aug 2024 |
| Sensitive Zone ClearanceFile: Amanibellanduru and Ramagondanahalli Sensitive Order Copy.pdf | 2 Aug 2024 |
| Engineer's license copyFile: BEP KAR License Signed Copy.pdf | 2 Aug 2024 |
| Allotment LetterFile: Allotment Letter RERA - R1.pdf | 2 Aug 2024 |
| HAL NOCFile: HAL NOC.pdf | 2 Aug 2024 |
| STP feasibility designFile: STP Feasibility Report.pdf | 2 Aug 2024 |
| Project specificationsFile: Specs - With Address.pdf | 2 Aug 2024 |
| MOA AOAFile: MOA AOA PEPL.pdf | 2 Aug 2024 |
| Source of FundFile: Source of Fund.pdf | 2 Aug 2024 |
| Land cost calculation sheetFile: Land Valuation RTP.pdf | 2 Aug 2024 |
| Estimated cost of constructionFile: Cost of Construction.pdf | 2 Aug 2024 |
| Annual audit report of the previous projectFile: Elm Park AR F7 23.pdf | 2 Aug 2024 |
| Director's financial statementsFile: Directos Financial Statements NA.pdf | 2 Aug 2024 |
| CA MemabershipFile: CA Mebership Card.pdf | 2 Aug 2024 |
| IR - Director KYCFile: IR_Passport_New.pdf | 2 Aug 2024 |
| RR - Director KYCFile: RR NEW PASSPORT.pdf | 2 Aug 2024 |
| NR - Directors KYCFile: Noaman Razack New passport.pdf | 2 Aug 2024 |
| RTC 21/2File: RTC 21-2.pdf | 2 Aug 2024 |
| RTC 349-3File: RTC 349-3.pdf | 2 Aug 2024 |
| EC Consolidated 01042022 to 16072024File: EC Consolidated_compressed.pdf | 2 Aug 2024 |
| EC Consolidated-2File: EC addl Consolidated.pdf | 2 Aug 2024 |
| EC 348-4File: EC 01012003 to 30062024 - 348-4.pdf | 2 Aug 2024 |
| EC 348-5File: EC 01012003 to 30062024 - 348-5.pdf | 2 Aug 2024 |
| EC 348-6File: EC 01012003 to 30062024 - 348-6.pdf | 2 Aug 2024 |
| EC 348-7File: EC 01012003 to 29062024 348-7.pdf | 2 Aug 2024 |
| EC 349-2File: EC 01012003 to 30062024 - 349-2.pdf | 2 Aug 2024 |
| EC 349-3File: EC 01012003 to 30062024 - 349-3.pdf | 2 Aug 2024 |
| Sale Deed 348-7File: SD-348-7.pdf | 2 Aug 2024 |
| Sale Deed 350-4File: SD-Aayas-26 Acres.pdf | 2 Aug 2024 |
| OM 22-2File: OM 22-2.PDF | 2 Aug 2024 |
| OM 21-4File: 21 - 4.pdf | 2 Aug 2024 |
| OM 24-1File: OM 24-1.pdf | 2 Aug 2024 |
| OM 25-1File: OM 25-1.pdf | 2 Aug 2024 |
| OM 25/2BFile: OM 25-2B.pdf | 2 Aug 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Prestige Raintree Park on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 49 registered projects within 2 km.
Prestige Southern Star
PRESTIGE ACRES PRIVATE LIMITED
Evergreen @ Prestige Raintree Park
PRESTIGE ESTATES PROJECTS LTD
Fernvale @ The Prestige City
PRESTIGE PROJECTS PRIVATE LIMITED
UMIYA PRISM
UMIYA BUILDTEK
BHOOMI SKANDA
SHIVAKUMAR S
Century Seasons Phase 2
GEETANJALI EFFECTIVE REALTY SOLUTIONS PRIV
See every Bengaluru Urban project, with the district possession charts
Builder: PRESTIGE ESTATES PROJECTS LTD
PRESTIGE ESTATES PROJECTS LTD has 19 registrations on RERA Karnataka, including PRESTIGE GARDENIA ESTATE PHASE 2 and Prestige Gardenia Estate. Its filings declare 7 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Prestige Raintree Park is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Prestige Raintree Park?
The registered promoter entity is PRESTIGE ESTATES PROJECTS LTD, a company as per the filing. Its CIN U07010KA1997PLC022322 and GSTIN 29AABCP8096K1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Prestige Raintree Park?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Prestige Raintree Park?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Prestige Raintree Park?
The professionals named in the filing: Architect: Zachariah Consultants; Engineer: Design Tree Service Consultants; Chartered Accountant: M Padmanabha Bhat. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Prestige Raintree Park?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.