Home / Browse projects / Bengaluru Urban, Karnataka / PINAKI PARADISE

Registration approved No litigation declared Residential/Group Housing project

PINAKI PARADISE

By ABD Builders

RG-KA-92595 · RERA PRM/KA/RERA/1251/310/PR/010923/006215 · Last updated on RERA Karnataka portal: 26 Aug 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 114 documents Report an error

PINAKI PARADISE is a Residential/Group Housing project by ABD Builders in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/010923/006215 on 1 Sep 2023. Possession is promised by 31 Dec 2024.

At a glance

Project

  • NamePINAKI PARADISE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560060
  • Pincode560060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/010923/006215
  • ReraGenie IDRG-KA-92595

Builder

  • NameABD Builders
  • Entity typePartnership Firm
  • GSTIN29ABXFA6282E1ZV
  • Authorized SignatorySM Badarinath

Key dates

this monthRegisteredSep 2023PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on1 Sep 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PINAKI PARADISE---64064

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 26 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,664 sq m
Named landowners1
LandownerVillageDistrict
ABD Builders--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 19.53 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 18.83 cr-
On-site expenditure-Site OverheadRs 50.00 lakh-
Payment of chargesRs 20.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectC Jalaja
EngineerChaitra Bai
Chartered AccountantShivaswamy PS

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed114

As listed on the registration, under the names the promoter filed them with; the newest 80 of 114 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/010923/006215 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Sources of FundsFile: 1 sources of funds.pdf26 Aug 2023
Banks proposal and ackFile: 2 Proposal to KVB.pdf26 Aug 2023
Clarification on land purchased and treatment in accounts with the support of Financial StatementsFile: Clarification on accounting of land purchased.pdf26 Aug 2023
Sources of Funds to execute the projectFile: 1 sources of funds.pdf15 Aug 2023
Proposal given to the bankers for loanFile: 2 Proposal to KVB.pdf15 Aug 2023
BESCOM's NOC with the Seal and Signature of the Authority issued itFile: 3 NOC BESCOM merged.pdf15 Aug 2023
Clarification on the land purchased grouping under the Current Asset in BS 2022-23File: 1 Clarification on Land purchased and grouping under Current Asset.pdf28 Jul 2023
Sources of Funds to Execute the ProjectFile: 2 Source of funds.pdf28 Jul 2023
Khatha, Extract and Certificate in the name of the PromoterFile: 3 KHATHA and Extract of the promoiter.pdf28 Jul 2023
Clarification on FAR as the same could not be edited on the portal pageFile: 4 FAR Clarification (1).pdf28 Jul 2023
CDP KengeriFile: 5 CDP New - Kengeri.pdf28 Jul 2023
Plinth Area ClarificationFile: 6 Plinth Area Clarification (1).pdf28 Jul 2023
NOC BESCOM with Fee Paid ReceiptFile: 7 BESCOM NOC WITH FEES_0001.pdf28 Jul 2023
Clarification on the legibility of fee paid receipt of BESCOMFile: 7 Clarification on BESCOM Payment Receipt.pdf28 Jul 2023
NOC BWSSBFile: 8 BWSSB NOC.pdf28 Jul 2023
BWSSB fee paid receipt for NOCFile: 9 BWSSB Fee Paid Receipt for NOC.pdf28 Jul 2023
Unit wise details of the ApartmentFile: UNIT WISE DETAILS with addl sheets.xls28 Jul 2023
Land purchased is considered as inventory and grouping of it under Current AssetFile: BS and grouping of Current Asset.pdf28 Jul 2023
CDP with the Site No 35File: CDP WITH SITE NO 35.pdf28 Jul 2023
Village MAP with Site No 35File: VILLAGE MAP WITH SITE NO 35.pdf28 Jul 2023
Sources of fund to execute the projectFile: Sources of funds with letters.pdf27 Jun 2023
Ownership of the land prior to purchase of it by ABD BuildersFile: Possession of land by Swamiji_compressed.pdf27 Jun 2023
Break up of units under the project in detail as desiredFile: Break up of units.pdf27 Jun 2023
Carpet Area Calculations of individual units have been done in the inventory columnFile: Break up of units.pdf27 Jun 2023
Clarification on FARFile: FAR Clarification.pdf27 Jun 2023
Clarification over the height of the buildingFile: Clarification on height of the tower.pdf27 Jun 2023
Single Plot LayoutFile: SINGLE PLOT LAYOUT Clarification.pdf27 Jun 2023
Single plot layout orderFile: SINGLE PLOT LAYOUT Clarification.pdf27 Jun 2023
CDP MapFile: CDP Map.pdf27 Jun 2023
Village MapFile: VILLAGE MAP FOR SY NO 207 yellow round mark.pdf27 Jun 2023
Clarification on commencement certificate to considerFile: YES Clarification on Commencement Certificate.pdf27 Jun 2023
Project Classification to consider as a launchFile: Project classification.pdf27 Jun 2023
Form 3File: ER Form 3.pdf27 Jun 2023
Stability CertificateFile: structure eng certificate 1.pdf27 Jun 2023
Engineer's LicenseFile: Engineer's License.pdf27 Jun 2023
Section 3(1) Affidavit with project name and addressFile: AFFIDAVIT Section 3(1).pdf27 Jun 2023
STP DrawingFile: stp drawing.pdf27 Jun 2023
Main source of water is borewell and clear submission with the picsFile: Source of water with pics.pdf27 Jun 2023
Proforma of allotment letter with Annexure AFile: Proforma of Allotment Letter as per RERA 1.pdf27 Jun 2023
BWSSB Clarification with the AffidavitFile: BWSSB clarification with Affidavit.pdf27 Jun 2023
BESCOM Clarification with the AffidavitFile: BESCOM Clarification with Affidavit.pdf27 Jun 2023
Detailed estimation of construction of projectFile: ESTIMATION OF PROJECT.pdf27 Jun 2023
RTC, survey 207/1A-
Mutation, survey 207/1A-
Encumbrance Certificate, survey 207/1A-
Conversion/Alienation Order, survey 207/1A-
Sale/Title/Gift Deed, survey 207/1A-
Khatha, survey 207/1A-
Registration CertificateFile: REGN PARTNERSHIP_compressed.pdf-
Partnership DeedFile: REGN PARTNERSHIP.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: C A CERTIFICATE.pdf-
Certificate issued by Architect Form 2File: Form 2 Ar Certificate.pdf-
Certificate issued by Engineer Form 3File: ENGINEER CERTIFICATE Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NO LITIGATION AFFADAVIT.pdf-
Balance Sheet 2021 - 2022File: BS merged 22-23.pdf-
Balance Sheet 2020 - 2021File: BS 21-22_merged.pdf-
Audited Profit and Loss Statement 2021 - 2022File: P & L 22-23.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P&L 21-22.pdf-
Cash Flow Statement 2021 - 2022File: Cash Flow for 2022-23.pdf-
Cash Flow Statement 2020 - 2021File: Cash Flow for 2021-22.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR AY 22-23.pdf-
AFFDIVATE For Power and Water-
AFFDIVATE For Power and Water-
Sanction Plan-
Final Project Specification-
Advocate Search Report-
Final AFS-
Final PAL-
B Declaration F-
Registration - Notarized Affidavit for 3(1) Voliation-
AFFDIVATE For Power and Water-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep PINAKI PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmPINAKI PARADISEOther 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: ABD Builders

ABD Builders has 1 registration on RERA Karnataka, including PINAKI PARADISE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if PINAKI PARADISE is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PINAKI PARADISE?

The registered promoter entity is ABD Builders, a partnership firm as per the filing. Its GSTIN 29ABXFA6282E1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PINAKI PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PINAKI PARADISE?

The professionals named in the filing: Architect: C Jalaja; Engineer: Chaitra Bai; Chartered Accountant: Shivaswamy PS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PINAKI PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PINAKI PARADISE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PINAKI PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.