Home / Browse projects / Bengaluru Urban, Karnataka / Provident Equinox 5
Provident Equinox 5
RG-KA-29372 · RERA PRM/KA/RERA/1251/310/PR/170126/008410 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Provident Equinox 5 is a Residential/Group Housing project by Provident Housing Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170126/008410 on 17 Jan 2026. Possession is promised by 31 Mar 2030. 98 of the 396 units on this registration are recorded sold or booked, and 1 of 15 construction stages are filed complete.
At a glance
Project
- NameProvident Equinox 5
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560060
- Pincode560060
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/170126/008410
- ReraGenie IDRG-KA-29372
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 Jan 2026
- Promised completion31 Mar 2030
- Revised completionNone
- Buildings6 building records
- Documents filed109 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | - | - | - | 48 | 0 | 48 |
| Wing B | - | - | - | 60 | 0 | 60 |
| Wing C | - | - | - | 84 | 0 | 84 |
| Wing D | - | - | - | 48 | 0 | 48 |
| Wing E | - | - | - | 84 | 0 | 84 |
| Wing F | - | - | - | 72 | 0 | 72 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 15 construction stages are filed complete. The stage furthest along is Foundation footing work, at 0%.
Building: 7% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Provident Housing Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 208.20 cr | Rs 29.14 cr |
| On-site expenditure-Site Overhead | Rs 20.98 cr | Rs 6.44 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 20.57 cr | Rs 3.87 cr |
| On-site expenditure-Salaries of workers | Rs 6.39 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.59 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Venkataramanan Associates |
| Engineer | Dinesh Bellad |
| Chartered Accountant | Bhuvana Bhat and Associates |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed109
As listed on the registration, under the names the promoter filed them with; the newest 80 of 109 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170126/008410 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Equinox Phase 5_compressed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Equinox 5 Architect Certificate Sep26.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: EQUINOX-V_2026-27_Q2.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Equinox Phase 5 RERA Form 4 Jun26_compressed.pdf | 28 Sep 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Equinox 5 Architect Certificate Jun26.pdf | 28 Sep 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Equinox-Ph5 Engineering Certificate Jun26.pdf | 28 Sep 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Equinox 5 RERA From 4 Mar26.pdf | 25 Sep 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Phase 5 (RERA) - Architect Certificate.pdf | 25 Sep 2026 |
| Phase wise Area StatementFile: Area details phase wise with future Phases.pdf | 16 Jan 2026 |
| STP ReportFile: STP Report.pdf | 16 Jan 2026 |
| STP DrawingFile: STP DESIGN EQUINOX 5.pdf | 16 Jan 2026 |
| Proforma Agreement for Sale UpdatedFile: AGREEMENT FOR SALE - EQUINOX 5 - RERA PROFORMA.pdf | 16 Jan 2026 |
| Brief Estimation CostFile: Equinox5 Signed Budget on 30122025.pdf | 16 Jan 2026 |
| Area Statement Equinox 5File: Area Statement Detail.pdf | 16 Jan 2026 |
| BESCOM NOCFile: BESCOM NOC Upload_compressed.pdf | 16 Jan 2026 |
| Fire NOCFile: fire nocmergedcompressed.pdf | 16 Jan 2026 |
| NOC DeclarationFile: NOC DECLARATION.pdf | 16 Jan 2026 |
| Plan Approval LetterFile: Plan Approval letter.pdf | 16 Jan 2026 |
| Basement Floor PlanFile: Basement Floor Plan.pdf | 16 Jan 2026 |
| Stilt Floor PlanFile: Stilt Floor Plan.pdf | 16 Jan 2026 |
| Elevation and Section PlanFile: Elevation and Section Plan.pdf | 16 Jan 2026 |
| Terrace Floor PlanFile: Terrace Floor Plan.pdf | 16 Jan 2026 |
| Detailed Site PlanFile: Detail Site Plan.pdf | 16 Jan 2026 |
| Development Plan ApprovalFile: Development Plan Approval.pdf | 16 Jan 2026 |
| Development PlanFile: Development Plan.jpg | 16 Jan 2026 |
| Phase wise Demarcation PlanFile: PHASE WISE LAND AREA Demarcated.pdf | 16 Jan 2026 |
| Building LicenceFile: Equinox 5 Building Licence.jpg | 12 Jan 2026 |
| Google location and coordinatesFile: Google GPS Equinpx 5.png | 12 Jan 2026 |
| Fire NOCFile: fire nocmergedcompressed.pdf | 12 Jan 2026 |
| CFE NOCFile: CFE_Sunworth_03072025.pdf | 12 Jan 2026 |
| MOEF NOCFile: Equinox MOEF 18 Feb 25_compressed.pdf | 12 Jan 2026 |
| Detailed Sanction PlanFile: Site Plan.pdf | 12 Jan 2026 |
| Certified survey sketchFile: Sketch.pdf | 12 Jan 2026 |
| Area Statement SignedFile: Area Statement Detail.pdf | 12 Jan 2026 |
| Demarcated PlanFile: Demarcated Plan.pdf | 12 Jan 2026 |
| Financials and Balance SheetFile: Financials 2425.pdf | 12 Jan 2026 |
| Proforma Agreement of SaleFile: ATS.pdf | 12 Jan 2026 |
| Village Map DemarcatedFile: Venkatapura Village Map Demarcted Survey Number.pdf | 12 Jan 2026 |
| CDP MapFile: CDP MAP 322 Kumbalagodu.JPG | 12 Jan 2026 |
| STP Design LocationFile: Demarcated Plan.pdf | 12 Jan 2026 |
| Project SpecificationsFile: Specifications.pdf | 12 Jan 2026 |
| Budget CostFile: Equinox-5, Signed Budget on 30-12-2025.pdf | 12 Jan 2026 |
| Basement PlanFile: Basement Floor Plan.pdf | 12 Jan 2026 |
| Elevation PlanFile: Elevation and Section Plan.pdf | 12 Jan 2026 |
| Stilt PlanFile: Stilt Floor Plan.pdf | 12 Jan 2026 |
| Terrace PlanFile: Terrace Floor Plan.pdf | 12 Jan 2026 |
| Plan ApprovalFile: Plan Approval letter.pdf | 12 Jan 2026 |
| RTC, survey 1 to 26 | - |
| Mutation, survey 1 to 26 | - |
| Encumbrance Certificate, survey 1 to 26 | - |
| Conversion/Alienation Order, survey 1 to 26 | - |
| Sale/Title/Gift Deed, survey 1 to 26 | - |
| Khatha, survey 1 to 26 | - |
| Registration CertificateFile: PHL COI.jpg | - |
| Memorandum of AssociationFile: MOA- Provident Housing- Final.pdf | - |
| Article of AssociationFile: AOA-Provident Housing.pdf | - |
| GST CertificateFile: GST Registration_PHL_KAR.pdf | - |
| Certificate issued by CA Form 1File: PROVIDENT EQUINOX 5 Form- 1 Registration.pdf | - |
| Certificate issued by Architect Form 2File: Equinox 5 ( A-F) - Architect Certificate dt 30-12-25.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: No Litigation Affidavit.pdf | - |
| Balance Sheet 2024 - 2025File: 24-25 balance Sheet.pdf | - |
| Balance Sheet 2023 - 2024File: Balance Sheet 23-24.pdf | - |
| Balance Sheet 2022 - 2023File: Balance Sheet 22-23.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: 24-25 Statement of P & L.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Statement of P&L 23-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Statement of P&L 22-23.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: ITR FY 24-25.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: 23-24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: 2022-23.pdf | - |
| Director's Report 2024 - 2025File: PHL Directors Report FY 2024-25 signed.pdf | - |
| Director's Report 2023 - 2024File: 22-23 PHL DR COM.pdf | - |
| Director's Report 2022 - 2023File: 22-23 PHL DR COM.pdf | - |
| Cash Flow Statement 2024 - 2025File: 24-25 Cash Flow.pdf | - |
| Cash Flow Statement 2023 - 2024File: Case Flow 23-24.pdf | - |
| Auditor's Report 2024 - 2025File: 24-25 Independent Auditors Report.pdf | - |
| Auditor's Report 2023 - 2024File: Independent AR 23-24.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Provident Equinox 1 | Venkatapura Village Kengeri Hobli Bangalore South | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Provident Equinox 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
JITO RANKA NAGAR
Essence Realty LLP
Provident Equinox 4
Provident Housing Limited
Provident Equinox 6
Provident Housing Limited
KOMMAGHATTA NPKL PHASE-1
Bangalore Development Authority
VBHC Haven of Joy
VBHC Mumbai Value Homes Pvt Ltd
Provident Equinox 3
Provident Housing Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Provident Housing Limited
Provident Housing Limited has 12 registrations on RERA Karnataka, including Provident Capella 1 and Provident Capella 2. Its filings declare 6 earlier projects, 6 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Provident Equinox 5 is delayed beyond 31 Mar 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Provident Equinox 5?
The registered promoter entity is Provident Housing Limited, a company as per the filing. Its CIN U45200KA2008PLC048273 and GSTIN 29AAECP8877D1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Provident Equinox 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Provident Equinox 5?
The professionals named in the filing: Architect: Venkataramanan Associates; Engineer: Dinesh Bellad; Chartered Accountant: Bhuvana Bhat and Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Provident Equinox 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.