Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2029Possession promisedno revision filed
3 of 14Construction stages donefurthest along: RCC or MS Framed structure, 95%
12 of 12Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 68 documents Report an error

PARK TERRACES is a Residential/Group Housing project by SHUBAM CONSTRUCTION in Davangere, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1258/404/PR/080525/007723 on 8 May 2025. Possession is promised by 31 Dec 2029. 0 of the 12 units on this registration are recorded sold or booked, and 3 of 14 construction stages are filed complete.

At a glance

Project

  • NamePARK TERRACES
  • TypeResidential/Group Housing
  • Location
    • Davanagere
    • Davangere
    • 577004
  • Pincode577004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1258/404/PR/080525/007723
  • ReraGenie IDRG-KA-43782

Builder

  • NameSHUBAM CONSTRUCTION
  • Entity typePartnership Firm
  • GSTIN29AELFS8971F1Z9
  • Authorized SignatoryMAHESH K.K
  • Other registrations1 more →

Key dates

this monthRegisteredMay 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 May 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

0%0 of 12 units booked
53.1%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARK TERRACES---12012

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 14 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 95%.

Building: 44% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)85%
Retaining wall (All types)Not applicable
RCC or MS Framed structure95%
Masonry Construction70%
Plastering inside , outside & Ceiling45%
Joinery: Doors, Windows, Ventilators etc15%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes0%
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes50%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes55%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,005 sq m
Named landowners1
LandownerVillageDistrict
SATHYASHREE S AMBERKER--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.65 cr
Cost incurredRs 2.47 cr
Spent of the estimate53.09%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 3.90 crRs 1.98 cr
Interest on borrowingsRs 60.00 lakhRs 40.03 lakh
On-site expenditure-Consultants FeesRs 10.00 lakhRs 7.73 lakh
Payment of taxesRs 2.85 lakhRs 1.16 lakh
On-site expenditure-Site OverheadRs 2.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHALINI SURESH
EngineerRASHMI SRIDHAR CHAKRAPANI
Chartered AccountantGAGAN NADIG

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed68

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1258/404/PR/080525/007723 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Shubam (Park).pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Architects Certificate -Park.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6-Park Terraces-15-10-26.pdf15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 Park_Terrace_Q1.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: ARCHITECT.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: engineer park.pdf15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 Park Terrace-Q4.pdf30 May 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: architect certificate.pdf30 May 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6-Park Terraces.pdf30 May 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: form 4 ca certificate - park Terraces - Q3.pdf31 Mar 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Q3 park.pdf31 Mar 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer park Q3.pdf31 Mar 2026
self-attested copy of renewed Engineer licenseFile: self attested engineer licence.pdf2 May 2025
estimated cost of construction certified by the EngineerFile: estimation cost by engineer.pdf2 May 2025
STP notificationFile: Goverment STP Order.pdf2 May 2025
UGD nocFile: UGD noc.pdf2 May 2025
clarification on single layout, village map, CDP planFile: clarification on village map single site.pdf2 May 2025
clarificationFile: clarification.pdf2 May 2025
Registration CertificateFile: firm registartion certiifcate.pdf-
GST CertificateFile: GST Certificate.pdf-
Partnership DeedFile: Partnership deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Park Terraces.pdf-
Certificate issued by Architect Form 2File: Arct-Certificate-Park Terraces.pdf-
Certificate issued by Engineer Form 3File: Engineer RERA Certificate_compressed.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Balance Sheet 2023 - 2024File: BS AY 2024-25.pdf-
Balance Sheet 2022 - 2023File: BS AY 2023-24.pdf-
Balance Sheet 2021 - 2022File: BS AY 2022-23.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR AY 2024-25.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR AY 2023-24.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR AY 2022-23.pdf-
building licence-
approved plan-
approved plan-
Stabilty park terrace-
specification-
proforma AOS-
proforma allottment letter-
form b-
affidavit 3(1)-
jda affidavit-
search report-
BESCOM NOC-
Park Terraces Water NOC_compressed-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
gift deed-rectification-
rectification JDA-
family tree-
CMC NOC-
clarification on village map-park terrace-
land calculation sheet-
carpet area statement-
Location map-

How this compares with Davangere

0%of this project is bookeddistrict median 14%
9%of Davangere projects moved their completion datethis one has not
0%of Davangere registrations are shown as withdrawn or revokedthis one is not

Computed across the 41 Davangere projects on ReraGenie, from their own filings.

Keep PARK TERRACES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Davangere41 in Davangere

2 kmPARK TERRACESOther 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: SHUBAM CONSTRUCTION

SHUBAM CONSTRUCTION has 2 registrations on RERA Karnataka, including PARK TERRACES and SHRADDHA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Davangere district page.

Frequently asked questions

What are my rights if PARK TERRACES is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PARK TERRACES?

The registered promoter entity is SHUBAM CONSTRUCTION, a partnership firm as per the filing. Its GSTIN 29AELFS8971F1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PARK TERRACES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PARK TERRACES?

The professionals named in the filing: Architect: SHALINI SURESH; Engineer: RASHMI SRIDHAR CHAKRAPANI; Chartered Accountant: GAGAN NADIG. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK TERRACES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK TERRACES. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK TERRACES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.