ReraGenieLog inGet a buyer report

Home / Browse projects / Davangere, Karnataka / A M SHANVIKA

Registration approved No litigation declared Residential/Group Housing project

A M SHANVIKA

By A M BUILDERS

RG-KA-61384 · RERA PRM/KA/RERA/1258/404/PR/240326/008546 · Last updated on RERA Karnataka portal: 14 Mar 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 73 documents Report an error

A M SHANVIKA is a Residential/Group Housing project by A M BUILDERS in Davangere, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1258/404/PR/240326/008546 on 24 Mar 2026. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameA M SHANVIKA
  • TypeResidential/Group Housing
  • Location
    • Davanagere
    • Davangere
    • 577004
  • Pincode577004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1258/404/PR/240326/008546
  • ReraGenie IDRG-KA-61384

Builder

  • NameA M BUILDERS
  • Entity typePartnership Firm
  • GSTIN29ABZFA0967E1ZX
  • Authorized SignatoryMahesh D M
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2026PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on24 Mar 2026
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AM SHANVIKA---20020
AM FORTUNE---20020

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 14 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,486 sq m
Named landowners4
LandownerVillageDistrict
A M Builders--
A M Builders--
Pradeep M Chandra--
Sunitha Hosangadi--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 6.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSrimathi J Adiga
EngineerPrashanth Kumar L
Chartered AccountantNarayana Rao M

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed73

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1258/404/PR/240326/008546 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Stability Certificate with engineer licenseFile: 1 Stability Certificate with engineer license.pdf14 Mar 2026
BESCOM declaration affidavit with NOCFile: 2 BESCOM declaration affidavit with NOC.pdf14 Mar 2026
STP Design Drawing -AM SHANVIKAFile: 3 STP Design Drawing -AM SHANVIKA.pdf14 Mar 2026
Clarification on QueriesFile: Clarification on Queries.pdf9 Mar 2026
Single Plot Layout plan & Order copyFile: 1 Single Plot Layout plan & Order copy.pdf9 Mar 2026
Building LicenseFile: 2 Building License.pdf9 Mar 2026
Approved Building PlanFile: 3 Approved Building Plan.pdf9 Mar 2026
Stability Certificate with Soil ReportFile: 4 Stability Certificate with Soil Report.pdf9 Mar 2026
BESCOM NOC with fee paid receiptFile: 5 BESCOM NOC with fee paid receipt.pdf9 Mar 2026
Estimation Summary Breakup Signed by EngineerFile: 6 Estimation Summary Breakup Signed by Engineer.pdf9 Mar 2026
STP Drawing with signatureFile: 7 STP Drawing with signature.pdf9 Mar 2026
Structural Engineer LicenseFile: 9 Structural Engineer License.pdf9 Mar 2026
Engineer License CopyFile: 10 Engineer License Copy.pdf9 Mar 2026
Registration CertificateFile: Registration Certificate.pdf-
GST CertificateFile: GST.pdf-
Partnership DeedFile: PARTNERSHIP DEED.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form 2 Arc Cert A M Shanvika.pdf-
Certificate issued by Engineer Form 3File: Form 3 Eng Cert - AM SHANVIKA.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit.pdf-
Balance Sheet 2024 - 2025File: AM builders P&L Balance sheet 24-25.pdf-
Balance Sheet 2023 - 2024File: AM builders PL and BS 2023-24.pdf-
Balance Sheet 2022 - 2023File: AM builders PL and BS 2022-23.pdf-
Audited Profit and Loss Statement 2024 - 2025File: AM builders P&L Balance sheet 24-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: AM builders PL and BS 2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: AM builders PL and BS 2022-23.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: AM BUILDERS ITR A Y 2025-26.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: AM builders PL and BS 2023-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: AM builders PL and BS 2022-23.pdf-
Building Approval letter-
Building Plan-
Building Plan-
Structural stability certificate with License-
Project Specifications-
Proforma Agreement of Sale-
Proforma Allotment Letter-
Form B Affidavit-
Sec 3(1) Affidavit-
JD Affidavit-
Legal opinion-
KEB noc with fees receipt-
Water NOC-
KSPCB NOC with fees Receipt-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
AM Fortune E Sathu 2024-
DC Office alination copy-
Gift deed - Pradeep M-
Gift Deed - Sunitha Hosangadi-
Kraya Patra dated 06-12-2003-
Krayapatra dated 2-12-1998-
Krayapatra dated 11-07-2002-
Krayapatra dated 23-04-2004-
AM FORTUNE GPA - 5150 B1 and 5150 B2-
CDP extract Fortune and Shanvika-
Abstract Estimation copy-
STP Drawing with engineer signature-
Door No Aadesha - Amalgamation-
Form 6 Eng Cert - A M Shanvika-
Land cost Calculation details-

How this compares with Davangere

9%of Davangere projects moved their completion datethis one has not
0%of Davangere registrations are shown as withdrawn or revokedthis one is not

Computed across the 41 Davangere projects on ReraGenie, from their own filings.

Keep A M SHANVIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Davangere41 in Davangere

2 kmA M SHANVIKAOther 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: A M BUILDERS

A M BUILDERS has 2 registrations on RERA Karnataka, including CASA LUXURIA and A M SHANVIKA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Davangere district page.

Frequently asked questions

What are my rights if A M SHANVIKA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of A M SHANVIKA?

The registered promoter entity is A M BUILDERS, a partnership firm as per the filing. Its GSTIN 29ABZFA0967E1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in A M SHANVIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at A M SHANVIKA?

The professionals named in the filing: Architect: Srimathi J Adiga; Engineer: Prashanth Kumar L; Chartered Accountant: Narayana Rao M. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in A M SHANVIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About A M SHANVIKA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save A M SHANVIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.