ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Rural, Karnataka / ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14

Registration approved Residential/Group Housing project

ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14

By SOBHA LIMITED

RG-KA-94387 · RERA PRM/KA/RERA/1250/304/PR/080526/008639

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jump to the 12 documents Report an error

ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/080526/008639 on 8 May 2026. Possession is promised by 31 Aug 2032.

At a glance

Project

  • NameONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 562114
  • Pincode562114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/080526/008639
  • ReraGenie IDRG-KA-94387

Builder

  • NameSOBHA LIMITED
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • GSTIN29AABCS7723E1ZB
  • Authorized SignatoryPAVITHRA G KALMAT
  • Managing DirectorMr Jagadish Nangineni
  • DirectorMr Jagadish Nangineni
  • Project HeadMr Praveen
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredMay 2026PromisedAug 2032

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 May 2026
  • Promised completion31 Aug 2032
  • Revised completionNone
  • Buildings3 building records
  • Documents filed12 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 12---2710271
Wing 13---2710271
Wing 14---1790179

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership20

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area33,122 sq m
Named landowners20
LandownerVillageDistrict
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--
Sobha Limited--

Certifying professionals and partners4

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetha K Nair
EngineerBalakrishnan G
EngineerMr. Ouseppachan C. Ambooken
Chartered AccountantBalaji D

Documents filed12

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/080526/008639 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Registration CertificateFile: Registration Certificate of SL.pdf-
Memorandum of AssociationFile: MOA SL.pdf-
Article of AssociationFile: AOA SL c.pdf-
GST CertificateFile: GST Certificate self attested.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Form-1 CA Ph6.pdf-
Certificate issued by Architect Form 2File: Form-2 Arc cert P6.pdf-
Certificate issued by Engineer Form 3File: Form-3 Ph6.pdf-
Project Chartered Accountant-
Project Engineer-
Project Engineer-
Project Architect-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

13 not delivered by the promised date36 under way, not due yet
ProjectLocationStatusPromisedDelivered
SOBHA Crystal Meadows Phase 5 Wing 16 to 22 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKAOngoingDec 2035Not due yet
SOBHA Crystal Meadows Phase 4 Wing 23 to 28 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2033Not due yet
Sobha Hamptons -Townpark Phase 2 W1 to 3 LitigationPROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingJun 2033Not due yet
SOBHA Crystal Meadows Phase 3 Wing 9 to 15 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2032Not due yet
Sobha Madison Heights-Townpark Phase 2 W1 to 4 LitigationPROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingDec 2031Not due yet
SOBHA Ayana at Dream Acres Wing 60 to 71 LitigationSy No 50/2, 50/4, 50/5, 50/6, 51/1,51/2B1, 51/2B2, 51/3,51/4, 51/2C1,51/2C2, 53/1 and 53/2 of BalagereVillage , Ward No 149 , Varthur Hobli ,Bengaluru East , Bengaluru Urban,Karnataka - 560087OngoingDec 2031Not due yet
SOBHA Crystal Meadows Phase 2 Wing 7 and 8 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingJun 2031Not due yet
Sobha Altair"SOBHA ALTAIR, SY NO 56, HADOSIDDAPURA VILLAGE, CHIKKANNELLI VILLAGE VARTHUR HOBLI, BENGALURU EAST TALUK, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560035"OngoingMay 2031Not due yet
Sobha Neopolis Phase 2 - W 12 & 13 Litigation"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2030Not due yet
Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 LitigationSurvey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034OngoingDec 2030Not due yet
Sobha Infinia Phase 2A Block 5 Wing 5 LitigationSurvey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034OngoingJun 2030Not due yet
Sobha Hamptons -Townpark Phase 1 W4 to 6 LitigationPROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingJun 2030Not due yet
Sobha Magnus"E-KATHA NO.7863600645, SY.NO. 87/2, 87/3 SITUATED AT KOTHANUR VILLAGE , UTTARAHALLI HOBLI , Bengaluru South , Bengaluru Urban, Karnataka "OngoingMay 2030Not due yet
Sobha Neopolis Phase 3 - W 1, 2, 10 & 11 Litigation"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2029Not due yet
SOBHA Crystal Meadows Phase 1 Wing 1 to 6 LitigationSURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2029Not due yet
Sobha Brooklyn Towers - Town Park Phase 3, W5 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2029Not due yet
Sobha Royal crest Litigation"PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE"OngoingDec 2028Not due yet
Sobha Royal Pavilion Phase 5 - Wing 8 and 9 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18&19 Litigation"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2028Not due yet
Sobha Dream Gardens Phase 5 - Wing 10 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Dream Gardens Phase 4 - Wing 1 and 2 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Brooklyn Towers - Town Park Phase 5, W3 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2028Not due yet
Sobha Windsor Phase 4 Wing 9, 10 and 11 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingMar 2028Not due yet
Sobha Victoria park phase 2 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Victoria park phase 1 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Sentosa Phase 4 Wing 1 and 2 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingDec 2027Not due yet
Sobha Oakshire Phase 3 Wing 5,6,11 and 12 LitigationProposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingDec 2027Not due yet
Sobha Dream Gardens Phase 3 - Wing 3 and 4 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 2, W2 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 1, W1 LitigationSy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Windsor Phase 3 Wing 6, 7 and 8 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingSep 2027Not due yet
Sobha City AthenaProperty No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, BengaluruOngoingSep 2027Not due yet
Sobha Sentosa Phase 3 Wing 3 and 4 Litigation"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingJun 2027Not due yet
Sobha Oakshire Phase 2 Wing 3,4,9 and 10 LitigationProposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingJun 2027Not due yet
Sobha Oakshire Phase 1 Wing 1,2,7 and 8 LitigationProposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingDec 2026Not due yet
Sobha Galera Litigation"SOBHA GALERA, SURVEY NO 45/4 OF HUSKUR VILLAGE, BIDARAHALLI HOBLI, BANGLAORE EAST TALUK SURVEY NO.116 OF AMANIDODDAKERE VILLAGE, KASABA HOBLI, HOSAKOTE TALUK, BANGALORE , BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560049"OngoingDec 2026Not due yet
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 LitigationBalagere, BangaloreOngoingSep 2026Not delivered
Sobha Royal Pavilion Phase 8 - Wing 15 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 6 - Wing 10 and 11 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 5 - Wing 8 and 9 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmONE RESIDENCES AT SOBHA Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: SOBHA LIMITED

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14 is delayed beyond 31 Aug 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14?

The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14?

The professionals named in the filing: Architect: Geetha K Nair; Engineer: Balakrishnan G; Engineer: Mr. Ouseppachan C. Ambooken; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.