Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
OM MALLIKARJUNA is a Residential/Group Housing project by SHIV OM ENTERPRISES in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/220623/006006 on 22 Jun 2023. Possession is promised by 31 Mar 2026.
At a glance
Project
- NameOM MALLIKARJUNA
- TypeResidential/Group Housing
- Location
- Belagavi
- PincodeNot stated
- RERA no.PRM/KA/RERA/1249/447/PR/220623/006006
- ReraGenie IDRG-KA-67588
Builder
- NameSHIV OM ENTERPRISES
- Entity typePartnership Firm
- GSTIN29ACYFS4363A1ZO
- Authorized SignatoryKULDEEP OMPRAKASH JAIN
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Jun 2023
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| OM MALLIKARJUNA | - | - | - | 19 | 0 | 19 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 3 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 3 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| GURULINGAPPA MALLIKARJUN PATTANSHETTI | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 2.97 cr | - |
| On-site expenditure-Consultants Fees | Rs 3.40 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. KULDEEP BANDU MORE |
| Engineer | Er. VINAY BEHERE |
| Chartered Accountant | PARAG HERWADKAR (P.C PATIL & ASSOCIATES) |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed73
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/220623/006006 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| approved building permissionFile: Approved Sectional Drawing Copy.pdf | 3 Jun 2023 |
| Declaration for allotment of the car parkingFile: letter of undertaking for car parking.jpeg | 3 Jun 2023 |
| about car parking number in project details pageFile: About Car parking number.pdf | 3 Jun 2023 |
| profit and loss account and balance sheet, 2019-20 with CA UDIN along with scheduleFile: P & L, Balance sheet 2019-20 with CA UDIN and schedule.pdf | 8 May 2023 |
| profit and loss account and balance sheet, 2020-21 with CA UDIN along with scheduleFile: P & L, Balance sheet 20-21 with CA UDIN and schedule.pdf | 8 May 2023 |
| profit and loss account and balance sheet 2021-22 with CA UDIN along with scheduleFile: P & L, Balance sheet 21-22with CA UDIN and schedule.pdf | 8 May 2023 |
| EC from 01-04-2005 to upto dateFile: New EC 2005 to 2023 -Om Mallikarjuna-.pdf | 8 May 2023 |
| about car parking numberFile: About Car parking number.pdf | 8 May 2023 |
| clarification about start date of the projectFile: about start date of project.pdf | 8 May 2023 |
| about plinth level certificateFile: about plinth level certificate.pdf | 8 May 2023 |
| Notice replyFile: Reply to Notice.pdf | 8 May 2023 |
| Upload profit and loss account and balance sheet, 2019-20 ,2020-21 & 2021-22 with CA UDIN along witFile: CA Declration P&L BSheet.pdf | 20 Feb 2023 |
| need EC from 01-04-2005 to upto dateFile: Latest EC.pdf | 20 Feb 2023 |
| Upload certified Carpet area calculation.File: Certified Carpet Area Calculation Final.pdf | 20 Feb 2023 |
| Upload KSPCB CFEFile: Declaration of KSPCB NOC.pdf | 20 Feb 2023 |
| Upload the Amalgamation DrawingFile: Declaration of Amalgamation Copy.pdf | 20 Feb 2023 |
| Please upload the NOC issued by Power supplyFile: HESCOM NOC & Fee Receipt.pdf | 20 Feb 2023 |
| water supply along with the copy of fee receipt paid towards NOC.File: KUWSMP NOC & Declaration of Fee Paid Receipt.pdf | 20 Feb 2023 |
| Registration CertificateFile: Firm Registration Copy.pdf | - |
| Partnership DeedFile: Parnership Deed Copy.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: CA RERA Certificate_Shiv Om Enterprises.pdf | - |
| Certificate issued by Architect Form 2File: Architect Form No-2.pdf | - |
| Certificate issued by Engineer Form 3File: Engineer_s Form No-3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non-Litigation.pdf | - |
| Certificate from Chartered AccountFile: CA RERA Certificate_Shiv Om Enterprises.pdf | - |
| Balance Sheet 2021 - 2022File: Bsheet_FY 21-22_Shiv Om Enterprises.pdf | - |
| Balance Sheet 2020 - 2021File: BS_FY 20-21_Shiv om Enterprises.pdf | - |
| Balance Sheet 2019 - 2020File: Balance Sheet 19-20.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: P_L_FY 21-22_Shiv Om Enterprises.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: PL_FY 20-21_Shiv om Enterprises.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: ITR 19-20.pdf | - |
| Building Commencement Copy | - |
| Approved Sectional Drawing Copy | - |
| Approved Sectional Drawing Copy | - |
| Sectional Drawing Copy | - |
| Project Specification Copy | - |
| Approved Sectional Drawing Copy | - |
| Stability certificate | - |
| Advocate Search Report Copy | - |
| JDA Copy | - |
| Declaration of DC Conversion | - |
| Sale Deed Copy to Pattanshetti | - |
| Agreement of Sale Proforma Om Mallikarjuna PDF | - |
| ALLOTMENT LETTER OM MALLIKARJUNA | - |
| Form No-B | - |
| Section 3_1 Non Violation | - |
| JD Cum Affidavit | - |
| GPA Copy | - |
| Location Demarcation Copy | - |
| STP Demarcation PDF | - |
| SR Guidence Value Certified Copy | - |
| Self Declaration of RTC,MR | - |
| Self Declaration of Single Plot | - |
| Self Declration of Commencement Certificate | - |
| Brief Estimation Cost | - |
| CDP Extract Plan Om Mallikarjuna | - |
| CTS Exrract Map Copy | - |
| Prospectus/BrochureFile: Project Brochure Om Mallikarjuna.jpg | - |
| Advertisement Copy 1File: Project Brochure Om Mallikarjuna.jpg | - |
| Stability CertificateFile: Stability certificate .pdf | - |
| Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift NOC.pdf | - |
| Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: TC Sanction Letter.pdf | - |
| Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: KUWSMP NOC.pdf | - |
| Architect certificate for having completed the work(in format no 5)File: FORM NO - 05.pdf | - |
| Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: AFFIDAVIT CUM DECLARATION_0001.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep OM MALLIKARJUNA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: SHIV OM ENTERPRISES
SHIV OM ENTERPRISES has 1 registration on RERA Karnataka, including OM MALLIKARJUNA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if OM MALLIKARJUNA is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of OM MALLIKARJUNA?
The registered promoter entity is SHIV OM ENTERPRISES, a partnership firm as per the filing. Its GSTIN 29ACYFS4363A1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in OM MALLIKARJUNA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at OM MALLIKARJUNA?
The professionals named in the filing: Architect: Ar. KULDEEP BANDU MORE; Engineer: Er. VINAY BEHERE; Chartered Accountant: PARAG HERWADKAR (P.C PATIL & ASSOCIATES). Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OM MALLIKARJUNA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback