Home / Browse projects / Bengaluru Urban, Karnataka / Oceanus White Meadows
Oceanus White Meadows
RG-KA-84568 · RERA PRM/KA/RERA/1251/310/PR/270623/006023 · Last updated on RERA Karnataka portal: 18 Feb 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Oceanus White Meadows is a Residential/Group Housing project by Oceanus Dwellings Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/270623/006023 on 27 Jun 2023. Possession is promised by 31 Dec 2028. 89 of the 135 units on this registration are recorded sold or booked, and 3 of 17 construction stages are filed complete.
At a glance
Project
- NameOceanus White Meadows
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560083
- Pincode560083
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/270623/006023
- ReraGenie IDRG-KA-84568
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on27 Jun 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed97 files
Current status
Figures as on 18 Feb 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Oceanus White Meadows | - | - | - | 135 | 0 | 135 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 18 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 17 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 90%.
Building: 55% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 90% |
| Retaining wall (All types) | 90% |
| RCC or MS Framed structure | 90% |
| Masonry Construction | 90% |
| Plastering inside , outside & Ceiling | 90% |
| Joinery: Doors, Windows, Ventilators etc | 60% |
| Basic work of Water supply, Sanitary and Electrification | 60% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 60% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 18 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 45% |
| Sewage and Drainage System | Yes | 15% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 45% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 56% |
| Lifts | Yes | 52% |
| Corridor/Lobbies | Yes | 50% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 100% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| J P M Hospitalities Pvt ltd | - | - |
| Oceanus Dwellings Pvt. Ltd | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 34.79 cr | Rs 21.18 cr |
| On-site expenditure-Site Overhead | Rs 1.75 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.27 cr | Rs 2.59 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VS Shrinivas |
| Engineer | Lakshmi Keshava |
| Chartered Accountant | Padmanabha Bhat |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed97
As listed on the registration, under the names the promoter filed them with; the newest 80 of 97 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/270623/006023 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 White Meadows - Dec 25.pdf | 18 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 White Meadows - Dec 25.pdf | 18 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 White Meadows - Dec 25.pdf | 18 Feb 2026 |
| Area StatementFile: 1 Area Statement.pdf | 23 Jun 2023 |
| SIAAC - Clarification letterFile: 2 SIAAC - Clarification letter.pdf | 23 Jun 2023 |
| KSPCB - Clarification letterFile: 3 KSPCB - Clarification letter.pdf | 23 Jun 2023 |
| Commencement Certificate - Clarification letterFile: 4 Commencement Certificate - Clarification letter.pdf | 23 Jun 2023 |
| Clarification on Single layout Map and OrderFile: 5 Clarification on Single layout Map and Order.pdf | 23 Jun 2023 |
| RTC, survey 21-2 | - |
| Mutation, survey 21-2 | - |
| Encumbrance Certificate, survey 21-2 | - |
| Conversion/Alienation Order, survey 21-2 | - |
| Sale/Title/Gift Deed, survey 21-2 | - |
| JDA, survey 21-2 | - |
| Khatha, survey 21-2 | - |
| RTC, survey 21-2 | - |
| Mutation, survey 21-2 | - |
| Encumbrance Certificate, survey 21-2 | - |
| Conversion/Alienation Order, survey 21-2 | - |
| Sale/Title/Gift Deed, survey 21-2 | - |
| Khatha, survey 21-2 | - |
| Registration CertificateFile: Company Incorporation Letter.pdf | - |
| Organization StructureFile: Organisation Chart.pdf | - |
| Certificate issued by CA Form 1File: Form-1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form-2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form-3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non-Litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form-1 CA Certificate.pdf | - |
| Balance Sheet 2021 - 2022File: balance sheet 21-22 with schedules.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet - 2020-21.pdf | - |
| Balance Sheet 2019 - 2020File: Balance Sheet 2019-20.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: profit and loss 21-22 with schedules.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: P & L - 2020-21.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: P & L 2019-20.pdf | - |
| Director's Report 2021 - 2022File: director report 2021-22.pdf | - |
| Director's Report 2020 - 2021File: Directors Report 2020-21.pdf | - |
| Director's Report 2019 - 2020File: Directors Report 2019-20.pdf | - |
| Cash Flow Statement 2021 - 2022File: Cash Flow FY 2021-22.pdf | - |
| Cash Flow Statement 2020 - 2021File: Cash Flow - 2020-21.pdf | - |
| Auditor's Report 2021 - 2022File: auditor report FY 2021-22.pdf | - |
| Auditor's Report 2020 - 2021File: auditor report ODPL 2020-21.pdf | - |
| Auditor's Report 2019 - 2020File: ODPL AUDIT REPORT-2019-20.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: IT computation and acknowledgement signed by CS - 2020-21.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: IT computaion and acknowledge 2019-20.pdf | - |
| BBMP License | - |
| BESCOM NOC with fee paid receipt | - |
| BWSSB NOC with fee paid receipt | - |
| BBMP Approved Plan | - |
| BBMP Approved Plan | - |
| BBMP Approved Plan | - |
| Project Specification | - |
| BBMP Approved Plan | - |
| Project Specification | - |
| BBMP Approved Plan | - |
| Structural stability certifcate | - |
| Search report | - |
| JDA and GPA | - |
| Title Deed | - |
| Proforma Agreement of Sale | - |
| Proforma Allotment Letter | - |
| Form B Affidavit | - |
| Sec 3(1) Non-Violation | - |
| JDA Affidavit | - |
| BESCOM NOC with fee paid receipt | - |
| BWSSB NOC with fee paid receipt | - |
| Unnamed document | - |
| Unnamed document | - |
| Fire NOC | - |
| HAL NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| BSNL NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Oceanus White Meadows on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 21 registered projects within 2 km.
Godrej Vanantara
GODREJ IRISMARK PRIVATE LIMITED
CASAGRAND HAZEN
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
GRC SAPPHIRE SPRING - PHASE -1
GRC Infra Pvt. Ltd.
COURTYARD BY VEDANTH SURAKSHA
VEDANTH SURAKSHA PROPERTIES
GRC SAPPHIRE SPRING PHASE II
GRC Infra Private Limited
PLATINUM GREENFIELDS
SAI PROPERTIES
See every Bengaluru Urban project, with the district possession charts
Builder: Oceanus Dwellings Pvt Ltd
Oceanus Dwellings Pvt Ltd has 4 registrations on RERA Karnataka, including Oceanus White Meadows and Oceanus Classic. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Oceanus White Meadows is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Oceanus White Meadows?
The registered promoter entity is Oceanus Dwellings Pvt Ltd, a company as per the filing. Its CIN U07010KA2003PTC031632 and GSTIN 29AAACO6011G1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Oceanus White Meadows?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Oceanus White Meadows?
The professionals named in the filing: Architect: VS Shrinivas; Engineer: Lakshmi Keshava; Chartered Accountant: Padmanabha Bhat. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Oceanus White Meadows?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback