Home / Browse projects / Bengaluru Urban, Karnataka / NEELADRI SAROVARAM

Registration approved No litigation declared Residential/Group Housing project

NEELADRI SAROVARAM

By NEELADRI PROPERTIES

RG-KA-65802 · RERA PRM/KA/RERA/1251/446/PR/250222/004732 · Last updated on RERA Karnataka portal: 12 Feb 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 115 documents Report an error

NEELADRI SAROVARAM is a Residential/Group Housing project by NEELADRI PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/250222/004732 on 25 Feb 2022. Possession is promised by 31 Oct 2026.

At a glance

Project

  • NameNEELADRI SAROVARAM
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560087
  • Pincode560087
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/250222/004732
  • ReraGenie IDRG-KA-65802

Builder

  • NameNEELADRI PROPERTIES
  • Entity typePartnership Firm
  • GSTIN29AAIFN8689E1ZK
  • Authorized SignatoryT BHADRACHALAM
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2022PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 Feb 2022
  • Promised completion31 Oct 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed115 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BLOCK---1630163
B BLOCK---1580158

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 12 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 12 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,953 sq m
Named landowners4
LandownerVillageDistrict
NEELADRI PROPERTIES--
NEELADRI PROPERTIES--
NEELADRI PROPERTIES--
NEELADRI PROPERTIES--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 111.12 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 89.26 cr-
land costRs 21.86 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV.SIVA KUMAR
EngineerSRINIVAS RAO BOLIMUNTA
Chartered AccountantC VENKATESULU

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed115

As listed on the registration, under the names the promoter filed them with; the newest 80 of 115 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/250222/004732 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PRM/KA/RERA/1251/310/PR/180120/002173 Quarterly details are UPDATEDFile: Quarterly Update Details.pdf12 Feb 2022
Cost details are UPDATEDFile: Estimation of Project completion.pdf12 Feb 2022
NOC Affidavit and Applied Acknowledge issued by BESCOM is UPLOADED.File: Bescom ACK 1 .pdf12 Feb 2022
1)PRM/KA/RERA/1251/310/PR/180120/002173 it is completed project,&handedover to customers, OC attchedFile: OC .pdf10 Jan 2022
2) Estimated cost of Construction should be certified by EngineerFile: NEELADRI Kotahills Estimation.pdf10 Jan 2022
3) Chartered Accountant Certificate for Mortgage and Total cost of the projectFile: CA Certificate.pdf10 Jan 2022
4) CA UDIN is mandatory from 01.04.2019 so for 2018-19 not applicable and 2019-20 attached UDIN NoFile: BS 2020-upload.pdf10 Jan 2022
5) Audited Balance sheet & Profit and Loss account for the year 2020-21File: BS 2021-Final Upload.pdf10 Jan 2022
2.1) RTC for Sy No 8/2File: 8-2 RTC.pdf10 Jan 2022
RTC for sy no 8/3File: RTC 8-3.pdf10 Jan 2022
RTC for Sy no 8/4File: 8-4 RTC.pdf10 Jan 2022
RTC For Sy 7/2File: 7-2 RTC.pdf10 Jan 2022
2.2) Certified copy of Guidance Value detailed obtained by Sub RegistrarFile: Guidance value Certified Final.pdf10 Jan 2022
3) Non Litigation Affidavit respect to Schedule Project NEELADRI SAROVARAMFile: Non Litigation affidavit.pdf10 Jan 2022
3.1) Cost of Land + Estimated cost of construction = 218590009+892591584 = 1111181593File: cost details upload-Final .pdf10 Jan 2022
3.2) Total Open Area = 6748 and covered area 6205 Total area of Land is =12953File: Area Statement FINAL .pdf10 Jan 2022
3.3) Total covered area 6205 as per drawingFile: Area Statement FINAL .pdf10 Jan 2022
4) common area details to be alloted to Association for A BlockFile: NEELADRI SAROVARAM A BLOCK.xlsx10 Jan 2022
4) common area details to be alloted to Association for B BlockFile: NEELADRI SAROVARAM B BLOCK.xlsx10 Jan 2022
5) Authorised sign copy of Specification DetailsFile: Specifications of Neeladri .pdf10 Jan 2022
6) Proforma of Sale Agreement draftFile: Agt .pdf10 Jan 2022
7) Proforma of Sale Deed DraftFile: Sale deed .pdf10 Jan 2022
Provision of STP clarified by Promoter and along with DrawingsFile: STP Drawing.pdf10 Jan 2022
Brochure of the ProjectFile: Brouchure.pdf10 Jan 2022
NOC from BESCOmFile: BESCOM.pdf10 Jan 2022
Audited Report for the year 2020-21File: Neeladri-3CB and 3CD.pdf10 Jan 2022
RTC, survey 8/2-
Mutation, survey 8/2-
Encumbrance Certificate, survey 8/2-
Conversion/Alienation Order, survey 8/2-
Sale/Title/Gift Deed, survey 8/2-
Khatha, survey 8/2-
RTC, survey 8/3-
Mutation, survey 8/3-
Encumbrance Certificate, survey 8/3-
Conversion/Alienation Order, survey 8/3-
Sale/Title/Gift Deed, survey 8/3-
Khatha, survey 8/3-
RTC, survey 8/4-
Mutation, survey 8/4-
Encumbrance Certificate, survey 8/4-
Conversion/Alienation Order, survey 8/4-
Sale/Title/Gift Deed, survey 8/4-
Khatha, survey 8/4-
RTC, survey 7/2-
Mutation, survey 7/2-
Encumbrance Certificate, survey 7/2-
Conversion/Alienation Order, survey 7/2-
Sale/Title/Gift Deed, survey 7/2-
Khatha, survey 7/2-
Registration CertificateFile: Registrar of Firm.pdf-
Partnership DeedFile: Partnership Deed F.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by Architect Form 2File: Estimation of Project completion.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation affidavit.pdf-
Balance Sheet 2020 - 2021File: Balance sheet 2020-21.pdf-
Balance Sheet 2019 - 2020File: BS 2019 .pdf-
Balance Sheet 2018 - 2019File: Balance Sheet 2018-19.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P&L 20-21 .pdf-
Audited Profit and Loss Statement 2019 - 2020File: P& L 2019 .pdf-
Audited Profit and Loss Statement 2018 - 2019File: P&L 2018-19.pdf-
Director's Report 2020 - 2021File: 2020 .pdf-
Director's Report 2019 - 2020File: 2019.pdf-
Director's Report 2018 - 2019File: 2018.pdf-
Cash Flow Statement 2020 - 2021File: CF 2020.pdf-
Cash Flow Statement 2019 - 2020File: cf 2019.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
NEELADRI KOTAHILLSNO 16/5 TURAHALLI VILLAGE UTTARAHALLI HOBLI BANGALORECompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep NEELADRI SAROVARAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmNEELADRI SAROVARAMOther 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: NEELADRI PROPERTIES

Neeladri Properties has 2 registrations on RERA Karnataka, including Neeladri Kota Hills and NEELADRI SAROVARAM. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if NEELADRI SAROVARAM is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of NEELADRI SAROVARAM?

The registered promoter entity is NEELADRI PROPERTIES, a partnership firm as per the filing. Its GSTIN 29AAIFN8689E1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in NEELADRI SAROVARAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NEELADRI SAROVARAM?

The professionals named in the filing: Architect: V.SIVA KUMAR; Engineer: SRINIVAS RAO BOLIMUNTA; Chartered Accountant: C VENKATESULU. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELADRI SAROVARAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELADRI SAROVARAM. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELADRI SAROVARAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.