Navami Chamara Heights
RG-KA-99926 · RERA PRM/KA/RERA/1251/309/PR/060324/006678 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Navami Chamara Heights is a Residential/Group Housing project by Navami Chamara Heights in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/060324/006678 on 6 Mar 2024. Possession is promised by 30 Jun 2028. 204 of the 231 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete.
At a glance
Project
- NameNavami Chamara Heights
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560056
- Pincode560056
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/060324/006678
- ReraGenie IDRG-KA-99926
Builder
- NameNavami Chamara Heights
- Entity typePartnership Firm
- GSTIN29AAVFN0937C1Z0
- Authorized SignatoryRavi.D
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Mar 2024
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings2 building records
- Documents filed157 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 165 | 0 | 165 |
| Tower B | - | - | - | 162 | 0 | 162 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 95%.
Building: 43% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 95% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| RCC or MS Framed structure | 50% |
| Masonry construction: Bricks, Concrete blocks etc | 50% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 40% |
| Railing and Grill fixing | 40% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 50% |
| Weather Proof work(tile,concrete) | 44% |
| Painting | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per santioned drawings | 0% |
Progress on shared amenities41
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | 60% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Water conservation | No | Not applicable |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 30% |
| Electricity | Yes | 0% |
| Smart Home Automation | Yes | 0% |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas and common storage spaces | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
Land and ownership14
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MR. A.C. CHANDRASHEKAR RAJU | - | - |
| MR. A.C. SRINIVAS RAJU | - | - |
| MR. A.C. KRISHNA RAJU, | - | - |
| MRS. KALYANI K. RAJU | - | - |
| MR. ARJUN K. RAJU | - | - |
| MRS. YESHODA CHANDRASHEKAR RAJU | - | - |
| MRS. TANISHA UMESH RAJU | - | - |
| MRS. AKILA CHINTALAPATI RAJU | - | - |
| MRS. CHANDNI C RAJU | - | - |
| MR. TEJAS C RAJU | - | - |
| MRS. SUBHADRA SRINIVAS RAJU | - | - |
| MRS. MANTHENA ADITHI VERMA | - | - |
| MRS. AKANKSHA SRINIVAS RAJU | - | - |
| MRS. AISHWARYA SRINIVAS RAJU | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 139.07 cr | Rs 51.20 cr |
| Payment of taxes | Rs 15.00 cr | Rs 8.16 cr |
| On-site expenditure-Site Overhead | Rs 12.30 cr | Rs 5.28 cr |
| On-site expenditure-Salaries of workers | Rs 10.00 cr | Rs 7.39 cr |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 3.00 cr | Rs 1.24 cr |
| On-site expenditure-Consultants Fees | Rs 2.00 cr | Rs 1.75 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ashok Y N |
| Engineer | Manohar.N |
| Chartered Accountant | H.Shivakumar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed157
As listed on the registration, under the names the promoter filed them with; the newest 80 of 157 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/060324/006678 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: NCH Form 4 Chartered Accountant QU2 FY202627.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: NCH Form 5 Architects Certificate Signature QU2 FY202627.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: NCH Form 6 Engineering Certificate Signature QU2 FY202627.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: NCH Form 4 Chartered Accountant QU4 FY202526.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: NCH Form 5 Architects Certificate Signature QU4 FY202526.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: NCH Form 6 Engineering Certificate Signature QU4 FY202526.pdf | 15 Jul 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Jul 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Jul 2026 |
| Q4 2025-26 Fire and Safety | 15 Jul 2026 |
| Q4 2025-26 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: NCH Form 4 Chartered Accountant QU1 FY202627.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: NCH Form 5 Architects Certificate Signature QU1 FY202627.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: NCH Form 6 Engineering Certificate Signature QU1 FY202627.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Source of Funds with supporting documentsFile: 1 Source of Funds with supporting documents.pdf | 5 May 2026 |
| Approved Modified PlanFile: 3 Approved Modified Plan.pdf | 5 May 2026 |
| Modified Plan LicenceFile: 4 Modified Plan Licence.pdf | 5 May 2026 |
| Structural stability certificate with LisenceFile: 5 Structural stability certificate with Lisence.pdf | 5 May 2026 |
| Affidavit cum Declaration BESCOM NOCFile: 7 Affidavit cum Declaration BESCOM NOC.pdf | 5 May 2026 |
| Query ReplyFile: Query Reply.pdf | 5 May 2026 |
| EC form 2004 to Till dateFile: 1 EC form 2004 to Till date.pdf | 29 Feb 2024 |
| & 3rd query - Single plot declarationFile: 2 Single plot declaration.pdf | 29 Feb 2024 |
| KSPCB CFE noc applicationFile: 4 KSPCB CFE noc application.pdf | 29 Feb 2024 |
| Commencement certificate declarationFile: 5 Commen certifi declaration.pdf | 29 Feb 2024 |
| S of Fund with Group AdditionalFile: 6 S of F with Group Additional.pdf | 29 Feb 2024 |
| Bank StatementFile: 7 Bank Statements.pdf | 29 Feb 2024 |
| Bank Letter FinnaceFile: 2 Bank Letter Finnace.pdf | 16 Feb 2024 |
| SOF with Supporting documentFile: 3 SOF with Supporting document.pdf | 16 Feb 2024 |
| RTC Till dateFile: RTC Till date.pdf | 16 Feb 2024 |
| Carpet Area Caluclation CertifiedFile: 9 Carpet Area Caluclation Certified.pdf | 16 Feb 2024 |
| CDP PlanFile: 10 CDP Plan.pdf | 16 Feb 2024 |
| Village MapFile: 11 Village Map.pdf | 16 Feb 2024 |
| KSPCB CFEFile: 12 KSPCB CFE.pdf | 16 Feb 2024 |
| Digitally Signed Sanctioned DrawingsFile: 15 Digitally Signed Sanctioned Drawings.PDF | 16 Feb 2024 |
| FAR Certificate from ArchitectureFile: FAR Certificate from Architecture.pdf | 16 Feb 2024 |
| NCH Single plot layout plan and orderFile: NCH Single plot layout plan and order.pdf | 16 Feb 2024 |
| Type of Inventories area to updateFile: Type of Inventories area to update.pdf | 16 Feb 2024 |
| RTC, survey 130 | - |
| Mutation, survey 130 | - |
| Encumbrance Certificate, survey 130 | - |
| Conversion/Alienation Order, survey 130 | - |
| Sale/Title/Gift Deed, survey 130 | - |
| JDA, survey 130 | - |
| Khatha, survey 130 | - |
| Registration CertificateFile: Annexure 1 Registration Certificate.pdf | - |
| Partnership DeedFile: Annexure 17 Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: RERA Form-1 Chartered Accountant.pdf | - |
| Certificate issued by Architect Form 2File: RERA Form-2 Architects.pdf | - |
| Certificate issued by Engineer Form 3File: RERA Form-3 Engineer.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non-Litigation - Affidavit.pdf | - |
| Certificate from Chartered AccountFile: CACertifcateforApprovalIncured.pdf | - |
| Balance Sheet 2022 - 2023File: Provisional B S.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Annexure 61 Profit & Loss Provisional.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: Annexure 65 IT Ack NA.pdf | - |
| Annexure 67 BBMP Licence | - |
| Annexure 68 BESCOM NOC | - |
| Annexure 69 BWSSB NOC | - |
| Annexure 71 Approved BuildingPlotting Plan | - |
| Annexure 71 Approved BuildingPlotting Plan | - |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Navami Landmaark | Site Add:-#43/13 & 14/1, Sy.No. 13 & 14/1, Kenchenahalli Village, Kengeri Hobli, Mysore road, | Ongoing | Aug 2024 | Not delivered |
| Navami Vruksha | No.54, New BDA, No.27/A, Industrial Subrab, Yeshwanthapur, Rajajinagar | Completed | - | No date filed |
| Navami Symphony | No.26-33, Halagevaderahalli Village,Rajarajeshwarinagar, Bangalore - 98. | Completed | - | No date filed |
| Navami Funique | No.374/42/4 to 9 & 11, Chikkathoguru Village, Hosa Road Junction, Bommannahalli Sub Division, Hosur Road | Completed | - | No date filed |
| MN Orchid | No.32/52/2, Ananthapur Village, Yelahanka Hobli | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Navami Chamara Heights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 8 registered projects within 2 km.
Sobha Dream Gardens Phase 3 - Wing 3 and 4
SOBHA LIMITED
Sobha Dream Gardens Phase 4 - Wing 1 and 2
SOBHA LIMITED
Sobha Dream Gardens Phase 5 - Wing 10
SOBHA LIMITED
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Navami Chamara Heights
Navami Chamara Heights has 1 registration on RERA Karnataka, including Navami Chamara Heights. Its filings declare 5 earlier projects, 4 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Navami Chamara Heights is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Navami Chamara Heights?
The registered promoter entity is Navami Chamara Heights, a partnership firm as per the filing. Its GSTIN 29AAVFN0937C1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Navami Chamara Heights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Navami Chamara Heights?
The professionals named in the filing: Architect: Ashok Y N; Engineer: Manohar.N; Chartered Accountant: H.Shivakumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Navami Chamara Heights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback