Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2023Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 55 documents Report an error

MULTIPLEX is a Commercial project by GREENZONE INFRASTRUCTURE DEVELOPERS PVT LTD in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/180504/001597 on 4 May 2018. Possession is promised by 20 Sep 2023. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameMULTIPLEX
  • TypeCommercial
  • Location
    • Belagavi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1249/447/PR/180504/001597
  • ReraGenie IDRG-KA-58292

Builder

  • NameGREENZONE INFRASTRUCTURE DEVELOPERS PVT LTD
  • Entity typeCompany
  • CINU45204KA2011PTC056949
  • Authorized SignatorySHIVAPUTRA MAHADEV DABB

Key dates

this monthRegisteredMay 2018First promiseDec 2022Revised toSep 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 May 2018
  • Promised completion20 Sep 2023
  • Revised completionRevised to 20 Sep 2023 (originally 20 Dec 2022)
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Multiplex---044

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,145 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 9.72 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAM GUNDU VARALE
EngineerPRASAD PRABHAKAR KULKARNI

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2022 → Sep 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed55

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/180504/001597 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: REGST 0.pdf-
Multiplex Construction Permission-
Multiplex Approval drawing 18-
multiplex Approval letter from CMC 2018-
Multiplex Sale Deed Format-
Multiplex Sale Agreement Format-
Purchase Deed Multiple-
multiplex 1 N 2-
multiplex approval drawing-
Declerations PDF-
Declerations PDF-
Multiplex NA order-
Declerations PDF-
Multiplex EC 2018-
Multiplex Khatha Uttara-
JDA Multiplex-
Multiplex NA order-
Declerations PDF-
Multiplex Approval drawing-
Declerations PDF-
Balance Sheet 2016 - 2017File: Balance Sheet 16-17.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet 15-16.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet 14-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P L 16-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit and Loss 15-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit and Loss 14-15.pdf-
Director's Report 2016 - 2017File: DR 16-17.pdf-
Director's Report 2015 - 2016File: DR 15-16.pdf-
Director's Report 2014 - 2015File: DR 14-15.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow 16-17.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow 15-16.pdf-
Auditor's Report 2016 - 2017File: AR 16-17.pdf-
Auditor's Report 2015 - 2016File: AR 15-16.pdf-
Auditor's Report 2014 - 2015File: AR 14-15.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 16-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 15-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT Return 2014-15.pdf-
Declerations PDF-
Prospectus/BrochureFile: Declaration for Brochure & Advrt.pdf-
Advertisement Copy 1File: Declaration for Brochure & Advrt.pdf-
Tower Excel SheetFile: PRM-KA-RERA-1249-447-PR-180504-001597.xlsx-
Stability CertificateFile: ENGINEER Completion Certificate.pdf-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: NOC.pdf-
NOC issued by the Fire Force department after completion of workFile: NOC.pdf-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Consent for operation issued by KSPCBFile: NOC.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: NOC.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Approved Letter.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: Approved Letter.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: ENGINEER Completion Certificate.pdf-
Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: ENGINEER Completion Certificate.pdf-
Details of undivided share of land handed over to the association of allotteesFile: CA Certificate Completion Certifcate.pdf-
Architect certificate for having completed the work(in format no 5)File: ARCHITECT Completion Certifcate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: CA Certificate Completion Certifcate.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affdavit.pdf-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one moved by 9 months
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep MULTIPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

Builder: GREENZONE INFRASTRUCTURE DEVELOPERS PVT LTD

GREENZONE INFRASTRUCTURE DEVELOPERS PVT LTD has 1 registration on RERA Karnataka, including MULTIPLEX. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if MULTIPLEX is delayed beyond 20 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MULTIPLEX?

The registered promoter entity is GREENZONE INFRASTRUCTURE DEVELOPERS PVT LTD, a company as per the filing. Its CIN U45204KA2011PTC056949 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MULTIPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MULTIPLEX?

The professionals named in the filing: Architect: RAM GUNDU VARALE; Engineer: PRASAD PRABHAKAR KULKARNI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MULTIPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MULTIPLEX. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MULTIPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.