Registration approved Residential/Group Housing project

MUKAMBIKA

By Sachin Zanvar

RG-KA-39278 · RERA PRM/KA/RERA/1249/447/PR/200515/003400 · Last updated on RERA Karnataka portal: 5 Mar 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2023Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 73 documents Report an error

MUKAMBIKA is a Residential/Group Housing project by Sachin Zanvar in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/200515/003400 on 15 May 2020. Possession is promised by 30 Mar 2023. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameMUKAMBIKA
  • TypeResidential/Group Housing
  • Location
    • Belagavi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1249/447/PR/200515/003400
  • ReraGenie IDRG-KA-39278

Builder

  • NameSachin Zanvar
  • Entity typePartnership Firm
  • Authorized SignatorySACHIN ZANVAR

Key dates

this monthRegisteredMay 2020First promiseJun 2022Revised toMar 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 May 2020
  • Promised completion30 Mar 2023
  • Revised completionRevised to 30 Mar 2023 (originally 30 Jun 2022)
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MUKAMBIKA---14014

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 5 Mar 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 5 Mar 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area382 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.93 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2022 → Mar 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed73

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/200515/003400 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BANK STATEMENTFile: BANK STATMENT 1.pdf5 Mar 2020
VENDORS DETAILSFile: Vendor details.pdf5 Mar 2020
NOCFile: NOC.pdf5 Mar 2020
Affidivat Sec 3 (1)File: affidavit.pdf17 Feb 2020
Firm certificateFile: firm certificate.pdf11 Feb 2020
Bank statementFile: bank statment 2.pdf11 Feb 2020
Account front page for passbookFile: bank statment 1.pdf11 Feb 2020
payment detaailsFile: payment.pdf11 Feb 2020
Project ground floor planFile: PRESSENTATION PLAN GF (22.10.2019).pdf11 Feb 2020
Project typical floor plansFile: PRESSENTATION PLAN TF (22.10.2019).pdf11 Feb 2020
regarding, balancee sheet and for Profit and Loss statment, its a new firmFile: Scan 25-Jan-2020 (2) (1).pdf11 Feb 2020
ORDER COPY-
APPROVED DRAWING-
LAYOUT COPY-
agreement of sale-MUKAMBIKA-
agreement of sale-MUKAMBIKA-
SALE DEED_compressed-
APPROVED DRAWING-
APPROVED DRAWING-
agreement of sale-MUKAMBIKA-
APPROVED DRAWING-
PROJECT SPECIFICATIONS-
EC MERGED-
FORM B_compressed-
CTS NO 900-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
LAYOUT MAP-
APPROVED DRAWING-
NA COPY-
Unnamed document-
Balance Sheet 2018 - 2019File: Scan 25-Jan-2020.pdf-
Balance Sheet 2017 - 2018File: Scan 25-Jan-2020.pdf-
Balance Sheet 2016 - 2017File: Scan 25-Jan-2020.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Scan 25-Jan-2020 (2).pdf-
Audited Profit and Loss Statement 2017 - 2018File: Scan 25-Jan-2020 (2).pdf-
Audited Profit and Loss Statement 2016 - 2017File: Scan 25-Jan-2020 (2).pdf-
Director's Report 2018 - 2019File: Scan 25-Jan-2020 (2).pdf-
Director's Report 2017 - 2018File: Scan 25-Jan-2020 (2).pdf-
Director's Report 2016 - 2017File: Scan 25-Jan-2020 (2).pdf-
Cash Flow Statement 2018 - 2019File: Scan 25-Jan-2020 (2).pdf-
Cash Flow Statement 2017 - 2018File: Scan 25-Jan-2020 (2).pdf-
Auditor's Report 2018 - 2019File: Scan 25-Jan-2020 (2).pdf-
Auditor's Report 2017 - 2018File: Scan 25-Jan-2020 (2).pdf-
Auditor's Report 2016 - 2017File: Scan 25-Jan-2020 (2).pdf-
Income Tax Return Acknowledgement 2018 - 2019File: Scan 25-Jan-2020 (2).pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Scan 25-Jan-2020 (2).pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Scan 25-Jan-2020 (2).pdf-
FORM B_compressed-
Prospectus/BrochureFile: MUKAMBIKA (1).docx-
Advertisement Copy 1File: MUKAMBIKA (1).docx-
Tower Excel SheetFile: PRM_KA_RERA_1249_447_PR_200515_003400 (1).xlsx-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one moved by 9 months
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep MUKAMBIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

Builder: Sachin Zanvar

Sachin Zanvar has 1 registration on RERA Karnataka, including MUKAMBIKA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if MUKAMBIKA is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MUKAMBIKA?

The registered promoter entity is Sachin Zanvar, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MUKAMBIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in MUKAMBIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MUKAMBIKA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MUKAMBIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.