Home / Browse projects / Belagavi, Karnataka / MORYA TRANQUIL
MORYA TRANQUIL
By PARTH BUILDERS AND DEVELOPERS
RG-KA-34344 · RERA PRM/KA/RERA/1249/447/PR/270226/008499 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
MORYA TRANQUIL is a Residential/Group Housing project by PARTH BUILDERS AND DEVELOPERS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/270226/008499 on 27 Feb 2026. Possession is promised by 31 Dec 2029. 4 of the 29 units on this registration are recorded sold or booked, and 4 of 15 construction stages are filed complete.
At a glance
Project
- NameMORYA TRANQUIL
- TypeResidential/Group Housing
- Location
- Belagavi
- 590006
- Pincode590006
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1249/447/PR/270226/008499
- ReraGenie IDRG-KA-34344
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on27 Feb 2026
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed116 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MORYA TRANQUIL | - | - | - | 29 | 0 | 29 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 15 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 85%.
Building: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 85% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 60% |
| Masonry Construction | 10% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 25% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | No | Not applicable |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 20% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 85% |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VIJAY RAVINDRA KULKARNI, NEERAJ RAVINDRA KULKARNI AND DARSHAN RAVINDRA KULKARNI | - | - |
| Anand Neelkanth Rao Kulkarni | - | - |
| Vinod Neelkanth Rao Kulkarni | - | - |
| Mrs. Suma W/O Dilip Kumar Bhandiwad maiden name Suma d/o Neelkanthrao Kulkarni | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 7.51 cr | Rs 60.10 lakh |
| INTEREST ON BORROWING | Rs 1.20 cr | - |
| On-site expenditure-Consultants Fees | Rs 20.00 lakh | Rs 2.71 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRAVEEN KHARDE |
| Engineer | DEELIP KULKARNI AND ASSOCIATES |
| Chartered Accountant | SANDEEP KAJUKAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed116
As listed on the registration, under the names the promoter filed them with; the newest 80 of 116 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/270226/008499 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Q2-CACerti-Tranquil-2026&27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Q2-ArchCertificate-Tranquil-2026&27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q2-EnggCerti-Tranquil-2026&27.pdf | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4, Chartered Accountant's Certificate (QU) 2026-27-Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect's Certificate (QU) 2026-27 - Q1.PDF | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6, Engineer's Certificate (QU) 2026-27-Q1.PDF | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: TRANQUIL FORM-4 25-26.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect's Certificate (QU) 2025-26 Q4.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6, Engineer's Certificate (QU) 2025-26-Q4 (1).pdf | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| CA CERTIFICATE ABOUT NO VIOLATION OF SEC 3 OF ACTFile: CERTIFICATE.pdf | 3 Feb 2026 |
| Bank 100%, 70%, and 30% account pass sheets or statementsFile: RERA Account.pdf | 3 Feb 2026 |
| BANK STATEMENT FOR ALL THREE ACCOUNTSFile: RERA Account Details.PDF | 3 Feb 2026 |
| SOURCE OF FUND WITH SUPPORTING DOCUMENTSFile: SOURCE OF FUND WITH SUPPORTING DOCUMENTS.pdf | 3 Feb 2026 |
| JD AFFIDAVIT CUM DECLARATIONFile: Joint affidavit cum declaration.PDF | 3 Feb 2026 |
| Demarcation of proposed land in Approved Master plan Certified by the competent authorityFile: 15 (2).jpg | 3 Feb 2026 |
| MASTER PLANFile: 15 (1).jpg | 3 Feb 2026 |
| Demarcation of proposed land in original Village map certified by the competent authorityFile: Certified original ADLR survey sketch with boundaries.PDF | 3 Feb 2026 |
| Area details in approved plan and in order copy is not matchingFile: area description.pdf | 3 Feb 2026 |
| project estimate duly signed by the engineer only whose licence is attachedFile: brief estimation parth (1).pdf | 3 Feb 2026 |
| HESCOM NOCFile: HESCOM NOC - Tranquil.PDF | 3 Feb 2026 |
| notice replyFile: Notice Reply.pdf | 3 Feb 2026 |
| P n L 2023-24 with CA UDINFile: P n L 2023-24 with CA UDIN.pdf | 11 Nov 2025 |
| latest self attested scheduleFile: self attested IT schedule 2024-25.pdf | 11 Nov 2025 |
| RERA bank account detailsFile: RERA Account.pdf | 11 Nov 2025 |
| Source of fund with supporting documentsFile: SOURCE OF FUND WITH SUPPORTING DOCUMENTS.pdf | 11 Nov 2025 |
| Khata in the name of the land owner mentioned land owner details sectionFile: E aasthi in the name of Darshan and others.pdf | 11 Nov 2025 |
| Khata in the name of the land owner mentioned land owner details sectionFile: E aasthi in the name of Anand Kulkarni Form2_Report.pdf | 11 Nov 2025 |
| Partition Deed showing flow of title for the current ownersFile: Partition Deed -ORIGINAL.PDF | 11 Nov 2025 |
| E khataFile: E aasthi in the name of Anand Kulkarni Form2_Report.pdf | 11 Nov 2025 |
| E KhataFile: E aasthi in the name of Darshan and others.pdf | 11 Nov 2025 |
| Location details of the project , with clear demarcation of landFile: Location details of the project.pdf | 11 Nov 2025 |
| Demarcation of project land in village map (CTS map)File: Certified original ADLR survey sketch with boundaries.PDF | 11 Nov 2025 |
| Demarcation of the project land in master planFile: 15 (2).jpg | 11 Nov 2025 |
| about area details in project approval letter and approved planFile: area description.pdf | 11 Nov 2025 |
| Brief estimation major activity signed by engineerFile: Estimation.PDF | 11 Nov 2025 |
| About HESCOM NOCFile: Undertaking and declaration about HESCOM connection.pdf | 11 Nov 2025 |
| reply noticeFile: Notice Reply.pdf | 11 Nov 2025 |
| ABOUT REVENUE SALES/OPERATION IS FINANCIAL STATEMENT NOT VIOLATION OF SEC 3File: affidavit about revenue in financial documents.pdf | 6 Oct 2025 |
| PROFIT AND LOSS FOR 2024-25 WITH CA UDINFile: P n L 2024-25 with CA UDIN.pdf | 6 Oct 2025 |
| BALANCE SHEET WITH 2024-25 CA UDINFile: Balance sheet 2024-25 with CA UDIN.pdf | 6 Oct 2025 |
| SCHEDULES 2024-25File: schedule 2024-25.pdf | 6 Oct 2025 |
| SOURCE OF FUND WITH SUPPORTING DOCUMENTSFile: SOURCE OF FUND WITH SUPPORTING DOCUMENTS.pdf | 6 Oct 2025 |
| AUTHENTICATED CURRENT YEAR CTS (RTC NOT APPLICABLE)File: CTS of Chidmabar nagar.PDF | 6 Oct 2025 |
| CONNECTED MUTATION SHOWING FLOW OF TITLES IN FAVOUR OF PRESENT LAND OWNERFile: MR card.PDF | 6 Oct 2025 |
| TITLE DEED OF CURRENT LANDOWNERFile: ABOUT TITLE DEED.pdf | 6 Oct 2025 |
| NOTARIZED AFFIDAVIT IN FORM BFile: Notarized Form B tranquil.pdf | 6 Oct 2025 |
| EC FROM 01-04-2011 TO 23-09-2025File: EC - Tranquiil.PDF | 6 Oct 2025 |
| ABOUT SINGLE PLOT LAYOUT PLANFile: About single plot layout order.pdf | 6 Oct 2025 |
| ABOUT SINGLE PLOT LAYOUT PLAN ORDERFile: About single plot layout order.pdf | 6 Oct 2025 |
| BUILDING LICENSE FORM LOCAL AUTHORITY WITH QR CODEFile: Building license original with QR Code.pdf | 6 Oct 2025 |
| ADLR CERTIFIED SURVEY SKETCH CERTIFYING BOUNDARY OF PROPOSED LANDFile: Certified original ADLR survey sketch with boundaries.PDF | 6 Oct 2025 |
| ORIGINAL SANCTIONED DRAWINGS, FLOOR PLAN, SECTIONAL DRAWINGS AND ELEVATIONSFile: DWG 1_Layout_Layout1_BGM_LBPAS_28818_25_26_BP (1).pdf | 6 Oct 2025 |
| ABOUT COMMENCEMENT CERTIFICATEFile: about commencment certificate.pdf | 6 Oct 2025 |
| ORIGINAL MAP CERTIFIED BY COMPETENT AUTHORITYFile: CTS Map 21-09-24.PDF | 6 Oct 2025 |
| KSPCB NOCFile: KSPCB NOC.pdf | 6 Oct 2025 |
| ABOUT NOC UNDER SECTION 14 OF KTCP ACTFile: Approval-NOC Section 14.pdf | 6 Oct 2025 |
| SEWER LINE DRAWINGFile: Sewer Line Drg.PDF | 6 Oct 2025 |
| UNDERTAKING CUM DECLARATION OF WATER SUPPLY HESCOM WITH SUPPORTING DOCUMENTSFile: UNDERTAKING CUM DECLARATION.pdf | 6 Oct 2025 |
| DRAFT OF AGREEMENTFile: Draft of Agreement of sale.pdf | 6 Oct 2025 |
| brief estimation of projectFile: Estimated cost - Morya Tranquil.PDF | 6 Oct 2025 |
| Registration CertificateFile: Parth_Certificate.pdf | - |
| GST CertificateFile: Slef Attested GST Certificate.PDF | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form-1 Chartered Accountat's Certificate (PR).PDF | - |
| Certificate issued by Architect Form 2File: Form-2 Architects Certificate (PR).PDF | - |
| Certificate issued by Engineer Form 3File: Form-3 Engineer's Certificate (PR).PDF | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: no litigation affidavit Tranquil.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| MORYA NEST | CTS No. 5028 and 5029,situated at Wada Compound, Angol, Belgaum | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep MORYA TRANQUIL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Filed coordinates, straight-line distance. 54 registered projects within 2 km.
One Life Phase III ,IV & V
Ambica Infra Build
ONE LIFE PHASE I & II
Ambica Infra Build
FORTUNE TOWER
The Fortune Five
ALORA
THE FORTUNE FIVE
SHREE DATTA SMRUTI
SHREE RADHAKRISHNA DEVELOPERS
SANAVI RESIDENCY
ANIL ANNASAHEB PATIL
See every Belagavi project, with the district possession charts
Builder: PARTH BUILDERS AND DEVELOPERS
PARTH BUILDERS AND DEVELOPERS has 4 registrations on RERA Karnataka, including Morya Next and MORYA ELITE. Its filings declare 3 earlier projects, none of them declared completed. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if MORYA TRANQUIL is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of MORYA TRANQUIL?
The registered promoter entity is PARTH BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AATFP6729J1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in MORYA TRANQUIL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at MORYA TRANQUIL?
The professionals named in the filing: Architect: PRAVEEN KHARDE; Engineer: DEELIP KULKARNI AND ASSOCIATES; Chartered Accountant: SANDEEP KAJUKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MORYA TRANQUIL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback