  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2030Possession promisedno revision filed
1 of 18Construction stages donefurthest along: Foundation footing work, 15%
38 of 76Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 123 documents Report an error

Melange One By Vaishnodevi is a Residential/Group Housing project by VAISHNODEVI MELANGE ESTATES LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/230126/008425 on 23 Jan 2026. Possession is promised by 16 Dec 2030. 38 of the 76 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete.

At a glance

Project

  • NameMelange One By Vaishnodevi
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560098
  • Pincode560098
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/230126/008425
  • ReraGenie IDRG-KA-64560

Builder

  • NameVAISHNODEVI MELANGE ESTATES LLP
  • Entity typePartnership Firm
  • LLPINACJ-6160
  • GSTIN29AAZFV0935A1ZU
  • Authorized SignatoryVimal Jain

Key dates

this monthRegisteredJan 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Jan 2026
  • Promised completion16 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed123 files

Current status

50%38 of 76 units booked
11.5%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Single Tower---76076

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 15%.

Building: 6% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work15%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,752 sq m
Named landowners1
LandownerVillageDistrict
Vaishnodevi Melange Estates LLP--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 96.13 cr
Cost incurredRs 11.06 cr
Spent of the estimate11.51%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 75.00 crRs 9.51 cr
Brokerage and Marketing costRs 10.00 cr-
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 8.13 crRs 1.56 cr
Approval costRs 2.00 cr-
Administrative costRs 1.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAni Sambyal
EngineerYogesh H P
Chartered AccountantKOTAPALLI SAYINATHA REDDY

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed123

As listed on the registration, under the names the promoter filed them with; the newest 80 of 123 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/230126/008425 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA certificate june 26.pdf10 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT certificate june 26.pdf10 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6_Engineer Certificate June 26.pdf10 Jul 2026
Q1 2026-27 Water supply and sewage board10 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)10 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)10 Jul 2026
Q1 2026-27 KPTCL- BESCOM10 Jul 2026
Q1 2026-27 Fire and Safety10 Jul 2026
Q1 2026-27 Airport Authority of India10 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department10 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA certificate March 26.pdf13 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect Certificate March 26.pdf13 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6_Engineer certificate March 26.pdf13 Apr 2026
Q4 2025-26 Water supply and sewage board13 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)13 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)13 Apr 2026
Q4 2025-26 KPTCL- BESCOM13 Apr 2026
Q4 2025-26 Fire and Safety13 Apr 2026
Q4 2025-26 Airport Authority of India13 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department13 Apr 2026
Clarification note regarding account namesFile: 1 Clarification note regarding account names.pdf22 Jan 2026
VME llp 100% -COLLECTION ACCFile: 1 VME llp 100% -COLLECTION ACC.pdf22 Jan 2026
VME llp 70%-DESIGNATED ACCFile: 1 VME llp 70%-DESIGNATED ACC.pdf22 Jan 2026
VME llp 30%-UTILIZATION ACCFile: 1 VME llp 30%-UTILIZATION ACC.pdf22 Jan 2026
VME llp Loan Clarification LetterFile: 2 VME llp Loan Clarification Letter.pdf22 Jan 2026
VME llp Confirmation Deed-6589- 2025-26File: 3 VME llp Confirmation Deed-6589- 2025-26.pdf22 Jan 2026
VME llp ECC-22012026-9473682File: 3 VME llp ECC-22012026-9473682.pdf22 Jan 2026
VME llp Single layout OrderFile: 4 VME llp Single Site Order.pdf22 Jan 2026
VME llp Single layout PlanFile: 4 VME llp Single Site Plan.pdf22 Jan 2026
VME llp Commencement Certificate-DeclarationFile: 5 VME llp Commencement Certificate-Declaration.pdf22 Jan 2026
Query Answers 22-01-2026File: Query Answers 22-01-2026.pdf22 Jan 2026
Bank AffidavitFile: 1 Bank Affidavit.pdf17 Dec 2025
VME llp 30% curr accFile: 2 VME llp 30% curr acc.pdf17 Dec 2025
VME llp 70% Des accFile: 2 VME llp 70% Des acc.pdf17 Dec 2025
VME llp 100% Coll accFile: 2 VME llp 100% Coll acc.pdf17 Dec 2025
VME llp Declaration of Financial StatementFile: 3 VME llp Declaration of Financial Statement.pdf17 Dec 2025
VME llp Declaration on Registered firm certiFile: 7 VME llp Declaration on Registered firm certi.pdf17 Dec 2025
VME llp Form B AffidavitFile: 8 VME llp Form B Affidavit.pdf17 Dec 2025
VME llp Non-Litigation AffidavitFile: 10 VME llp Non-Litigation Affidavit.pdf17 Dec 2025
VME llp EC 24-11-2025File: 11 VME llp EC 24-11-2025.pdf17 Dec 2025
VME llp Declaration on Firm certiFile: 12 VME llp Declaration on Firm certi.pdf17 Dec 2025
VME llp Single Site OrderFile: 14 VME llp Single Site Order.pdf17 Dec 2025
VME llp Single Site PlanFile: 14 VME llp Single Site Plan.pdf17 Dec 2025
VME llpEngineer lisence signedFile: 18 VME llpEngineer lisence signed.pdf17 Dec 2025
VME llp Agreement of saleFile: 19 VME llp Agreement of sale.pdf17 Dec 2025
VME llp ALLOTMENT LETTERFile: 20 VME llp ALLOTMENT LETTER.pdf17 Dec 2025
VME llp Land Calculation SheetFile: 21 VME llp Land Calculation Sheet.jpeg17 Dec 2025
VME LLP Query AnswersFile: VME LLP Query Answers.pdf17 Dec 2025
Registration CertificateFile: VME llp Registration Certificate.pdf-
GST CertificateFile: VME llp GST.pdf-
Partnership DeedFile: VME llp Amended LLP Agreement.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: VME llp Form-1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: VME llp Form-2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: VME llp Form-3 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: VME llp Non-Litigation Affidavit.pdf-
Balance Sheet 2024 - 2025File: VME llp Balance Sheet 2024-25.pdf-
Audited Profit and Loss Statement 2024 - 2025File: VME llp Profit and loss 2024-25.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: VME llp ITR 2024-25.pdf-
VME llp Building License-
VME llp Approved Plan-
VME llp Approved Plan-
VME llp Stability Certificate-
VME llp Project Specifications-

How this compares with Bengaluru Urban

50%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Melange One By Vaishnodevi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMelange One By VaishnodeOther 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: VAISHNODEVI MELANGE ESTATES LLP

VAISHNODEVI MELANGE ESTATES LLP has 1 registration on RERA Karnataka, including Melange One By Vaishnodevi. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Melange One By Vaishnodevi is delayed beyond 16 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Melange One By Vaishnodevi?

The registered promoter entity is VAISHNODEVI MELANGE ESTATES LLP, a partnership firm as per the filing. Its LLPIN ACJ-6160 and GSTIN 29AAZFV0935A1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Melange One By Vaishnodevi?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Melange One By Vaishnodevi?

The professionals named in the filing: Architect: Ani Sambyal; Engineer: Yogesh H P; Chartered Accountant: KOTAPALLI SAYINATHA REDDY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Melange One By Vaishnodevi?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Melange One By Vaishnodevi. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Melange One By Vaishnodevi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.