Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Nov 2021Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 54 documents Report an error

MAULI RESIDENCY is a Residential/Group Housing project by SAANVI BUILDERS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/200117/003194 on 17 Jan 2020. Possession is promised by 2 Nov 2021. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameMAULI RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Belagavi
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1249/447/PR/200117/003194
  • ReraGenie IDRG-KA-80183

Builder

  • NameSAANVI BUILDERS
  • Entity typePartnership Firm
  • Authorized SignatoryMADAN BABU RAO BAMANE
  • OthersMADAN BABU RAO BAMANE, SUNIL MARUTI MUTGEKAR, SUNIL CHANDRAKANT PAWAR

Key dates

this monthRegisteredJan 2020First promiseFeb 2021Revised toNov 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Jan 2020
  • Promised completion2 Nov 2021
  • Revised completionRevised to 2 Nov 2021 (originally 2 Feb 2021)
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAULI RESIDENCY---12012

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 6 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area334 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.52 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionFeb 2021 → Nov 2021

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed54

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/200117/003194 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
E C From dated 01 /12/2015 to till DateFile: EC.pdf6 Jan 2020
Joint affidavit cum declarationFile: saanvi.pdf6 Jan 2020
Form BFile: saanvi builders.pdf6 Jan 2020
Gift deedFile: GIFT DEED.pdf24 Dec 2019
OLD Nil Encumbrance New Not available will be processed tommorowFile: NIL INCOM FIRANCE CERTIFICATE.pdf24 Dec 2019
FORM -BFile: notarise copy.pdf24 Dec 2019
JD Affidavit24 Dec 2019
Fee ReceiptFile: Receipt.pdf24 Dec 2019
Audit not Liable for audit so Not apllicableFile: Audit.pdf24 Dec 2019
Land calculationFile: Land.pdf24 Dec 2019
CertificateFile: Partnership Deed Cirtificate.pdf-
permission order copy_compressed-
BUILDING PERMISSION COPY_compressed-
BUDA LAYOUT-
sale deed FORMAT rera-
agreement Format-
ORIGNAL SALE DEED-
BUILDING PERMISSION COPY_compressed-
untitled-
untitled-
untitled-
BUILDING MATERIAL SPECIFICATION-
NIL INCOM FIRANCE CERTIFICATE-
untitled-
untitled-
CTS EXTRACT-
JOINT DEVELOPMENT AGREEMENT-
POWER OF ATTORNEY-
structural engg certificate-
BUDA LAYOUT-
BUILDING MATERIAL SPECIFICATION-
untitled-
ADVOCATE REPORT-
Balance Sheet 2018 - 2019File: untitled.JPG-
Balance Sheet 2017 - 2018File: untitled.JPG-
Balance Sheet 2016 - 2017File: untitled.JPG-
Audited Profit and Loss Statement 2018 - 2019File: untitled.JPG-
Audited Profit and Loss Statement 2017 - 2018File: untitled.JPG-
Audited Profit and Loss Statement 2016 - 2017File: untitled.JPG-
Director's Report 2018 - 2019File: untitled.JPG-
Director's Report 2017 - 2018File: untitled.JPG-
Director's Report 2016 - 2017File: untitled.JPG-
Cash Flow Statement 2018 - 2019File: untitled.JPG-
Cash Flow Statement 2017 - 2018File: untitled.JPG-
Auditor's Report 2018 - 2019File: untitled.JPG-
Auditor's Report 2017 - 2018File: untitled.JPG-
Auditor's Report 2016 - 2017File: untitled.JPG-
Income Tax Return Acknowledgement 2018 - 2019File: untitled.JPG-
Income Tax Return Acknowledgement 2017 - 2018File: untitled.JPG-
Income Tax Return Acknowledgement 2016 - 2017File: untitled.JPG-
saanvi builders-
Prospectus/BrochureFile: Sectional plan.jpg-
Advertisement Copy 1File: Sectional plan.jpg-
Tower Excel SheetFile: Mouli Residency Excel work sheet.xlsx-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one moved by 9 months
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep MAULI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

2 kmMAULI RESIDENCYOther 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: SAANVI BUILDERS

SAANVI BUILDERS has 1 registration on RERA Karnataka, including MAULI RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if MAULI RESIDENCY is delayed beyond 2 Nov 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MAULI RESIDENCY?

The registered promoter entity is SAANVI BUILDERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MAULI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in MAULI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAULI RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAULI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.