ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / MAITREE SPRINT

Registration approved No litigation declared Residential/Group Housing project

MAITREE SPRINT

By MAITREE DEVELOPERS

RG-KA-68362 · RERA PRM/KA/RERA/1251/446/PR/010722/005029 · Last updated on RERA Karnataka portal: 13 Jun 2022

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Feb 2024Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 116 documents Report an error

MAITREE SPRINT is a Residential/Group Housing project by MAITREE DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/010722/005029 on 1 Jul 2022. Possession is promised by 29 Feb 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMAITREE SPRINT
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560087
  • Pincode560087
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/010722/005029
  • ReraGenie IDRG-KA-68362

Builder

  • NameMAITREE DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29ABFFM0479B1ZC
  • Authorized SignatoryTHOKALA VENKATA RAO
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2022PromisedFeb 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on1 Jul 2022
  • Promised completion29 Feb 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed116 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAITREE SPRINT---40040

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 13 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,922 sq m
Named landowners4
LandownerVillageDistrict
Ashalatha--
B G Manjunath--
Harshitha B M--
Vinay Gowda B M--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.17 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 7.27 cr-
On-site expenditure-Salaries of workersRs 25.00 lakh-
On-site expenditure-Site OverheadRs 15.00 lakh-
Payment of chargesRs 15.00 lakh-
On-site expenditure-Consultants FeesRs 10.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 10.00 lakh-
Payment of cessRs 8.17 lakh-
Payment of feesRs 5.00 lakh-
Payment of taxesRs 2.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV Siva Kumar
EngineerSRINIVAS RAO BOLIMUNTA
Chartered AccountantKopalli Mallikarjuna

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00682/2024-MAITREE DEVELOPERS02/08/2024

Documents filed116

As listed on the registration, under the names the promoter filed them with; the newest 80 of 116 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/010722/005029 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PRM/KA/RERA/1251/446/PR/200526/003429 quarterly Return Form 4 _ Quarter 1File: FORM 4 Q1 FY 2020-21.pdf13 Jun 2022
PRM/KA/RERA/1251/446/PR/200526/003429 quarterly Return Form 4 _ Quarter 2File: FORM 4 Q2 FY 2020-21.pdf13 Jun 2022
PRM/KA/RERA/1251/446/PR/200526/003429 quarterly Return Form 4 _ Quarter 3File: FORM 4 Q3 FY 2020-21.pdf13 Jun 2022
PRM/KA/RERA/1251/446/PR/200526/003429 quarterly Return Form 4 _ Quarter 4File: FORM 4 Q4 FY 2020-21.pdf13 Jun 2022
PRM/KA/RERA/1251/446/PR/200526/003429 quarterly Return Form 4 _ Quarter 5File: FORM 4 Q1 FY 2021-22.pdf13 Jun 2022
PRM/KA/RERA/1251/446/PR/200526/003429 quarterly Return Form 4 _ Quarter 6File: FORM 4 Q2 FY 2021-22.pdf13 Jun 2022
PRM/KA/RERA/1251/446/PR/200526/003429_ Annual Return_ Form 7File: Form 7_Annual Audit Report on Statement Of Accounts_Signed.pdf13 Jun 2022
Proforma agreement for sale consistent with the GOK notified Agreement for SaleFile: Proforma agreement for sale are consistent with the GOK notified Agreement for Sale.pdf13 Jun 2022
PRM/KA/RERA/1251/446/PR/200526/003429 1st quarterly return FY-2020-2021File: 1st Qtr RERA Form-4-FY-2020-21_Maitree-Marvel Project.pdf23 Mar 2022
PRM/KA/RERA/1251/446/PR/200526/003429 2nd quarterly return FY-2020-2021File: 2nd Qtr RERA Form-4-FY-2020-21_Maitree-Marvel Project.pdf23 Mar 2022
PRM/KA/RERA/1251/446/PR/200526/003429 3rd quarterly return FY-2020-2021File: 3rd Qtr RERA Form-4-FY-2020-21_Maitree-Marvel Project.pdf23 Mar 2022
PRM/KA/RERA/1251/446/PR/200526/003429 4th quarterly return FY-2020-2021File: 4th Qtr RERA Form-4-FY-2020-21_Maitree-Marvel Project.pdf23 Mar 2022
PRM/KA/RERA/1251/446/PR/200526/003429 1st quarterly return FY-2021-2022File: FORM 4 Qtr-1-FY 2021-22.pdf23 Mar 2022
PRM/KA/RERA/1251/446/PR/200526/003429 2nd quarterly return FY-2021-2022File: FORM 4 Qtr-2-FY 2021-22.pdf23 Mar 2022
PRM/KA/RERA/1251/446/PR/200526/003429 1st quarterly return Form-1- FY-2020-2021File: RERA Form-1-FY-2020-21_Maitree-Marvel Project.pdf23 Mar 2022
Annual RERA ReturnFile: Form 7_Annual Audit Report on Statement Of Accounts_Signed.pdf23 Mar 2022
proforma of Agreement for saleFile: AS OF MAITREE SPRINT’-RERA DRAFT.pdf23 Mar 2022
1. Quarterly updatesFile: 1 Quarterly Returns.pdf24 Feb 2022
2. Mention CA UDIN for 2020-21 profit and loss account and balance sheetFile: 2 Financial Statements_FY 2020-2021_Maitree_Signed.pdf24 Feb 2022
2. Need notarized Non- litigation affidavitFile: 3 Non-Litigation Affidavit.pdf24 Feb 2022
2. Total Plinth Area may not be more than the Total Area of LandFile: 4 Total Plinth Area may not be more than the Total Area of Land.pdf24 Feb 2022
The proforma of Agreement of Sale (AOS)File: 5 AS OF MAITREE SPRINT’-RERA DRAFT.pdf24 Feb 2022
chartered accountant for total estimation of costFile: 2 Chartered Accountant for Total Estimation of Cost.pdf10 Feb 2022
Upload 2020-21 profit and loss accountFile: 3 PROFIT & LOSS SCHEDULES_AY 2021-22_MAITREE DEVELOPERS.pdf10 Feb 2022
balance sheetFile: 3 BALANCE SHEEET SCHEDULES_AY 2021-22_MAITREE DEVELOPERS.pdf10 Feb 2022
title deed for survey no in the name of land ownerFile: 4 Title deed for survey no in the name of land owner_compressed.pdf10 Feb 2022
conversionFile: 5 Conversion order for each survey nos and extent for all survey nos.pdf10 Feb 2022
EC from 01-04-2005 to up to date in Form-15File: 6 EC from 01-04-2005 to up to date in Form-15 in the name Land owner and promoter.pdf10 Feb 2022
notarized form-B in RERA prescribed form on stamp paperFile: 7 Notarized form-B in RERA prescribed form on stamp paper.pdf10 Feb 2022
notarized Joint affidavit cum declaration in RERAFile: 8 Notarized Joint affidavit cum declaration in RERA prescribed form.pdf10 Feb 2022
Non- litigationFile: 9 Non- litigation_compressed.pdf10 Feb 2022
KSPCB NOCFile: 10 KSPCB NOC.pdf10 Feb 2022
relinquishment deedFile: 11 Relinquishment Deed.pdf10 Feb 2022
Total Plinth Area may not be more than the Total Area of LandFile: 12 Total Plinth Area may not be more than the Total Area of Land.pdf10 Feb 2022
Type of Inventory and No. of Inventory detailsFile: 13 Inventory and No of Inventory details with plot wise in development detail of project.p10 Feb 2022
section 3(1) notarized affidavitFile: 14 Section 3 (1) notarized affidavit.pdf10 Feb 2022
signed copy of the project specificationFile: 15 Signed copy of the project specification.pdf10 Feb 2022
copy of BWSSB NOC along with fee-paid receipts detailsFile: 17 BWSSB NOC along with fee-paid receipts details.pdf10 Feb 2022
copy of BESCOM NOCFile: 18 BESCOM NOC.pdf10 Feb 2022
AOS not in accordance with the notified AOS. Therefore Please upload the proforma of Agreement of SaFile: 19 Proforma of Agreement of Sale (AOS) notified by GOK.pdf10 Feb 2022
the proforma sale deedFile: 20 Proforma Sale Deed.pdf10 Feb 2022
Proforma of Allotment LetterFile: 21 Proforma of Allotment Letter.pdf10 Feb 2022
Provision of STP in the projectFile: 22 Provision of STP in the project.pdf10 Feb 2022
Registration CertificateFile: 1 Maitree Registration Certificate.pdf-
Partnership DeedFile: 17 Partnership Deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: 57 NA Certificate by CA.pdf-
Certificate issued by Architect Form 2File: 59 NA Certificate by Architect.pdf-
Certificate issued by Engineer Form 3File: 58 NA Certificate by Engineer.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: 45 Affidavit NA.pdf-
Certificate from Chartered AccountFile: 56 NA.pdf-
Balance Sheet 2020 - 2021File: 60 NA Balance Sheet FY 2020-21.pdf-
Balance Sheet 2019 - 2020File: 60 Balance sheet FY 2019-20.pdf-
Balance Sheet 2018 - 2019File: 60 Balance Sheet FY 2018-19.pdf-
Audited Profit and Loss Statement 2020 - 2021File: 61 NA Profit and Loss FY 2020-21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: 61 Profit and Loss FY 2019-20.pdf-
Audited Profit and Loss Statement 2018 - 2019File: 61 Profit and Loss FY 2018-19.pdf-
Director's Report 2020 - 2021File: 62 NA Director Report FY 2020-21.pdf-
Director's Report 2019 - 2020File: 62 NA Director Report FY 2019-20.pdf-
Director's Report 2018 - 2019File: 62 NA Director Report FY 2018-19.pdf-
Cash Flow Statement 2020 - 2021File: 63 NA CFS FY 2020-21.pdf-
Cash Flow Statement 2019 - 2020File: 63 NA CFS FY 2019-20.pdf-
Auditor's Report 2020 - 2021File: 64 NA Audit Report FY 2020-21.pdf-
Auditor's Report 2019 - 2020File: 64 NA Audit Report FY 2019-20.pdf-
Auditor's Report 2018 - 2019File: 64 NA Audit Report FY 2018-19.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: 65 NA ITR V Ack_FY 2020-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: 65 ITR V Ack FY-2019-20.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: 65 ITR V Ack AY-2018-19.pdf-
67 Approval Letter_Building License-
68 NOC Bescom-
69 NOC BWSSB-
70 Plan Approval Certificate-
71 Plan Approval Certificate-
72 Plan Approval Certificate-
73 Plan Approval Certificate-
74 Sectional Drawing-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
MAITREE MARVELSURVEY NO.6/3A, SEEGEHALLI VILLAGE, K.R.PURAM HOBLI, BENGALURU EASTCompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MAITREE SPRINT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMAITREE SPRINTOther 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: MAITREE DEVELOPERS

MAITREE DEVELOPERS has 3 registrations on RERA Karnataka, including MAITREE SPRINT and MAITREE VAJRA. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MAITREE SPRINT is delayed beyond 29 Feb 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MAITREE SPRINT?

The registered promoter entity is MAITREE DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29ABFFM0479B1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MAITREE SPRINT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAITREE SPRINT?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at MAITREE SPRINT?

The professionals named in the filing: Architect: V Siva Kumar; Engineer: SRINIVAS RAO BOLIMUNTA; Chartered Accountant: Kopalli Mallikarjuna. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAITREE SPRINT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAITREE SPRINT. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAITREE SPRINT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.