Home / Browse projects / Belagavi, Karnataka / LOTUS PRIDE

Registration approved No litigation declared Residential/Group Housing project

LOTUS PRIDE

By GREEN LOTUS INFRASTRUCTURES

RG-KA-61037 · RERA PRM/KA/RERA/1249/447/PR/200325/007595 · Last updated on RERA Karnataka portal: 1 Mar 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 119 documents Report an error

LOTUS PRIDE is a Residential/Group Housing project by GREEN LOTUS INFRASTRUCTURES in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/200325/007595 on 20 Mar 2025. Possession is promised by 31 Mar 2026.

At a glance

Project

  • NameLOTUS PRIDE
  • TypeResidential/Group Housing
  • Location
    • Belagavi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1249/447/PR/200325/007595
  • ReraGenie IDRG-KA-61037

Builder

  • NameGREEN LOTUS INFRASTRUCTURES
  • Entity typePartnership Firm
  • GSTIN29AAXFG6473E1ZQ
  • Authorized SignatoryMr. SHREYANSH PRAFULLA PATIL

Key dates

this monthRegisteredMar 2025PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Mar 2025
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed119 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LOTUS PRIDE---12012

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 1 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 1 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
Mr. Shreyansh Prafulla Patil--
Mr. Chetan Chandrkant Buddannavar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.89 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 3.30 cr-
Payment of PremiumsRs 54.00 lakh-
On-site expenditure-Consultants FeesRs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Sumit. P. Gawade
EngineerEr. Shreyansh P Patil
Chartered AccountantCA SANDEEP KAJUKAR & CO

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed119

As listed on the registration, under the names the promoter filed them with; the newest 80 of 119 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/200325/007595 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
defect free EC from 3-2-2024 to till date as some transactions are found missing in the uploaded doFile: Affidavit Cum Decoration of EC.pdf1 Mar 2025
EC ACK NUMBERFile: Revised EC ACK No-3384 2024 to 2025.pdf1 Mar 2025
Advocate Search ReportFile: Legal Opinion.pdf1 Mar 2025
As per CA certificate there are borrowings therefore Disbursed loan amount should be credited to desFile: Rectification of Mortgage the Plot.pdf14 Feb 2025
Sources of fund to complete the project with supporting documentsFile: Source of Funds.pdf14 Feb 2025
defect free EC from 3-2-2024 to till date as some transactions are found missing in the uploaded docFile: Nil Encumbrance.pdf14 Feb 2025
latest Advocate Search ReportFile: Legal Opinion.pdf14 Feb 2025
Please upload the NOC issued by the concerned Water SupplyFile: Water NOC Certified.pdf14 Feb 2025
= Water Supply Paid ReceiptFile: Water NOC Paid Receipt.jpg14 Feb 2025
Please upload the NOC issued Power supply AuthoritiesFile: NOC for Electricity.pdf14 Feb 2025
As per CA certificate there are borrowings therefore Disbursed loan amount should be credited to desFile: Rectification of Mortgage the Plot.pdf21 Jan 2025
Sources of fund to complete the project with supporting documentsFile: Source of Funds.pdf21 Jan 2025
Advocate Search ReportFile: Legal Opinion.pdf21 Jan 2025
Single Layout approval plan blue print in readable formatFile: Single Plot Layout Copy.pdf21 Jan 2025
Single Layout approval order copyFile: Single Plot Exemption Letter.pdf21 Jan 2025
Building plan Blue print in readable formatFile: All Sanctioned Drawings.pdf21 Jan 2025
Building plan Blue print in readable formatFile: Approved Plan.pdf21 Jan 2025
Extract of Master Plan proposed area with consent authority seal and signatureFile: CDP Plan 3384 (1).pdf21 Jan 2025
Village MapFile: Village Map.pdf21 Jan 2025
Extract of ZR copyFile: ZR Final Copy Belagavi.pdf21 Jan 2025
ADLR Survey SketchFile: CTS Map 3384.pdf21 Jan 2025
Each floor plan and section planFile: All Floor Plan Certified by Engineer.pdf21 Jan 2025
Each floor plan and section planFile: Front Elevation & Sectional Drawing (2).pdf21 Jan 2025
KSPCB NOCFile: KSPCB NOC Rectification.pdf21 Jan 2025
STP/Septic tank, Soak pit, and sewer line drawing certified by the EngineerFile: Soak Pit & Drainange Line Demarcation.pdf21 Jan 2025
Please clarify the source of water supply to the project along with the supporting documents and phoFile: Self Declration of Water Supply Lotus Pride_organized.pdf21 Jan 2025
Single Plot Order & Layout Exemption Letter from BUDAFile: BUDA Exemption Lettr Copy.pdf21 Jan 2025
Upload chartered accountant KYC and registration certificateFile: CA Membership Certificate.pdf24 Dec 2024
chartered accountant certificate form-01File: FORM -1 CA.pdf24 Dec 2024
bank affidavit in the prescribed formatFile: RERA Bank Affidavit.pdf24 Dec 2024
CA certificate there are borrowings therefore Disbursed loan amount should be credited to designatedFile: BALANCESHEET -2023-24.pdf24 Dec 2024
Sources of fund to complete the project with supporting documentsFile: Source of Funds.pdf24 Dec 2024
Upload financials with CA UDIN 2022-23File: Balance Sheet 2022-23.pdf24 Dec 2024
Upload financials with CA UDIN 2022-23File: PROFIT & LOSS-2022-23.pdf24 Dec 2024
Upload financials with CA UDIN 2023-24File: BALANCESHEET -2023-24.pdf24 Dec 2024
Upload financials with CA UDIN 2023-24File: PROFIT & LOSS-2023-24.pdf24 Dec 2024
defect free EC from 3-2-2024 to till date as some transactions are found missing in the uploaded docFile: EC ACK No.pdf24 Dec 2024
latest Advocate Search ReportFile: Legal Opinion.pdf24 Dec 2024
Single Layout approval plan blue print in readable formatFile: Single Plot Layout.pdf24 Dec 2024
Single Layout approval order copyFile: Single Layout Order Copy.pdf24 Dec 2024
Building plan Blue print in readable formatFile: Approved Plan.pdf24 Dec 2024
Extract of Master Plan proposed area with consent authority seal and signatureFile: CDP Plan 3384 (1).pdf24 Dec 2024
Village MapFile: Village Map.pdf24 Dec 2024
Extract of ZR copy with consent authority seal and signatureFile: ZR Final Copy Belagavi.pdf24 Dec 2024
ADLR Survey SketchFile: CTS Map 3384.pdf24 Dec 2024
Each floor plan and section planFile: All Floor Plan Certified by Engineer.pdf24 Dec 2024
KSPCB NOCFile: Self Declration of KSPCB NOC for Lotus Pride.pdf24 Dec 2024
upload the latest dated self attested copy of the Engineer license certificateFile: Engineer Licence.pdf24 Dec 2024
Updated Amenities and Common area details are incorrect. Please update the same properly as per theFile: Certified Amenties & Common Area Details.pdf24 Dec 2024
Please Upload the STP/Septic tank, Soak pit, and sewer line drawing certified by the EngineerFile: STP Demarcation.pdf24 Dec 2024
Registration CertificateFile: Firm Registration Copy (1).pdf-
GST CertificateFile: GST Certificate (1).pdf-
Partnership DeedFile: Partnership Deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: FORM -1 CA.pdf-
Certificate issued by Architect Form 2File: Form-2, Architect (PR) Revised.pdf-
Certificate issued by Engineer Form 3File: Form-3, Engineer (PR) Revised.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non-Litigation.pdf-
ApprovalCertificate (2)-
NOC for Electricity-
NOC for Water-
Approved Plan-
Front Elevation & Sectional Drawing (2)-
Project Specification of Lotus Pride-
Front Elevation & Sectional Drawing (2)-
Floor Wise Area Calculation Sheet Lotus Pride-
Stability Certificate-
Legal Opinion-
Mother Deed-
Excemption of DC Convesrion Order-
Sale Deed-
Agreement of Sale Proforma Lotus Pride-
ALLOTMENT LETTER LOTUS PRIDE-
Form-B-
Section 3_1 Non-Violation-
NOC for Electricity-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep LOTUS PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

Builder: GREEN LOTUS INFRASTRUCTURES

GREEN LOTUS INFRASTRUCTURES has 1 registration on RERA Karnataka, including LOTUS PRIDE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if LOTUS PRIDE is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of LOTUS PRIDE?

The registered promoter entity is GREEN LOTUS INFRASTRUCTURES, a partnership firm as per the filing. Its GSTIN 29AAXFG6473E1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in LOTUS PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at LOTUS PRIDE?

The professionals named in the filing: Architect: Ar. Sumit. P. Gawade; Engineer: Er. Shreyansh P Patil; Chartered Accountant: CA SANDEEP KAJUKAR & CO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LOTUS PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LOTUS PRIDE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LOTUS PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.