ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Lotus Hill

Registration approved No litigation declared Residential/Group Housing project

Lotus Hill

By ACROLITH BUILDERS

RG-KA-34264 · RERA PRM/KA/RERA/1251/446/PR/060324/006690 · Last updated on RERA Karnataka portal: 1 Mar 2024

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 102 documents Report an error

Lotus Hill is a Residential/Group Housing project by ACROLITH BUILDERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/060324/006690 on 6 Mar 2024. Possession is promised by 29 Dec 2025.

At a glance

Project

  • NameLotus Hill
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560087
  • Pincode560087
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/060324/006690
  • ReraGenie IDRG-KA-34264

Builder

  • NameACROLITH BUILDERS
  • Entity typeProprietorship
  • GSTIN29FHJPS3785R1ZW
  • Authorized SignatoryHitesh S

Key dates

this monthRegisteredMar 2024PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Mar 2024
  • Promised completion29 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lotus Hill---28028

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 1 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 1 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,267 sq m
Named landowners1
LandownerVillageDistrict
Mr. J XAVIER PETER--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.46 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 7.51 cr-
On-site expenditure-Salaries of workersRs 70.00 lakh-
On-site expenditure-Consultants FeesRs 20.50 lakh-
On-site expenditure-Site OverheadRs 3.93 lakh-
Payment of taxesRs 42,500-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Marxia Tamil Selvan
EngineerMr.Kumar R
Chartered AccountantShubham Dalmia

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed102

As listed on the registration, under the names the promoter filed them with; the newest 80 of 102 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/060324/006690 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
As per Uploaded CDP the proposed site comes under residential ,commercial and agricultural purpoFile: SORAHUNASE_BBMP-CDP.pdf1 Mar 2024
Upload commencement certificateFile: cc letter.pdf1 Mar 2024
Upload chartered accountant certificate in prescribed format form -01File: form 1.pdf17 Feb 2024
Upload profit and loss account and balance sheet, 2020-21, 2021-22 & 2022-23 with CA UDINFile: Profit and loss (1).pdf17 Feb 2024
Upload profit and loss account and balance sheet, 2020-21, 2021-22 & 2022-23 with CA UDINFile: Profit and loss (1).pdf17 Feb 2024
Bank account name should be as per bank account direction circularFile: Icic bank acount open.pdf17 Feb 2024
Upload bank affidavit in prescribed formatFile: BANK AFFIDAVIT.pdf17 Feb 2024
What are all the sources of funds to complete the projectFile: Sources off fund.pdf17 Feb 2024
authenticated copy of the RTC obtained from revenue deptFile: rtc.pdf17 Feb 2024
connected MR in favour of landownerFile: MR rectified.pdf17 Feb 2024
Upload Single plot layoutFile: single plot.pdf17 Feb 2024
Upload Single plot layout OrderFile: single plot layout.pdf17 Feb 2024
Upload CDP map showing the proposed siteFile: cdp.pdf17 Feb 2024
Upload village map showing the proposed siteFile: Village map sorahunase.pdf17 Feb 2024
Upload commencement certificateFile: cc new.pdf17 Feb 2024
Please upload the self attested copy of the Engineer license certificate issued by the local DevelopFile: Engineer certificate .pdf17 Feb 2024
Please upload the brief estimated cost of construction certified by the EngineerFile: ENGINEERS CERTIFICATE from 3.pdf17 Feb 2024
Please upload the STP design drawing as per the Guidelines of KSPCB NOC certified by the EngineerFile: stp.pdf17 Feb 2024
Please upload the self-attested copy of the NOC issued by Power SupplyFile: bescom noc.pdf17 Feb 2024
Please upload the self-attested copy of the NOC issued by BWSSBFile: BWSSB NOC.pdf17 Feb 2024
Please upload the Land cost calculation sheet as per the guidance valueFile: Guideline value (1).pdf17 Feb 2024
Please clarify the source of water supply to the project along with the supporting documents and phFile: water.pdf17 Feb 2024
Please mention the project name and project address and upload the project specification certified bFile: PROJECT SPECIFICATIONS (2).pdf17 Feb 2024
Please mention the project name and project address and upload the section 3(1) notarized affidavitFile: 3.pdf17 Feb 2024
RTC, survey New Sy No.69/11 Old Sy No.69/7-
Mutation, survey New Sy No.69/11 Old Sy No.69/7-
Encumbrance Certificate, survey New Sy No.69/11 Old Sy No.69/7-
Conversion/Alienation Order, survey New Sy No.69/11 Old Sy No.69/7-
Sale/Title/Gift Deed, survey New Sy No.69/11 Old Sy No.69/7-
JDA, survey New Sy No.69/11 Old Sy No.69/7-
Khatha, survey New Sy No.69/11 Old Sy No.69/7-
Registration CertificateFile: Print _ Udyam Registration Certificate HITESH S.pdf-
Certificate issued by CA Form 1File: Form_1_CA_Certificate Updated.pdf-
Certificate issued by Architect Form 2File: Form-2_Architect-2-signed.pdf-
Certificate issued by Engineer Form 3File: engineer certificate .pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: AFFIDAVIT 2 non litigation.pdf-
Certificate from Chartered AccountFile: Form_1_CA_Certificate Updated.pdf-
Balance Sheet 2022 - 2023File: NA4 (2).pdf-
Balance Sheet 2021 - 2022File: NA4 (2).pdf-
Balance Sheet 2020 - 2021File: NA4 (2).pdf-
Audited Profit and Loss Statement 2022 - 2023File: NA4 (2).pdf-
Audited Profit and Loss Statement 2021 - 2022File: NA4 (2).pdf-
Audited Profit and Loss Statement 2020 - 2021File: NA4 (2).pdf-
Director's Report 2022 - 2023File: NA4 (2).pdf-
Director's Report 2021 - 2022File: NA4 (2).pdf-
Director's Report 2020 - 2021File: NA4 (2).pdf-
Cash Flow Statement 2022 - 2023File: NA4 (2).pdf-
Cash Flow Statement 2021 - 2022File: NA4 (2).pdf-
Auditor's Report 2022 - 2023File: NA4 (2).pdf-
Auditor's Report 2021 - 2022File: NA4 (2).pdf-
Auditor's Report 2020 - 2021File: NA4 (2).pdf-
Income Tax Return Acknowledgement 2022 - 2023File: IT-22-23_IT-23-24_merged.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: NA4 (2).pdf-
Income Tax Return Acknowledgement 2020 - 2021File: NA4 (2).pdf-
Bulding license and Plan-
BESCOM NOC-
BWSSB NOC-
plan-
plan-
plan-
NA4 (2)-
NA4 (2)-
NA4 (2)-
NA4 (2)-
NA4 (2)-
NA4 (2)-
advocate search report_compressed-
NA4 (2)-
JDA-
NA4 (2)-
NA4 (2)-
Conversation Copy-
NA4 (2)-
SALE AGREEMENT RERA FINAL lotus hill-
Allotment letter new rera-
NA4 (2)-
FROM B AFFIDAVIT CUM DECLARATION (1)-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Lotus Hill on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmLotus HillOther 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: ACROLITH BUILDERS

ACROLITH BUILDERS has 1 registration on RERA Karnataka, including Lotus Hill. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Lotus Hill is delayed beyond 29 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Lotus Hill?

The registered promoter entity is ACROLITH BUILDERS, a proprietorship as per the filing. Its GSTIN 29FHJPS3785R1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Lotus Hill?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Lotus Hill?

The professionals named in the filing: Architect: Mr.Marxia Tamil Selvan; Engineer: Mr.Kumar R; Chartered Accountant: Shubham Dalmia. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lotus Hill?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lotus Hill. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lotus Hill to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.