Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 101 documents Report an error

LAKE WATERS is a Residential/Group Housing project by MARKON HOMES PVT LTD in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/250322/004782 on 25 Mar 2022. Possession is promised by 31 Mar 2025.

At a glance

Project

  • NameLAKE WATERS
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 560087
  • Pincode560087
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/250322/004782
  • ReraGenie IDRG-KA-19736

Builder

  • NameMARKON HOMES PVT LTD
  • Entity typeCompany
  • CINU70100KA2019PTC127428
  • GSTIN29AAMCM9055C1Z5
  • Authorized SignatoryVENKATA RAJASHEKAR REDDY MARAM
  • Managing DirectorVENKATA RAJASHEKAR REDDY MARAM
  • DirectorsSUMALATHA KONDAMURI, VENKATA RAJASHEKAR REDDY MARAM
  • Project HeadVENKATA RAJASHEKAR REDDY MAMRAM

Key dates

this monthRegisteredMar 2022PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 Mar 2022
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block A---26026
Block B---606

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 25 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 25 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,953 sq m
Named landowners4
LandownerVillageDistrict
RAMESH P--
RAMESH P--
RAMESH P--
RAMESH P--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 25.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 18.00 cr-
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 2.00 cr-
Payment of taxesRs 1.50 cr-
On-site expenditure-Site OverheadRs 1.00 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.00 cr-
On-site expenditure-Salaries of workersRs 50.00 lakh-
On-site expenditure-Consultants FeesRs 35.00 lakh-
Payment of feesRs 30.00 lakh-
Payment of PremiumsRs 20.00 lakh-
Payment of chargesRs 10.00 lakh-
Payment of cessRs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB V Narendranath Reddy
EngineerInturi Veeraiah
Chartered AccountantRAGHAVENDRA T N

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed101

As listed on the registration, under the names the promoter filed them with; the newest 80 of 101 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/250322/004782 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
(1.2) chartered accountant certificate for total estimation of project costFile: CA_Cerficate_Form_Total_Estimation.pdf25 Feb 2022
(1.3) Mention CA UDIN for 2019-20 financial statementFile: CA_UDIN_2019_20.pdf25 Feb 2022
(2.1.1) Partition deed in the name ( favor) of Ramesh. P.( Partion deed SY Nos 17,18/2)File: rameshreddy partition deed.pdf25 Feb 2022
(2.1.2) Sale deed in the name of Ramesh. P.( Partion deed SY Nos 15/3A2,15/9(Old SY No 15/2)File: Rameshreddy_Saledeed_15_3A2_And_15_9.pdf25 Feb 2022
2.2 Need notarized Non litigation affidavit on stamp paperFile: NonLitigation_Affidavit.pdf25 Feb 2022
2.3 Need notarized Non affidavit on stamp paper( Repetition)File: NonLitigation_Affidavit.pdf25 Feb 2022
3. 1) Uploaded building drawings are not so clearly visible (1/5)File: 1.pdf25 Feb 2022
3. 1) Uploaded building drawings are not so clearly visible (2/5)File: 2.pdf25 Feb 2022
3. 1) Uploaded building drawings are not so clearly visible (3/5)File: 3.pdf25 Feb 2022
3. 1) Uploaded building drawings are not so clearly visible (4/5)File: 4.pdf25 Feb 2022
3. 1) Uploaded building drawings are not so clearly visible (5/5)File: 5.pdf25 Feb 2022
3. 2) Please upload the relinquishment deed.File: Relinquishment_Deed_Muthasandra.pdf25 Feb 2022
4.4.1) Engineer certificateFile: Engineer Certificate Form 3.pdf25 Feb 2022
4.4.2) Architect certificateFile: Architect Cerficate Form 2.pdf25 Feb 2022
4.4.3) Charted account certificateFile: CA_Cerficate_Form_Total_Estimation.pdf25 Feb 2022
4.5) 3(1) notarized affidavit with RERA acknowledgementFile: 3(1)_Affidavit_with_RERA_ACKNo.pdf25 Feb 2022
4.6) Updated AOSFile: Proforma_AOS_LakeWaters.pdf25 Feb 2022
4.7.1 ) Please upload the STP in the project along with supporting STP demarcated site planFile: STP_Demarkation_LakeWaters.pdf25 Feb 2022
4.7.2 ) STP design documentFile: STP_Drawing_Lake_Waters.pdf25 Feb 2022
4.8) Please upload the attested copy of Water supply NOC.File: Water_NOC_Attested.pdf25 Feb 2022
4.9.1)Please upload the attested copy of KSPCB NOCFile: PCB_NOC_Attested.pdf25 Feb 2022
4.9.2) PCB fee paid receipt.File: PCB_Consent_Fee_Payment.pdf25 Feb 2022
4.9.3) please upload the correct file of BESCOM NOCFile: BESCOM_NOC_Attested.pdf25 Feb 2022
RTC, survey 15/3A2-
Mutation, survey 15/3A2-
Encumbrance Certificate, survey 15/3A2-
Conversion/Alienation Order, survey 15/3A2-
JDA, survey 15/3A2-
Khatha, survey 15/3A2-
RTC, survey 15/9-
Mutation, survey 15/9-
Encumbrance Certificate, survey 15/9-
Conversion/Alienation Order, survey 15/9-
JDA, survey 15/9-
Khatha, survey 15/9-
RTC, survey 17-
Mutation, survey 17-
Encumbrance Certificate, survey 17-
Conversion/Alienation Order, survey 17-
JDA, survey 17-
Khatha, survey 17-
RTC, survey 18/2-
Mutation, survey 18/2-
Encumbrance Certificate, survey 18/2-
Conversion/Alienation Order, survey 18/2-
JDA, survey 18/2-
Khatha, survey 18/2-
Registration CertificateFile: Incorporation Certificate.pdf-
Organization StructureFile: MarkonHomes_Org_Chart.pdf-
Certificate issued by CA Form 1File: CA_Cerficate_Form_Total_Estimation.pdf-
Certificate issued by Architect Form 2File: Architect Cerficate Form 2.pdf-
Certificate issued by Engineer Form 3File: Engineer Certificate Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Joint_Affidavit_cum_Declaration.pdf-
Certificate from Chartered AccountFile: CA_Cerficate_Form_Total_Estimation.pdf-
Balance Sheet 2020 - 2021File: BS 2020-21.pdf-
Balance Sheet 2019 - 2020File: Balance sheet 2019-20.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Audit report 2020-21(1).pdf-
Audited Profit and Loss Statement 2019 - 2020File: Audit report 2019-20(1).pdf-
Director's Report 2020 - 2021File: Directors report 2020-21(1).pdf-
Director's Report 2019 - 2020File: Directors report 2019-20(1).pdf-
Cash Flow Statement 2020 - 2021File: Cash flow statement 2020-21.pdf-
Cash Flow Statement 2019 - 2020File: Cash flow statement 2019-20.pdf-
Auditor's Report 2020 - 2021File: Audit report 2020-21(1).pdf-
Auditor's Report 2019 - 2020File: Audit report 2019-20(1).pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR Acknowledgement 2020-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR Acknowledgement FY-19-20.pdf-
Lakewaters_Comencement_Certificate-
BESCOM_NOC_Mutaasandra,-
Water_NOC_Muthasandra_RERA-
BMRDA_Approval_Drawing-
Site_Plan_Section_Details_LW-
Site_Plan_Section_Details_LW-
Project_Specifications-
Site_Plan_Section_Details_LW-
Area_Development_Plan-
Structural_Stability_Certificate-
Advocate_Search_Report(1)-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep LAKE WATERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmLAKE WATERSOther 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: MARKON HOMES PVT LTD

MARKON HOMES PVT LTD has 1 registration on RERA Karnataka, including LAKE WATERS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if LAKE WATERS is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of LAKE WATERS?

The registered promoter entity is MARKON HOMES PVT LTD, a company as per the filing. Its CIN U70100KA2019PTC127428 and GSTIN 29AAMCM9055C1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in LAKE WATERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at LAKE WATERS?

The professionals named in the filing: Architect: B V Narendranath Reddy; Engineer: Inturi Veeraiah; Chartered Accountant: RAGHAVENDRA T N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAKE WATERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAKE WATERS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAKE WATERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.