Home / Browse projects / Bengaluru Urban, Karnataka / KRK URBAN VILLE
KRK URBAN VILLE
By KRK HOUSING PRIVATE LIMITED
RG-KA-11730 · RERA PRM/KA/RERA/1251/446/PR/311022/005387 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
KRK URBAN VILLE is a Residential/Group Housing project by KRK HOUSING PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/311022/005387 on 31 Oct 2022. Possession is promised by 30 Aug 2026. 156 of the 68 units on this registration are recorded sold or booked, and 4 of 17 construction stages are filed complete.
At a glance
Project
- NameKRK URBAN VILLE
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560087
- Pincode560087
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/311022/005387
- ReraGenie IDRG-KA-11730
Builder
- NameKRK HOUSING PRIVATE LIMITED
- Entity typeCompany
- CINU70109KA2022PTC159671
- GSTIN29AAJCK4379G1Z1
- Authorized SignatoryK. RAGHUNATH
- DirectorsK. RAGHUNATH, K.RAGHUNATH, KANYA RAGHUNATH
- Project HeadK.RAGHUNATH
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on31 Oct 2022
- Promised completion30 Aug 2026
- Revised completionNone
- Buildings67 building records
- Documents filed221 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tulip 1 | - | - | - | 4 | 0 | 4 |
| Tulip 2 | - | - | - | 4 | 0 | 4 |
| Tulip 3 | - | - | - | 4 | 0 | 4 |
| Tulip 4 | - | - | - | 4 | 0 | 4 |
| Tulip 5 | - | - | - | 4 | 0 | 4 |
| Tulip 6 | - | - | - | 4 | 0 | 4 |
| Tulip 7 | - | - | - | 4 | 0 | 4 |
| Tulip 8 | - | - | - | 4 | 0 | 4 |
| Tulip 9 | - | - | - | 4 | 0 | 4 |
| Tulip 10 | - | - | - | 4 | 0 | 4 |
| Tulip 11 | - | - | - | 4 | 0 | 4 |
| Tulip 12 | - | - | - | 4 | 0 | 4 |
| Lily 1 | - | - | - | 4 | 0 | 4 |
| Lily 2 | - | - | - | 4 | 0 | 4 |
| Lily 3 | - | - | - | 4 | 0 | 4 |
| Lily 4 | - | - | - | 4 | 0 | 4 |
| Lily 5 | - | - | - | 4 | 0 | 4 |
| Lily 6 | - | - | - | 4 | 0 | 4 |
| Lily 7 | - | - | - | 4 | 0 | 4 |
| Lily 8 | - | - | - | 4 | 0 | 4 |
| Lily 9 | - | - | - | 4 | 0 | 4 |
| Lily 10 | - | - | - | 4 | 0 | 4 |
| Lily 11 | - | - | - | 4 | 0 | 4 |
| Lily 12 | - | - | - | 4 | 0 | 4 |
| Tulip 13 | - | - | - | 4 | 0 | 4 |
| Tulip 14 | - | - | - | 4 | 0 | 4 |
| Tulip 15 | - | - | - | 4 | 0 | 4 |
| Tulip 16 | - | - | - | 4 | 0 | 4 |
| Tulip 17 | - | - | - | 4 | 0 | 4 |
| Tulip 18 | - | - | - | 4 | 0 | 4 |
| Tulip 19 | - | - | - | 4 | 0 | 4 |
| Tulip 20 | - | - | - | 4 | 0 | 4 |
| Tulip 21 | - | - | - | 4 | 0 | 4 |
| Tulip 22 | - | - | - | 4 | 0 | 4 |
| Tulip 23 | - | - | - | 4 | 0 | 4 |
| Tulip 24 | - | - | - | 4 | 0 | 4 |
| Lily 13 | - | - | - | 4 | 0 | 4 |
| Lily 14 | - | - | - | 4 | 0 | 4 |
| Lily 15 | - | - | - | 4 | 0 | 4 |
| Lily 16 | - | - | - | 4 | 0 | 4 |
| Lily 17 | - | - | - | 4 | 0 | 4 |
| Lily 18 | - | - | - | 4 | 0 | 4 |
| Lily 19 | - | - | - | 4 | 0 | 4 |
| Lily 20 | - | - | - | 4 | 0 | 4 |
| Lily 21 | - | - | - | 4 | 0 | 4 |
| Lily 22 | - | - | - | 4 | 0 | 4 |
| Lily 23 | - | - | - | 4 | 0 | 4 |
| Tulip 25 | - | - | - | 4 | 0 | 4 |
| Tulip 26 | - | - | - | 4 | 0 | 4 |
| Tulip 27 | - | - | - | 4 | 0 | 4 |
| Tulip 28 | - | - | - | 4 | 0 | 4 |
| Tulip 29 | - | - | - | 4 | 0 | 4 |
| Tulip 30 | - | - | - | 4 | 0 | 4 |
| Tulip 31 | - | - | - | 4 | 0 | 4 |
| Tulip 32 | - | - | - | 4 | 0 | 4 |
| Tulip 33 | - | - | - | 4 | 0 | 4 |
| Tulip 34 | - | - | - | 4 | 0 | 4 |
| Lily 24 | - | - | - | 4 | 0 | 4 |
| Lily 25 | - | - | - | 4 | 0 | 4 |
| Lily 26 | - | - | - | 4 | 0 | 4 |
| Lily 27 | - | - | - | 4 | 0 | 4 |
| Lily 28 | - | - | - | 4 | 0 | 4 |
| Lily 29 | - | - | - | 4 | 0 | 4 |
| Lily 30 | - | - | - | 4 | 0 | 4 |
| Lily 31 | - | - | - | 4 | 0 | 4 |
| Lily 32 | - | - | - | 4 | 0 | 4 |
| Lily 33 | - | - | - | 4 | 0 | 4 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 17 construction stages are filed complete. The stage furthest along is Electrification, at 97%.
Building: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 80% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 85% |
| Plastering inside , outside & Ceiling | 80% |
| Joinery: Doors, Windows, Ventilators etc | 80% |
| Basic work of Water supply, Sanitary and Electrification | 70% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 60% |
| Railing and Grill fixing | 50% |
| Electrification, Water supply and Sanitary Finishing | 97% |
| Painting | 95% |
| Fire prevention and fire fighting fitting and fixture with network | 95% |
| Weather Proof work(tile,concrete) | 85% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 85% |
| Internal and External work including landscapes as per sanctioned drawings | 85% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 95% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 90% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Solid waste management and disposal | Yes | 90% |
| Emergency Evacuation services | Yes | 90% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 90% |
| Storm water drains | Yes | 90% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 90% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 90% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 95% |
| Club House | Yes | 95% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 90% |
| Indoor Sports facility | Yes | 90% |
| Swimming Pool | Yes | 90% |
| Gym | Yes | 90% |
| Parks | Yes | 100% |
| Power Backup | Yes | 95% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 95% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | Yes | 95% |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | Yes | 100% |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 100% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 95% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| K. RAGHUNATH | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 42.00 cr | Rs 35.70 cr |
| Administrative cost | Rs 13.00 cr | Rs 11.05 cr |
| Payment of taxes | Rs 7.50 cr | Rs 6.38 cr |
| On-site expenditure-Consultants Fees | Rs 40.00 lakh | Rs 34.00 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | HARSHA. K |
| Engineer | S LAKSHMIKANTHA |
| Chartered Accountant | Suresh Babu N |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed221
As listed on the registration, under the names the promoter filed them with; the newest 80 of 221 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/311022/005387 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: KRK RERA CA CERT Sep 26.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: KRK ENGINEER Sep 26.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: KRK ENGINEER Sep 26.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| NOC RENEWAL CLARIFICATION AFFIDAVITFile: Noc clarification affidavit.pdf | 30 Sep 2026 |
| ENGINEER SELF ATTESTED LICENSE COPYFile: UNO ENGR LICENSE CERT SELF ATT.pdf | 15 Sep 2026 |
| APARTMENT PLANFile: Apartment plan.pdf | 15 Sep 2026 |
| SOLD UNITS DETAILSFile: sold units details.pdf | 15 Sep 2026 |
| UNSOLD UNITS DETAILSFile: unsold units details.pdf | 15 Sep 2026 |
| FORM B AFFIDAVITFile: Form B affidavit KRK.pdf | 15 Sep 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: KRK RERA CA CERT June 26.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: KRK ENGINEER June 26.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: KRK ENGINEER June 26.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: KRK RERA CA CERT Mar 26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Engineer Certificate KRK Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate KRK Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: KRK RERA CA CERT Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: KRK ENGINEER Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: KRK ENGINEER Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Registered GPAFile: GPA_compressed (1).pdf | 21 Oct 2022 |
| JD AffidavitFile: JD affidavit.pdf | 21 Oct 2022 |
| Non litigation affidavitFile: No Litigation Affidavit to RERA.pdf | 21 Oct 2022 |
| balcony area detailsFile: Balcony area mentioned in the project details page not matching with the sanction plan cla | 21 Oct 2022 |
| cdp map revisedFile: CDP MAP REVISED.pdf | 21 Oct 2022 |
| total area clarificationFile: Total area mentioned in the Area details page not matching with the sanction plan clarify. | 21 Oct 2022 |
| bwssb nocFile: BWSSB NOC.pdf | 21 Oct 2022 |
| kspcb nocFile: KSPCB NOC.pdf | 21 Oct 2022 |
| bescom nocFile: bescom noc.pdf | 21 Oct 2022 |
| development planFile: Development plan.PDF | 21 Oct 2022 |
| elevation planFile: elevation1.pdf | 21 Oct 2022 |
| elevation plan 1File: elevation2.pdf | 21 Oct 2022 |
| elevation plan 2File: elevation3.pdf | 21 Oct 2022 |
| work orderFile: Work order.pdf | 21 Oct 2022 |
| typicl planFile: Typicl plan.PDF | 21 Oct 2022 |
| demarked planFile: Demarked plan.pdf | 21 Oct 2022 |
| KRK OC Phase 1File: KRK-UV-OCCUPANCY CERTIFICATE phase 1.pdf | 21 Oct 2022 |
| Relinquishment deedFile: RELINQUISHMENT DEED.pdf | 21 Oct 2022 |
| noc renewal clarification letterFile: renewal clarification letter.pdf | 21 Oct 2022 |
| stpFile: KRK Urban ville-STP.pdf | 21 Oct 2022 |
| sanctioned plan demarcationFile: sanctioned plan demacation.pdf | 21 Oct 2022 |
| CDP MAPFile: CDP Map.PDF | 21 Oct 2022 |
| TITLE DEEDFile: KRK UV-SY-NO-9&11-2-GIFT DEED-K RAGHUANTH.PDF | 14 Aug 2022 |
| TITLE DEED 1File: TITLE DEED SY-9-DOCUMENT NO - 6773.pdf | 14 Aug 2022 |
| TITLE DEED 2File: TITLE DEED SY-11-2-DOCUMENT NO-6774.pdf | 14 Aug 2022 |
| CLARIFICATIONFile: Revenue clarification.pdf | 14 Aug 2022 |
| TOTAL AREA CLARIFICATIONFile: Total area mentioned in the Area details page not matching with the sanction plan clarify. | 14 Aug 2022 |
| cc clarificationFile: CC.pdf | 14 Aug 2022 |
| cdpFile: CDP Map.pdf | 14 Aug 2022 |
| take over agreementFile: KRK-Takeover agreement.pdf | 14 Aug 2022 |
| nocFile: KSPCB NOC.pdf | 14 Aug 2022 |
| receiptFile: KSPCB NOC Fee receipt.pdf | 14 Aug 2022 |
| BWSSB NOCFile: BWSSB NOC.pdf | 14 Aug 2022 |
| BESCOM NOCFile: bescom noc.pdf | 14 Aug 2022 |
| Guidance valueFile: guidance value certificate_compressed.pdf | 14 Aug 2022 |
| parking detailsFile: Two wheelers parking details.pdf | 14 Aug 2022 |
| demark planFile: Demarked plan.pdf | 14 Aug 2022 |
| clarification letterFile: POINT NO-06 Clarification Letter to RERA.pdf | 14 Aug 2022 |
| work orderFile: Work order.pdf | 14 Aug 2022 |
| all plan 1File: 02.PDF | 14 Aug 2022 |
| all plan 2File: 01.PDF | 14 Aug 2022 |
| mapFile: Map.pdf | 14 Aug 2022 |
| elevation plan 1File: elevation1.pdf | 14 Aug 2022 |
| elevation plan 2File: elevation2.pdf | 14 Aug 2022 |
| elevation plan 3File: elevation3.pdf | 14 Aug 2022 |
| typical planFile: Typicl plan.PDF | 14 Aug 2022 |
| demarcation planFile: sanctioned plan demacation.pdf | 14 Aug 2022 |
| revised CDP mapFile: CDP MAP REVISED.pdf | 14 Aug 2022 |
| Clarification letterFile: Balcony area mentioned in the project details page not matching with the sanction plan cla | 14 Aug 2022 |
| AOS as per RERAFile: Agreement of Sale Proforma as per RERA.pdf | 21 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep KRK URBAN VILLE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 83 registered projects within 2 km.
Prestige Lavender Fields
Prestige Office Ventures
Brigade Sanctuary
Brigade Enterprises Ltd
MYHNA VISTARA
MYHNA PROPERTIES PRIVATE LIMITED
ABHEE AARIA
ABHEE VENTURES PRIVATE LIMITED
ABHEE CITY URBAN GLENN PHASE II
ABHEE VENTURES PRIVATE LIMITED
GODREJ PARK RETREAT
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: KRK HOUSING PRIVATE LIMITED
KRK HOUSING PRIVATE LIMITED has 1 registration on RERA Karnataka, including KRK URBAN VILLE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if KRK URBAN VILLE is delayed beyond 30 Aug 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of KRK URBAN VILLE?
The registered promoter entity is KRK HOUSING PRIVATE LIMITED, a company as per the filing. Its CIN U70109KA2022PTC159671 and GSTIN 29AAJCK4379G1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in KRK URBAN VILLE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at KRK URBAN VILLE?
The professionals named in the filing: Architect: HARSHA. K; Engineer: S LAKSHMIKANTHA; Chartered Accountant: Suresh Babu N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KRK URBAN VILLE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback