Kapstone CREST
RG-KA-54925 · RERA PRM/KA/RERA/1249/447/PR/031125/008213 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Kapstone CREST is a Residential/Group Housing project by K P INFRA VENTURES in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/031125/008213 on 3 Nov 2025. Possession is promised by 14 Sep 2028. 8 of the 40 units on this registration are recorded sold or booked, and 4 of 16 construction stages are filed complete.
At a glance
Project
- NameKapstone CREST
- TypeResidential/Group Housing
- Location
- Belagavi
- 590003
- Pincode590003
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1249/447/PR/031125/008213
- ReraGenie IDRG-KA-54925
Builder
- NameK P INFRA VENTURES
- Entity typePartnership Firm
- GSTIN29AAXFK3053C1Z4
- Authorized SignatoryCHAITANYA GANAPATRAO KULKARNI
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on3 Nov 2025
- Promised completion14 Sep 2028
- Revised completionNone
- Buildings1 building record
- Documents filed110 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kapstone CREST | - | - | - | - | - | 40 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 16 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 90%.
Building: 50% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 80% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 90% |
| Masonry Construction | 80% |
| Plastering inside , outside & Ceiling | 70% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 50% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 25% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 50% |
| Lifts | Yes | 50% |
| Corridor/Lobbies | Yes | 50% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 15% |
| Basement | Yes | 80% |
| Terrace | Yes | 30% |
| Outer Wall | Yes | 90% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| K P INFRA VENTURES | - | - |
| K P INFRA VENTURES | - | - |
| UDAY GANAPATRAO CHIVATE | - | - |
| PRAKASH GANAPATRAO CHIVATE | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 9.12 cr | Rs 6.85 cr |
| LAND COST OF PURCHASED PROPERTIES | Rs 2.13 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aaishwarya Lad |
| Engineer | VINAY J BEHERE |
| Chartered Accountant | Shrinivas Deshpande |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed110
As listed on the registration, under the names the promoter filed them with; the newest 80 of 110 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/031125/008213 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: KP Form 4.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Ar Certificate KP.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Kapstone Crest-Form 6 Engineer's certificate.pdf | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: KP FORM 4.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: KP Ar FORM 5.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: KP FORM 4.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Kapstone Crest Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Kapstone Ar Form 5.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Kapstone Er Form 6.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: FORM 5 Ar Kapstone.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 Er Kapstone.pdf | 15 Jan 2026 |
| Amalgamation layout copy by the BUDA bearing no. CR15-2024-25/1750 date:04/09/2024File: Amalgamation Permmision Dwg.jpg | 26 Sep 2025 |
| Amalgamation oder copy by the BUDA bearing no. CR15-2024-25/1750 date:04/09/2024File: Amalgamation Permmision Copy.pdf | 26 Sep 2025 |
| ADLR Certified survey sketch/CTS MAPFile: Map.pdf | 26 Sep 2025 |
| Site area, set back area clarificatioinFile: site & setback clarification.pdf | 26 Sep 2025 |
| CFEFile: CFE.pdf | 26 Sep 2025 |
| STP drawing as per the guidelines of KSPCB only duly mentioning the project name and address alongFile: Sweage Treatment Plant.pdf | 26 Sep 2025 |
| land cost calculation sheetFile: Land cost.pdf | 26 Sep 2025 |
| upload HESCOM NOCFile: HESCOM NOC.pdf | 26 Sep 2025 |
| drinking water facilities(NOC from concern authority)File: Water NOC & Hescom Affidavit.pdf | 26 Sep 2025 |
| Partition title deed of the current landowner For CTS Number 2222/1 & 2222/2File: TITLE DEED.pdf | 26 Sep 2025 |
| TRANSLATION OF PARTITION DEEN IN KANNADAFile: TRANSLATE TITLE PRATITION DEED.pdf | 26 Sep 2025 |
| What are all sources of fund to complete the project with supporting documentsFile: 1-Fund sources.pdf | 26 Aug 2025 |
| Loan amount should be credited to designated bank account as per notification of the authorityFile: 2&3- Credit account.pdf | 26 Aug 2025 |
| Loan amount should be deposited into RERA designated account as per notification dated 19/07/2023File: 2&3- Credit account.pdf | 26 Aug 2025 |
| Single Plot layout plan&oder copyFile: 01 Single Plot Layout.pdf | 26 Aug 2025 |
| ADLR Certified survey sketchFile: 03 ADLR.pdf | 26 Aug 2025 |
| Site area, set back area description in approved plan is not matching to LBPASS order copyFile: 04 Site area & Set back descreption.pdf | 26 Aug 2025 |
| CFEFile: 05 CFE.pdf | 26 Aug 2025 |
| fire fighting facilities, drinking water facilities, emergency services and use of renewable energyFile: 06 Fire Water.pdf | 26 Aug 2025 |
| HESCOM NOCFile: 04 HESCOM NOC.pdf | 26 Aug 2025 |
| Proforma of agreement (AFS) for saleFile: Agreement of Sale.pdf | 26 Aug 2025 |
| Water supply NOC- applied for noc to be resived yetFile: Water NOC reply.pdf | 26 Aug 2025 |
| the total cost including land cost is shown as 11,25,10,877.00File: 06 cost details.pdf | 26 Aug 2025 |
| Kindly upload the STP design drawing certified by the Engineer with full project name and address asFile: 07 STP Drawing Certified by Engineer.pdf | 26 Aug 2025 |
| STP design drawingFile: 08 LAND COST.pdf | 26 Aug 2025 |
| STP DRAWINGFile: STP DRAWING.pdf | 26 Aug 2025 |
| What are all sources of fund to complete the project with supporting documentsFile: 1Fund sources.pdf | 7 Jul 2025 |
| latest katha extract For CTS Number 2221/2 in name of current ownerFile: A1 KATHA EXTRACT 2221-2.pdf | 7 Jul 2025 |
| title deed of the current landowner For CTS Number 2222/1 & 2222/2File: A2 TITLE DEED.pdf | 7 Jul 2025 |
| date of completion of the project need to be mentioned in DDMMYYYY format in form-B affidavitFile: A3 Form B.pdf | 7 Jul 2025 |
| Approved Original Single Plot layout planFile: B1 Amalgamation Permmision Dwg.pdf | 7 Jul 2025 |
| Approved Original Single Plot layout plan orderFile: B2 Amalgamation Permmision Copy.pdf | 7 Jul 2025 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: B4 ADLR.pdf | 7 Jul 2025 |
| Location details of the project , with clear demarcation of land dedicated for the project along witFile: B - 5.png | 7 Jul 2025 |
| Building License from Local Authority Original CopyFile: B3 Building License.pdf | 7 Jul 2025 |
| Site area, set back area description in approved plan is not matching to LBPASS order copyFile: B6.pdf | 7 Jul 2025 |
| Approved building plan - Original CopyFile: B7 & 8 Approval Building Plan.pdf | 7 Jul 2025 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: B7 & 8 Approval Building Plan.pdf | 7 Jul 2025 |
| Upload commencement certificateFile: B9 Commencement Certificate.pdf | 7 Jul 2025 |
| Demarcation of proposed land in Approved Master plan Certified by the competent authorityFile: B - 10.png | 7 Jul 2025 |
| Demarcation of proposed land in original Village map certified by the competent authorityFile: B11 Village Map.pdf | 7 Jul 2025 |
| KSPCB NOCFile: B12.pdf | 7 Jul 2025 |
| Details of facilities provided thereof including fire fighting facilities, drinking water facilitiesFile: B14.pdf | 7 Jul 2025 |
| Uploaded Engineer licence certificate validityFile: C3 Engineer Lic.pdf | 7 Jul 2025 |
| Kindly upload the Proforma of agreement (AFS) for saleFile: C 4 Agreement of Sale.pdf | 7 Jul 2025 |
| The contents of the uploaded Notorized affidavit 3(1)File: C 5 Affidavit Violation.pdf | 7 Jul 2025 |
| Upload ESCOM NOCFile: C6 Hescom.pdf | 7 Jul 2025 |
| Upload Water supply NOCFile: C7 Water.pdf | 7 Jul 2025 |
| Upload brief project estimation with licenced engineer signatureFile: C8 Estimation.pdf | 7 Jul 2025 |
| Kindly upload the STP design drawing certifiedFile: C9.pdf | 7 Jul 2025 |
| Please upload the Land cost calculation sheet as per the guidance valueFile: C10.pdf | 7 Jul 2025 |
| Registration CertificateFile: Annexure - 1 Certificate of Registration Of Firm.pdf | - |
| GST CertificateFile: Annexure - 3 KP Infra_GST Certificate.pdf | - |
| Partnership DeedFile: Annexure -24 Patnerrship Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: FORM 1.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Annexure 49 Notarized Affidavait.pdf | - |
| Balance Sheet 2023 - 2024File: Annexure - 70 Balance sheet 23-24.pdf | - |
| Balance Sheet 2022 - 2023File: Annexure - 70 Balance sheet 22-23.pdf | - |
| Balance Sheet 2021 - 2022File: Annexure - 70 Balance sheet 21-22.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Annexure - 71 Profit & Loss 23-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Annexure - 71 Profit & Loss 22-23.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep Kapstone CREST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Filed coordinates, straight-line distance. 43 registered projects within 2 km.
SHREE MAHALAXMI RESIDENCY
SHREE MANGESH CONSTRUCTIONS PROP. JAYANT S
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
See every Belagavi project, with the district possession charts
Builder: K P INFRA VENTURES
K P INFRA VENTURES has 1 registration on RERA Karnataka, including Kapstone CREST. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if Kapstone CREST is delayed beyond 14 Sep 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Kapstone CREST?
The registered promoter entity is K P INFRA VENTURES, a partnership firm as per the filing. Its GSTIN 29AAXFK3053C1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Kapstone CREST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Kapstone CREST?
The professionals named in the filing: Architect: Aaishwarya Lad; Engineer: VINAY J BEHERE; Chartered Accountant: Shrinivas Deshpande. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kapstone CREST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback