Home / Browse projects / Bengaluru Urban, Karnataka / JRC KANSO

Registration approved No litigation declared Residential/Group Housing project

JRC KANSO

By M/s JRC Projects

RG-KA-69981 · RERA PRM/KA/RERA/1251/308/PR/250526/008679 · Last updated on RERA Karnataka portal: 19 May 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2031Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 116 documents Report an error

JRC KANSO is a Residential/Group Housing project by M/s JRC Projects in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/250526/008679 on 25 May 2026. Possession is promised by 28 Mar 2031.

At a glance

Project

  • NameJRC KANSO
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 562125
  • Pincode562125
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/250526/008679
  • ReraGenie IDRG-KA-69981

Builder

  • NameM/s JRC Projects
  • Entity typePartnership Firm
  • GSTIN29AALFJ7178H1ZP
  • Authorized SignatoryBobbala Chinnola Manohar Reddy
  • Other registrations1 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredMay 2026PromisedMar 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 May 2026
  • Promised completion28 Mar 2031
  • Revised completionNone
  • Buildings6 building records
  • Documents filed116 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building-1---16016
Building-2---24024
Building-3---20020
Building-4---20020
Building-5---24024
Building-6---18018

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership38

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area29,603 sq m
Named landowners38
LandownerVillageDistrict
Maddela Sreenivasa Reddy--
Katha Rajasekhara Reddy--
Jampana Venkata Madhusudhana Reddy--
Prashanth Nilogal--
Tarigopula Prabhakar Reddy--
Srikanth Thummala--
Guntur Subramanyam Naidu--
Poreddy Venkata Nagendra Natha Reddy--
Palleti Avinash Reddy--
Ravindra Reddy P--
Bindu Lumen--
S Roshini--
Sreekanth Namburi--
Sirisha Kalva--
Praveen Yethapu--
Naveen Kumar Koneru--
Mukkamalla Thulasiswara Reddy--
Badagani Dodda Sreeramulu--
Surendranatha Reddy Gangula--
G Ramaprasad--
Koneti Eswararaju--
Koneti Brahmaiah--
Vinaykumar Siddappa Kage--
Arikatla Sreenivasa Reddy--
Venkata Rajeswara Reddy Katha--
Bujala Narayanamma--
Thota Laksmi Narayana Reddy--
Baisa Sridhar--
Pokala Venkatramaiah--
Thammisetty Moulika--
Lanka Lakshmi Satya Sarada--
Dhanashri Badigera--
Palabathuni Venkata Raja Sekhar--
Kotra Suryanarayana--
Katha Rajasekhara Reddy--
Shekar Narayan Reddy--
Lokesh R--
Lokesh R--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 287.88 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 257.66 cr-
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 9.50 cr-
Administrative CostsRs 9.18 cr-
Payment of taxesRs 7.88 cr-
On-site expenditure-Consultants FeesRs 3.67 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSyed Talal Mohiuddin
EngineerGunasheel Karanth Krishna
Chartered AccountantKatukoori Sanjeeva Reddy

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed116

As listed on the registration, under the names the promoter filed them with; the newest 80 of 116 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/250526/008679 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Reply to QueryFile: Reply to Query.pdf19 May 2026
Legal Opinion - Sy No 45-6-17-18-19File: 1 Legal Opinion - Sy No 45-6-17-18-19.pdf19 May 2026
Legal Opinion - Sy No 45-7File: 1 Legal Opinion - Sy No 45-7.pdf19 May 2026
Legal Opinion - Sy No 45-8File: 1 Legal Opinion - Sy No 45-8.pdf19 May 2026
Proforma of Agreement for SaleFile: 3 Proforma of Agreement for Sale.pdf19 May 2026
Proforma of Allotment LetterFile: 4 Proforma of Allotment Letter.pdf19 May 2026
SEIAA NOC and declaration for No of Units and BUAFile: 5 SEIAA NOC and declaration for No of Units and BUA.pdf19 May 2026
STP DrawingFile: 6 STP Drawing.pdf19 May 2026
JRC Kanso Land Cost Calculation SheetFile: 7 JRC Kanso Land Cost Calculation Sheet.pdf19 May 2026
JRC KANSO - Guidance Value CertificateFile: 7 JRC KANSO - Guidance Value Certificate.pdf19 May 2026
Building LicenseFile: Building License.pdf19 May 2026
RTC, survey 45/6-
Mutation, survey 45/6-
Encumbrance Certificate, survey 45/6-
Conversion/Alienation Order, survey 45/6-
JDA, survey 45/6-
Khatha, survey 45/6-
RTC, survey 45/7-
Mutation, survey 45/7-
Encumbrance Certificate, survey 45/7-
Conversion/Alienation Order, survey 45/7-
JDA, survey 45/7-
Khatha, survey 45/7-
RTC, survey 45/8-
Mutation, survey 45/8-
Encumbrance Certificate, survey 45/8-
Conversion/Alienation Order, survey 45/8-
JDA, survey 45/8-
Khatha, survey 45/8-
RTC, survey 45/17-
Mutation, survey 45/17-
Encumbrance Certificate, survey 45/17-
Conversion/Alienation Order, survey 45/17-
JDA, survey 45/17-
Khatha, survey 45/17-
RTC, survey 45/18-
Mutation, survey 45/18-
Encumbrance Certificate, survey 45/18-
Conversion/Alienation Order, survey 45/18-
JDA, survey 45/18-
Khatha, survey 45/18-
RTC, survey 45/19-
Mutation, survey 45/19-
Encumbrance Certificate, survey 45/19-
Conversion/Alienation Order, survey 45/19-
JDA, survey 45/19-
Khatha, survey 45/19-
Registration CertificateFile: JRC Projects-Firm Registration Certificate.pdf-
GST CertificateFile: JRC Projects-GST Certificate.pdf-
Partnership DeedFile: JRC Projects-Partnership Deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: JRC KANSO Form 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: JRC KANSO-Form 2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: JRC KANSO-Form 3 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: JRC KANSO-Non Litigation Affidavit.pdf-
Balance Sheet 2024 - 2025File: JRC Projects Balance Sheet FY 2024-25.pdf-
Balance Sheet 2023 - 2024File: JRC Projects Balance Sheet FY 2023-24.pdf-
Balance Sheet 2022 - 2023File: JRC Projects Balance Sheet FY 2022-23.pdf-
Audited Profit and Loss Statement 2024 - 2025File: JRC Projects Profit and Loss FY 2024-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: JRC Projects Profit and Loss FY 2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: JRC Projects Profit and Loss FY 2022-23.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: JRC Projects ITR FY 2024-25.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: JRC Projects ITR FY 2023-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: JRC Projects ITR FY 2022-23.pdf-
JRC KANSO-Commencement Certificate-
JRC KANSO-Site Plan, Section and Elevation Plan-
JRC KANSO-Site Plan, Section and Elevation Plan-
JRC KANSO-Structural Stability Certificate and License-
JRC KANSO-Project Specifications-
JRC KANSO Brochure Declaration-
JRC KANSO - Relinquishment Deed for Parks, Road-
JRC KANSO-Form B Affidavit-
JRC KANSO-Section 3(1) Non-Violation Affidavit-
JRC KANSO-JDA Affidavit-
JRC KANSO-BESCOM NOC with fee paid receipt-

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet3 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
JRC Wild Woods Phase IIISy Nos. 31, 32, 110 and 111/2 of Rayasandra Village , Sarjapura Hobli Anekal Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560099OngoingNov 2028Not due yet
JRC SANZIOSy.no1/3 of Bilchikkanahalli Village, Sarjapura - 1 Hobli , Anekal Taluk, Bangalore Urban District. , Anekal , Bengaluru Urban, Karnataka - 562125OngoingDec 2027Not due yet
JRC Wild Woods building 2Sy Nos. 31, 32, 110 and 111/2 of Rayasandra Village , Sarjapura Hobli Anekal Taluk, Bangalore Urban District 560099 , Anekal , Bengaluru Urban, Karnataka - 560099Completed-No date filed
JRC WILD WOODSSy No. 111/2 & 110, Rayasandra Village , Sarjapur Hobli, Anekal Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560061Completed-No date filed
JRC Palladio Phase 2Sy. No. 5/3, 7/2, 19/1, 19/2, 19/3, 20/2, 21/2, 21/3, 21/4, 21/6, 22/1, 22/2, 22/3 & 22/4 of Billachikkanahalli Village , Sarjapura Hobli, Anekal Taluk, Bengaluru Urban , Anekal , Bengaluru Urban, Karnataka - 562125Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep JRC KANSO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmJRC KANSOOther 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: M/s JRC Projects

M/s JRC Projects has 2 registrations on RERA Karnataka, including JRC KANSO and JRC Wild Woods Phase III. Its filings declare 5 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if JRC KANSO is delayed beyond 28 Mar 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of JRC KANSO?

The registered promoter entity is M/s JRC Projects, a partnership firm as per the filing. Its GSTIN 29AALFJ7178H1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in JRC KANSO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at JRC KANSO?

The professionals named in the filing: Architect: Syed Talal Mohiuddin; Engineer: Gunasheel Karanth Krishna; Chartered Accountant: Katukoori Sanjeeva Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JRC KANSO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JRC KANSO. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JRC KANSO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.