RG-KA-67068 · RERA PRM/KA/RERA/1249/447/PR/041123/006368 · Last updated on RERA Karnataka portal: 11 Oct 2023
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
JINENDRA ENCLAVE is a Residential/Group Housing project by DHARANI BUILDERS AND DEVELOPERS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/041123/006368 on 4 Nov 2023. Possession is promised by 30 Jun 2026.
At a glance
Project
- NameJINENDRA ENCLAVE
- TypeResidential/Group Housing
- Location
- Belagavi
- PincodeNot stated
- RERA no.PRM/KA/RERA/1249/447/PR/041123/006368
- ReraGenie IDRG-KA-67068
Builder
- NameDHARANI BUILDERS AND DEVELOPERS
- Entity typeProprietorship
- GSTIN29ANTPG5948F1ZE
- Authorized SignatoryMR. DHARNENDRA CHAMU GHANTI
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on4 Nov 2023
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed95 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| JINENDRA ENCLAVE | - | - | - | 20 | 0 | 20 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 11 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 11 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| AJITKUMAR ANNARAO INCHAL | - | - |
| DEEPAK JINAPPA WADAGAVE | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 1.90 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. CHAITANYA S CHOUGULE |
| Engineer | Er. SUNIL KUMANNA CHOUGULE |
| Chartered Accountant | KUNTUSAGAR VASUDEV HARADI |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed95
As listed on the registration, under the names the promoter filed them with; the newest 80 of 95 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/041123/006368 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Proprietorship registration certificateFile: Udyam Registration Certificate.pdf | 11 Oct 2023 |
| profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along with scheduFile: P&L 2021.pdf | 11 Oct 2023 |
| profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along with scheduFile: P&L 2022.pdf | 11 Oct 2023 |
| profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along with scheduFile: P&L 2023.pdf | 11 Oct 2023 |
| sources of funds to complete the projectFile: Source of Funds Revised PDF.pdf | 11 Oct 2023 |
| Designated bank account number not matched with CA certificateFile: Form-1, CA (PR) PDF.pdf | 11 Oct 2023 |
| Latest EncumbrancrFile: EC New.pdf | 11 Oct 2023 |
| Schedules of Financial StatementFile: Declaration of Schedules PDF.pdf | 11 Oct 2023 |
| Upload Proprietorship registration certificateFile: GST Certificate (1).pdf | 23 Aug 2023 |
| Upload Proprietorship registration certificateFile: Self Declaration of Proprietorship PDF.pdf | 23 Aug 2023 |
| 2021-22 with CA UDIN along with SchedulesFile: Financial.pdf | 23 Aug 2023 |
| Upload profit and loss account and balance sheet, 2019-20,File: 2019-20.pdf | 23 Aug 2023 |
| What are all the sources of funds to complete the projectFile: Source of Funds Revised.pdf | 23 Aug 2023 |
| Designated bank account number not matched with CA certificateFile: Rectification of RERA Account Jinendra Enclave.pdf | 23 Aug 2023 |
| loaded EConly for the date 1-1-2020 bUT NOT UPLOADED ec as requested from 1-4-2005 till dateFile: EC 2004 to 2023.pdf | 23 Aug 2023 |
| Uploded document in No 6 is notproperly visible need toupload clearly visible deedFile: Title Deed Clear Copy_compressed.pdf | 23 Aug 2023 |
| advocate search reportFile: Advocate Search Report_compressed.pdf | 23 Aug 2023 |
| Upload Renewed Building LicenseFile: Plan Extension Certificate.pdf | 23 Aug 2023 |
| Upload all renewed sanctioned drawings Floor plans, sectional drawings and elevationsFile: Clariication of Sanctioned Drawings PDF_removed.pdf | 23 Aug 2023 |
| Upload commencement certificateFile: Plan Extension Certificate.pdf | 23 Aug 2023 |
| Uploaded demarcation drawing. Therefore Please upload the STP/Septic Tank, Soak pit, and sewer lineFile: STP DRAWING JINENDRA ENCLAVE.pdf | 23 Aug 2023 |
| Uploaded demarcation drawing. Therefore Please upload the STP/Septic Tank, Soak pit, and sewer lineFile: STP Demarcation.pdf | 23 Aug 2023 |
| Since the project is ongoing, Please upload Form-6, Engineer certificate.File: F6 Engineer (PR) Jinendra Enclave PDF.pdf | 23 Aug 2023 |
| Upload Proprietorship registration certificate.File: Self Declaration of Proprietorship PDF.pdf | 27 Jul 2023 |
| Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: Financial.pdf | 27 Jul 2023 |
| What are all the sources of funds to complete the project? With supporting documents.File: Declaration of Source of Funds PDF.pdf | 27 Jul 2023 |
| Designated bank account number not matched with CA certificate. Hence NOT OKFile: Declaration of RERA Account PDF.pdf | 27 Jul 2023 |
| EC NOT UPLOADED FRON 1/4/2005 TO TILL DATEFile: Nil Encumbrance 2020.pdf | 27 Jul 2023 |
| TITLE DEED SHOWING FLOW OF RIGHTS FROM PREVIOUS OWNER TO AJITKUMAR NOT UPLOADEDFile: Flow of Title to Arunkumar.pdf | 27 Jul 2023 |
| DEPONENTS NEED TO SIGN ON EVERY PAGE OF THE AFFIDAVIT IN jd cum AFFIDIVAT HENCE NOT OKFile: JD Cum Declaration.pdf | 27 Jul 2023 |
| Built up area of individual details not mentioned in the certified list.File: Built-Up Area Details Certified PDF.pdf | 27 Jul 2023 |
| Please upload the valid Engineer license certificate.File: Engineer Licence Copy.pdf | 27 Jul 2023 |
| Please upload a copy of the notarized section 3(1) affidavit self-attestation with a seal.File: Non-Violation 3-1.pdf | 27 Jul 2023 |
| Please upload the attested copy of the water supply NOC along with a copy of the fee receipt paid toFile: Water NOC Copy.pdf | 27 Jul 2023 |
| In the letter, it was mentioned regarding bore well, please upload the permission letter issued by KFile: Self Declration of KGWA for Jinendra Enclave PDF.pdf | 27 Jul 2023 |
| Please upload the STP/Septic Tank, Soak pit, and sewer line drawing certified by the Engineer.File: STP Demarcation.pdf | 27 Jul 2023 |
| Please upload Form-6, Engineer certificate.File: Self Declaration of Not applcable of Form No-6 PDF.pdf | 27 Jul 2023 |
| Please update the timeline completion date in the relevant Para and upload the proforma of the AgreeFile: Agreement of Sale Proforma Jinendra Enclave PDF.pdf | 27 Jul 2023 |
| Please upload the Land cost calculation sheet as per the guidance values(signed copy).File: Self Declration of Land Value Calculaion for Jinendra Enclave PDF.pdf | 27 Jul 2023 |
| Please upload the NOC issued by Power Supply along with the copy of the fee receipt.File: HESCOM NOC.pdf | 27 Jul 2023 |
| Please upload the reason for the delay in RERA registration along with the sold and unsold details (File: Declaration of Sold Unsold and Start Date.pdf | 27 Jul 2023 |
| Please upload the attested copy of the water supply NOC along with a copy of the fee receipt paid toFile: Declaration of Misplace Fee Receipt of Water NOC.pdf | 27 Jul 2023 |
| Registration CertificateFile: GST Certificate (1).pdf | - |
| Certificate issued by CA Form 1File: Form-1, CA (PR).pdf | - |
| Certificate issued by Architect Form 2File: Form No-2 Architect PR PDF.pdf | - |
| Certificate issued by Engineer Form 3File: Form-3, Engineer PDF.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non-Litigation.pdf | - |
| Certificate from Chartered AccountFile: Form-1, CA (PR).pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: 2020-21.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: 2019-2020.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: 2018-2019.pdf | - |
| Building Commencement | - |
| Water NOC Copy | - |
| Approved Plan Copy | - |
| Sectional Drawing Fnal Copy | - |
| Project Specification of Jinendra Enclave PDF | - |
| Stability Certificate | - |
| JDA Copy_compressed | - |
| Amalagmation Order & Plan Copy | - |
| Self Declration of DC Conversion for Jinendra Enclave PDF | - |
| GPA Copy | - |
| Agreement of Sale Proforma Jinendra Enclave PDF | - |
| ALLOTMENT LETTER JINENDRA ENCLAVE PDF | - |
| Form No-B Affidavit_compressed | - |
| Section 3_1 Non-Violation | - |
| JD Cum Declaration Affidavit | - |
| Water NOC Copy | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| KSPCB NOC Copy_compressed | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep JINENDRA ENCLAVE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: DHARANI BUILDERS AND DEVELOPERS
DHARANI BUILDERS AND DEVELOPERS has 1 registration on RERA Karnataka, including JINENDRA ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if JINENDRA ENCLAVE is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of JINENDRA ENCLAVE?
The registered promoter entity is DHARANI BUILDERS AND DEVELOPERS, a proprietorship as per the filing. Its GSTIN 29ANTPG5948F1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in JINENDRA ENCLAVE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at JINENDRA ENCLAVE?
The professionals named in the filing: Architect: Ar. CHAITANYA S CHOUGULE; Engineer: Er. SUNIL KUMANNA CHOUGULE; Chartered Accountant: KUNTUSAGAR VASUDEV HARADI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JINENDRA ENCLAVE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback