ReraGenieLog inGet a buyer report

Home / Browse projects / Belagavi, Karnataka / JINENDRA ENCLAVE

Registration approved No litigation declared Residential/Group Housing project

JINENDRA ENCLAVE

By DHARANI BUILDERS AND DEVELOPERS

RG-KA-67068 · RERA PRM/KA/RERA/1249/447/PR/041123/006368 · Last updated on RERA Karnataka portal: 11 Oct 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 95 documents Report an error

JINENDRA ENCLAVE is a Residential/Group Housing project by DHARANI BUILDERS AND DEVELOPERS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/041123/006368 on 4 Nov 2023. Possession is promised by 30 Jun 2026.

At a glance

Project

  • NameJINENDRA ENCLAVE
  • TypeResidential/Group Housing
  • Location
    • Belagavi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1249/447/PR/041123/006368
  • ReraGenie IDRG-KA-67068

Builder

  • NameDHARANI BUILDERS AND DEVELOPERS
  • Entity typeProprietorship
  • GSTIN29ANTPG5948F1ZE
  • Authorized SignatoryMR. DHARNENDRA CHAMU GHANTI

Key dates

this monthRegisteredNov 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 Nov 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JINENDRA ENCLAVE---20020

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 11 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 11 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
AJITKUMAR ANNARAO INCHAL--
DEEPAK JINAPPA WADAGAVE--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.90 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.90 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. CHAITANYA S CHOUGULE
EngineerEr. SUNIL KUMANNA CHOUGULE
Chartered AccountantKUNTUSAGAR VASUDEV HARADI

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed95

As listed on the registration, under the names the promoter filed them with; the newest 80 of 95 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/041123/006368 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Proprietorship registration certificateFile: Udyam Registration Certificate.pdf11 Oct 2023
profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along with scheduFile: P&L 2021.pdf11 Oct 2023
profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along with scheduFile: P&L 2022.pdf11 Oct 2023
profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along with scheduFile: P&L 2023.pdf11 Oct 2023
sources of funds to complete the projectFile: Source of Funds Revised PDF.pdf11 Oct 2023
Designated bank account number not matched with CA certificateFile: Form-1, CA (PR) PDF.pdf11 Oct 2023
Latest EncumbrancrFile: EC New.pdf11 Oct 2023
Schedules of Financial StatementFile: Declaration of Schedules PDF.pdf11 Oct 2023
Upload Proprietorship registration certificateFile: GST Certificate (1).pdf23 Aug 2023
Upload Proprietorship registration certificateFile: Self Declaration of Proprietorship PDF.pdf23 Aug 2023
2021-22 with CA UDIN along with SchedulesFile: Financial.pdf23 Aug 2023
Upload profit and loss account and balance sheet, 2019-20,File: 2019-20.pdf23 Aug 2023
What are all the sources of funds to complete the projectFile: Source of Funds Revised.pdf23 Aug 2023
Designated bank account number not matched with CA certificateFile: Rectification of RERA Account Jinendra Enclave.pdf23 Aug 2023
loaded EConly for the date 1-1-2020 bUT NOT UPLOADED ec as requested from 1-4-2005 till dateFile: EC 2004 to 2023.pdf23 Aug 2023
Uploded document in No 6 is notproperly visible need toupload clearly visible deedFile: Title Deed Clear Copy_compressed.pdf23 Aug 2023
advocate search reportFile: Advocate Search Report_compressed.pdf23 Aug 2023
Upload Renewed Building LicenseFile: Plan Extension Certificate.pdf23 Aug 2023
Upload all renewed sanctioned drawings Floor plans, sectional drawings and elevationsFile: Clariication of Sanctioned Drawings PDF_removed.pdf23 Aug 2023
Upload commencement certificateFile: Plan Extension Certificate.pdf23 Aug 2023
Uploaded demarcation drawing. Therefore Please upload the STP/Septic Tank, Soak pit, and sewer lineFile: STP DRAWING JINENDRA ENCLAVE.pdf23 Aug 2023
Uploaded demarcation drawing. Therefore Please upload the STP/Septic Tank, Soak pit, and sewer lineFile: STP Demarcation.pdf23 Aug 2023
Since the project is ongoing, Please upload Form-6, Engineer certificate.File: F6 Engineer (PR) Jinendra Enclave PDF.pdf23 Aug 2023
Upload Proprietorship registration certificate.File: Self Declaration of Proprietorship PDF.pdf27 Jul 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: Financial.pdf27 Jul 2023
What are all the sources of funds to complete the project? With supporting documents.File: Declaration of Source of Funds PDF.pdf27 Jul 2023
Designated bank account number not matched with CA certificate. Hence NOT OKFile: Declaration of RERA Account PDF.pdf27 Jul 2023
EC NOT UPLOADED FRON 1/4/2005 TO TILL DATEFile: Nil Encumbrance 2020.pdf27 Jul 2023
TITLE DEED SHOWING FLOW OF RIGHTS FROM PREVIOUS OWNER TO AJITKUMAR NOT UPLOADEDFile: Flow of Title to Arunkumar.pdf27 Jul 2023
DEPONENTS NEED TO SIGN ON EVERY PAGE OF THE AFFIDAVIT IN jd cum AFFIDIVAT HENCE NOT OKFile: JD Cum Declaration.pdf27 Jul 2023
Built up area of individual details not mentioned in the certified list.File: Built-Up Area Details Certified PDF.pdf27 Jul 2023
Please upload the valid Engineer license certificate.File: Engineer Licence Copy.pdf27 Jul 2023
Please upload a copy of the notarized section 3(1) affidavit self-attestation with a seal.File: Non-Violation 3-1.pdf27 Jul 2023
Please upload the attested copy of the water supply NOC along with a copy of the fee receipt paid toFile: Water NOC Copy.pdf27 Jul 2023
In the letter, it was mentioned regarding bore well, please upload the permission letter issued by KFile: Self Declration of KGWA for Jinendra Enclave PDF.pdf27 Jul 2023
Please upload the STP/Septic Tank, Soak pit, and sewer line drawing certified by the Engineer.File: STP Demarcation.pdf27 Jul 2023
Please upload Form-6, Engineer certificate.File: Self Declaration of Not applcable of Form No-6 PDF.pdf27 Jul 2023
Please update the timeline completion date in the relevant Para and upload the proforma of the AgreeFile: Agreement of Sale Proforma Jinendra Enclave PDF.pdf27 Jul 2023
Please upload the Land cost calculation sheet as per the guidance values(signed copy).File: Self Declration of Land Value Calculaion for Jinendra Enclave PDF.pdf27 Jul 2023
Please upload the NOC issued by Power Supply along with the copy of the fee receipt.File: HESCOM NOC.pdf27 Jul 2023
Please upload the reason for the delay in RERA registration along with the sold and unsold details (File: Declaration of Sold Unsold and Start Date.pdf27 Jul 2023
Please upload the attested copy of the water supply NOC along with a copy of the fee receipt paid toFile: Declaration of Misplace Fee Receipt of Water NOC.pdf27 Jul 2023
Registration CertificateFile: GST Certificate (1).pdf-
Certificate issued by CA Form 1File: Form-1, CA (PR).pdf-
Certificate issued by Architect Form 2File: Form No-2 Architect PR PDF.pdf-
Certificate issued by Engineer Form 3File: Form-3, Engineer PDF.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non-Litigation.pdf-
Certificate from Chartered AccountFile: Form-1, CA (PR).pdf-
Income Tax Return Acknowledgement 2021 - 2022File: 2020-21.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: 2019-2020.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: 2018-2019.pdf-
Building Commencement-
Water NOC Copy-
Approved Plan Copy-
Sectional Drawing Fnal Copy-
Project Specification of Jinendra Enclave PDF-
Stability Certificate-
JDA Copy_compressed-
Amalagmation Order & Plan Copy-
Self Declration of DC Conversion for Jinendra Enclave PDF-
GPA Copy-
Agreement of Sale Proforma Jinendra Enclave PDF-
ALLOTMENT LETTER JINENDRA ENCLAVE PDF-
Form No-B Affidavit_compressed-
Section 3_1 Non-Violation-
JD Cum Declaration Affidavit-
Water NOC Copy-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB NOC Copy_compressed-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Belagavi

24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep JINENDRA ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

Builder: DHARANI BUILDERS AND DEVELOPERS

DHARANI BUILDERS AND DEVELOPERS has 1 registration on RERA Karnataka, including JINENDRA ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if JINENDRA ENCLAVE is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of JINENDRA ENCLAVE?

The registered promoter entity is DHARANI BUILDERS AND DEVELOPERS, a proprietorship as per the filing. Its GSTIN 29ANTPG5948F1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in JINENDRA ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at JINENDRA ENCLAVE?

The professionals named in the filing: Architect: Ar. CHAITANYA S CHOUGULE; Engineer: Er. SUNIL KUMANNA CHOUGULE; Chartered Accountant: KUNTUSAGAR VASUDEV HARADI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JINENDRA ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JINENDRA ENCLAVE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JINENDRA ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.