HEXA SKYLINE
By HEXA BUILDER
RG-KA-34545 · RERA PRM/KA/RERA/1251/310/PR/041024/007117 · Last updated on RERA Karnataka portal: 3 Oct 2024
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
HEXA SKYLINE is a Residential/Group Housing project by HEXA BUILDER in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/041024/007117 on 4 Oct 2024. Possession is promised by 31 Aug 2027.
At a glance
Project
- NameHEXA SKYLINE
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560083
- Pincode560083
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/041024/007117
- ReraGenie IDRG-KA-34545
Builder
- NameHEXA BUILDER
- Entity typePartnership Firm
- GSTIN29AAPFH6181E1Z0
- Authorized SignatoryHEMANTH KUMAR V J
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on4 Oct 2024
- Promised completion31 Aug 2027
- Revised completionNone
- Buildings3 building records
- Documents filed79 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BLOCK | - | - | - | 40 | 0 | 40 |
| B Block | - | - | - | 56 | 0 | 56 |
| C Block | - | - | - | 48 | 0 | 48 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 3 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 3 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership8
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| G V HONNAPPA | - | - |
| G.V.Krishnamurthy | - | - |
| G V Shankar | - | - |
| T R Manjunath | - | - |
| lakshmi devi G A | - | - |
| SHARADAMMA | - | - |
| JAYAMMA | - | - |
| T M GOPAL KRISHNA | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 47.25 cr | - |
| On-site expenditure-Salaries of workers | Rs 6.84 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 4.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 30.00 lakh | - |
| On-site expenditure-Site Overhead | Rs 23.44 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | G. BHANUMATHY |
| Engineer | ARUN KUMAR. S.R |
| Chartered Accountant | VINAYA SIMHA M G |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed79
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/041024/007117 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Upload financial statements with CA UDIN ( promoter not signed )File: financial statements with sign.pdf | 3 Oct 2024 |
| What are all the sources of fund to complete the project with supporting documentsFile: Sources of funds and BS.pdf | 3 Oct 2024 |
| Promoter need to upload notarized affidavit in form-B,with date of completion of project need to beFile: Form B .pdf | 3 Oct 2024 |
| Area details in approved plan and details uploadedFile: area statement.pdf | 3 Oct 2024 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketcFile: ADLR Sketch and Single Plot Drawing.pdf | 3 Oct 2024 |
| Approved Original Single Plot layout planFile: Sketch.pdf | 3 Oct 2024 |
| Approved Master plan Extract ear mark the proposed land and certified by the concern AuthorityFile: Plan sanction.pdf | 3 Oct 2024 |
| Village map certified by the concern officerFile: Village Map certified copy.pdf | 3 Oct 2024 |
| Change of land use details.File: change of land use.jpeg | 3 Oct 2024 |
| Please upload the Certificate from Registered Engineer indicating the structural safety adopted forFile: STRUCTRUAL STABILITY.pdf | 3 Oct 2024 |
| The uploaded STP design drawing does not tally with the KPSCB NOC. Therefore Please upload the STP dFile: Plan sanction.pdf | 3 Oct 2024 |
| Single Plot layout planFile: singleplot.pdf | 3 Oct 2024 |
| Original Single Plot layout plan work orderFile: LayoutPlan.pdf | 3 Oct 2024 |
| Change of land use detailsFile: cluorder.pdf | 3 Oct 2024 |
| he uploaded STP design drawing does not tally with the KPSCB NOC. Therefore Please upload the STP deFile: kspcb.pdf | 3 Oct 2024 |
| land cost calculation sheet not uploaded. Please upload the Land cost calculation sheet as per the gFile: Hexa Letter-1 (1).pdf | 3 Oct 2024 |
| land cost calculation sheet not uploaded. Please upload the Land cost calculation sheet as per the gFile: Guidance value certified copy_compressed.pdf | 3 Oct 2024 |
| Upload financial statements with CA UDINFile: Financial statement-Hexa builders (1).pdf | 28 Aug 2024 |
| What are all the sources of fund to complete the project with supporting documentsFile: Land cost calculation and fund details.pdf | 28 Aug 2024 |
| Upload bank affidavit in prescribed formatFile: Bank Account Affidavit.pdf | 28 Aug 2024 |
| upload 30% account detailsFile: 30%.pdf | 28 Aug 2024 |
| certificate of registration of partnership firmFile: CERTIFICATE OF REGISTEION OF FIRM.pdf | 28 Aug 2024 |
| copy of current year RTCFile: RTC.pdf | 28 Aug 2024 |
| connected MR in favuor of land owner before conversionFile: MR in the name of land owners.pdf | 28 Aug 2024 |
| EC from 1/4/2008 till date for PID and snoFile: EC.pdf | 28 Aug 2024 |
| title deed of the land ownerFile: Title deeds.pdf | 28 Aug 2024 |
| JDA showing sharing ratio between landowner and developerFile: JOINT DEVELOPMENT.pdf | 28 Aug 2024 |
| latest katha extractFile: Katha copy.pdf | 28 Aug 2024 |
| notarized affidavit in form-B,with date of completion of project need to be mentioned in DDMMYYYY foFile: Form B.pdf | 28 Aug 2024 |
| notarized JD cum AffidavitFile: J D Affidavit.pdf | 28 Aug 2024 |
| advocate search report, approved plan and all other relevant document which promoter feel necessary,File: LEGAL SEARCH REPORT.pdf | 28 Aug 2024 |
| notarized affidavit regarding all pending or cleared litigations /non-litigation, acquisition proceFile: HEXA AFFIDAVIT 001 (1).pdf | 28 Aug 2024 |
| Building License for construction of building from Local Authority.File: BUILDING LICENCE.pdf | 28 Aug 2024 |
| All sanctioned drawings, floor plan, sectional drawings and elevations - Original drawings.File: Plan.pdf | 28 Aug 2024 |
| Architects certificate with valid COA number.File: BHANUMATHII ARCHITECT.pdf | 28 Aug 2024 |
| Please update the project Engineer details and upload the latest dated self attested copy of the EngFile: Engineer self attestation.pdf | 28 Aug 2024 |
| Updated Amenities and Common area details are incorrect. Please update the same properly as per theFile: AMENITES AND COMMON AREA.pdf | 28 Aug 2024 |
| All sanctioned drawings, floor plan, sectional drawings and elevations - Original drawings.File: Plan.pdf | 28 Aug 2024 |
| Please update the Type of Inventory and No. of Inventory with brief BHK wise details properly on theFile: HEXA SKYLINE A BLOCK.xlsx | 28 Aug 2024 |
| Please update the Type of Inventory and No. of Inventory with brief BHK wise details properly on theFile: HEXA SKYLINE B Block.xlsx | 28 Aug 2024 |
| Please upload the copy of the fee receipt paid towards the BESCOM NOCFile: BESCOM NOC.pdf | 28 Aug 2024 |
| Please upload the self attested copy of the BWSSB NOC along with the copy of fee receipt paid towardFile: Fee paid receipts.pdf | 28 Aug 2024 |
| Please upload the Certificate from Registered Engineer indicating the structural safety adopted forFile: ENGINEER CERTIFICATE.pdf | 28 Aug 2024 |
| The uploaded STP design drawing does not tally with the KPSCB NOC. Therefore Please upload the STP dFile: Plan.pdf | 28 Aug 2024 |
| 9) Please upload the proforma of the Agreement for Sale and proforma of Allotment letter.File: AS - HEXA SKYLINE - GOTTIGERE - RERA (1).pdf | 28 Aug 2024 |
| Please upload the Land cost calculation sheet as per the guidance value(self-attested copy)File: Land cost calculation and fund details.pdf | 28 Aug 2024 |
| Please mention the project name and project address and upload the project specification certifiedFile: specification(2).pdf | 28 Aug 2024 |
| Please mention the project name and project address and upload the section 3(1) notarized affidavitFile: HEXA AFFIDAVIT 004.pdf | 28 Aug 2024 |
| Please update the Type of Inventory and No. of Inventory with brief BHK wise details properly on theFile: HEXA SKYLINE C Block.xlsx | 28 Aug 2024 |
| Registration CertificateFile: RECONSTUTION OF PARTNERSHIP.pdf | - |
| Partnership DeedFile: RECONSTUTION OF PARTNERSHIP.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: CA form 1_compressed.pdf | - |
| Certificate issued by Architect Form 2File: ARCHITECT CERTIFICATE.pdf | - |
| Certificate issued by Engineer Form 3File: Engineer certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: No litigation affidavit.pdf | - |
| Certificate from Chartered AccountFile: CA form 1_compressed.pdf | - |
| Balance Sheet 2022 - 2023File: ITR Acknowledgement.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Financial Statement.pdf | - |
| Cash Flow Statement 2022 - 2023File: CASH FLOW.pdf | - |
| Auditor's Report 2022 - 2023File: Form_pdf_577209161040724_compressed.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR Acknowledgement.pdf | - |
| BESCOM NOC | - |
| BWSSB NOC | - |
| sanction plan of hexa | - |
| sanction plan of hexa | - |
| sanction plan of hexa | - |
| sanction plan of hexa | - |
| Specification | - |
| sanction plan of hexa | - |
| sanction plan of hexa | - |
| JOINT DEVELOPMENT | - |
| conversion copy | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep HEXA SKYLINE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 34 registered projects within 2 km.
Godrej Vanantara
GODREJ IRISMARK PRIVATE LIMITED
CASAGRAND HAZEN
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
GRC SAPPHIRE SPRING - PHASE -1
GRC Infra Pvt. Ltd.
COURTYARD BY VEDANTH SURAKSHA
VEDANTH SURAKSHA PROPERTIES
GRC SAPPHIRE SPRING PHASE II
GRC Infra Private Limited
PLATINUM GREENFIELDS
SAI PROPERTIES
See every Bengaluru Urban project, with the district possession charts
Builder: HEXA BUILDER
HEXA BUILDER has 1 registration on RERA Karnataka, including HEXA SKYLINE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if HEXA SKYLINE is delayed beyond 31 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of HEXA SKYLINE?
The registered promoter entity is HEXA BUILDER, a partnership firm as per the filing. Its GSTIN 29AAPFH6181E1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in HEXA SKYLINE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at HEXA SKYLINE?
The professionals named in the filing: Architect: G. BHANUMATHY; Engineer: ARUN KUMAR. S.R; Chartered Accountant: VINAYA SIMHA M G. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HEXA SKYLINE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback