ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / HARMONY HOMES

Registration approved No litigation declared Residential/Group Housing project

HARMONY HOMES

By Gali Jagadish Chandra Prakash

RG-KA-66220 · RERA PRM/KA/RERA/1251/308/PR/290726/008856 · Last updated on RERA Karnataka portal: 22 Jul 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2031Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 175 documents Report an error

HARMONY HOMES is a Residential/Group Housing project by Gali Jagadish Chandra Prakash in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/290726/008856 on 29 Jul 2026. Possession is promised by 31 Dec 2031.

At a glance

Project

  • NameHARMONY HOMES
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 562125
  • Pincode562125
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/290726/008856
  • ReraGenie IDRG-KA-66220

Builder

  • NameGali Jagadish Chandra Prakash
  • Entity typeOther ( Individual )
  • Authorized SignatoryGali Jagadish Chandra Prakash

Key dates

this monthRegisteredJul 2026PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Jul 2026
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings9 building records
  • Documents filed175 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING 01---12012
WING 02---12012
WING 03---11011
WING 04---14014
WING 05---14014
WING 06---707
WING 07---14014
WING 08---14014
WING 09---10010

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership26

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area30,351 sq m
Named landowners26
LandownerVillageDistrict
Sri Manjunath--
Mrs C Thimmakka--
Mrs V Radhamma--
Mrs Shashikala V--
Mr G Jagadish Chandra Prakash--
Mr G Jagadish Chandra Prakash--
Smt K Parimala--
Smt K Lalitha--
Mr G Jagadish Chandra Prakash--
Mr G Jagadish Chandra Prakash--
Smt Susheelamma--
Sri Mohan Reddy R--
Kumari Pallavi M--
Sri Rakshith M--
Smt Sampath Kumari R--
Sri Murali R--
Kumari Charitha--
Master Parikshith--
Smt Narayanamma--
Smt Ashwathamma--
Smt Manjulamma--
Smt Yuganand--
Sri Chandrappa--
Smt Vanitha K C--
Sri Rakesh KC--
Sri Keerthi KC--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 140.72 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 129.92 cr-
On-site expenditure-Site OverheadRs 10.50 cr-
Payment of taxesRs 30.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB V Narendranath Reddy
EngineerRajpurohit Karansingh Prabhusingh
Chartered AccountantC VENKATESULU

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed175

As listed on the registration, under the names the promoter filed them with; the newest 80 of 175 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/290726/008856 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
TITLE DEEDFile: 87:34 Title Deed.pdf22 Jul 2026
PARTITION DEEDFile: PARTITION DEED 87:35 .pdf22 Jul 2026
SINGLE LAYOUT ORDERFile: Single Layout Approval Letter.pdf22 Jul 2026
SINGLE LAYOUT PLANFile: Sinlge Layout Plan.pdf22 Jul 2026
BUILDING LICENSEFile: Building License.pdf22 Jul 2026
BUILDING PLANFile: Building Plan.pdf22 Jul 2026
WING 1 GROUND FIRST SECOND PLANFile: WING 1 GROUND FIRST SECOND PLAN.pdf22 Jul 2026
WING 1 THIRD TERRACE ELEVATION SECTIONFile: WING 1 THIRD TERRACE ELEVATION SECTION.pdf22 Jul 2026
WING 2 GROUND FIRST PLANFile: WING 2 GROUND FIRST PLAN.pdf22 Jul 2026
WING 2 SECOND THIRD TERRACE ELEVATION SECTIONFile: WING 2 SECOND THIRD TERRACE ELEVATION SECTION.pdf22 Jul 2026
WING 3 GROUND FIRST SECOND PLANFile: WING 3 GROUND FIRST SECOND PLAN.pdf22 Jul 2026
WING 3 THIRD TERRACE SECTION ELEVATIONFile: WING 3 THIRD TERRACE SECTION ELEVATION.pdf22 Jul 2026
WING 4 GROUND FIRST SECOND PLANFile: WING 4 GROUND FIRST SECOND PLAN.pdf22 Jul 2026
WING 4 THIRD TERRACE ELEVATION SECTION PLANFile: WING 4 THIRD TERRACE ELEVATION SECTION PLAN.pdf22 Jul 2026
WING 5 GROUND FIRST ELEVATION PLANFile: WING 5 PLAN SECOND.pdf22 Jul 2026
WING 5 SECOND THIRD TERRACEFile: WING 5 PLAN GROUND FLOOR.pdf22 Jul 2026
WING 6 GROUND FIRST SECOND PLANFile: WING 6 GROUND FIRST SECOND PLAN.pdf22 Jul 2026
WING 6 THIRD TERRACE ELEVATOIN PLANFile: WING 6 THIRD TERRACE ELEVATOIN PLAN.pdf22 Jul 2026
WING 7 GROUND FIRST SECOND PLANFile: WING 7 GROUND FIRST SECOND PLAN.pdf22 Jul 2026
WING 7 THIRD TERRACE ELEVATION PLANFile: WING 7 THIRD TERRACE ELEVATION PLAN.pdf22 Jul 2026
WING 8 GROUND FIRST SECOND PLANFile: WING 8 GROUND FIRST SECOND PLAN.pdf22 Jul 2026
WING 8 THIRD TERRACE ELEVATION PLANFile: WING 8 THIRD TERRACE ELEVATION PLAN.pdf22 Jul 2026
WING 9 GROUND FIRST SECOND PLANFile: WING 9 GROUND FIRST SECOND PLAN.pdf22 Jul 2026
WING 9 THIRD TERRACE ELEVATOIN SECTIONFile: WING 9 THIRD TERRACE ELEVATOIN SECTION.pdf22 Jul 2026
BANK AFFIDAVITFile: BANK AFFIDAVIT .pdf22 Jul 2026
FORM B AFFIDAVITFile: FORM B AFFIDAVIT.pdf22 Jul 2026
NON LITIGATION AFFIDAVITFile: NON LITIGATION AFFIDAVIT.pdf22 Jul 2026
SEC 3(1) VIOLATION AFFIDAVITFile: SEC 3(1) VIOLATION AFFIDAVIT.pdf22 Jul 2026
PROJECT SPECIFICATIONFile: PROJECT SPECIFICATION.pdf22 Jul 2026
STRUCTURAL STABILITY CERTIFICATEFile: STRUCTURAL STABILITY CERTIFICATE.pdf22 Jul 2026
SEIAA NOCFile: SEIAA NOC.pdf22 Jul 2026
ABSTRACT ESTIMATIONFile: ABSTRACT ESTIMATION.jpg22 Jul 2026
STP PLANFile: STP PLAN.jpg22 Jul 2026
Engineer LicenseFile: Engineer Registration Certificate.jpeg22 Jul 2026
BESCOM AffidavitFile: Bescom Affidavit.pdf22 Jul 2026
RTC, survey 87/3-
Mutation, survey 87/3-
Encumbrance Certificate, survey 87/3-
Conversion/Alienation Order, survey 87/3-
Sale/Title/Gift Deed, survey 87/3-
JDA, survey 87/3-
Khatha, survey 87/3-
RTC, survey 87/6-
Mutation, survey 87/6-
Encumbrance Certificate, survey 87/6-
Conversion/Alienation Order, survey 87/6-
JDA, survey 87/6-
Khatha, survey 87/6-
RTC, survey 87/24-
Mutation, survey 87/24-
Encumbrance Certificate, survey 87/24-
Conversion/Alienation Order, survey 87/24-
Sale/Title/Gift Deed, survey 87/24-
Khatha, survey 87/24-
RTC, survey 87/25-
Mutation, survey 87/25-
Encumbrance Certificate, survey 87/25-
Conversion/Alienation Order, survey 87/25-
Sale/Title/Gift Deed, survey 87/25-
Khatha, survey 87/25-
RTC, survey 87/26-
Mutation, survey 87/26-
Encumbrance Certificate, survey 87/26-
Conversion/Alienation Order, survey 87/26-
Sale/Title/Gift Deed, survey 87/26-
JDA, survey 87/26-
Khatha, survey 87/26-
RTC, survey 87/27-
Mutation, survey 87/27-
Encumbrance Certificate, survey 87/27-
Conversion/Alienation Order, survey 87/27-
Sale/Title/Gift Deed, survey 87/27-
JDA, survey 87/27-
Khatha, survey 87/27-
RTC, survey 87/33-
Mutation, survey 87/33-
Encumbrance Certificate, survey 87/33-
Conversion/Alienation Order, survey 87/33-
Sale/Title/Gift Deed, survey 87/33-
Khatha, survey 87/33-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep HARMONY HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmHARMONY HOMESOther 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: Gali Jagadish Chandra Prakash

Gali Jagadish Chandra Prakash has 1 registration on RERA Karnataka, including HARMONY HOMES. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if HARMONY HOMES is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of HARMONY HOMES?

The registered promoter entity is Gali Jagadish Chandra Prakash, an other ( individual ) as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in HARMONY HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at HARMONY HOMES?

The professionals named in the filing: Architect: B V Narendranath Reddy; Engineer: Rajpurohit Karansingh Prabhusingh; Chartered Accountant: C VENKATESULU. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARMONY HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARMONY HOMES. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARMONY HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.