Home / Browse projects / Bengaluru Urban, Karnataka / GRC SAFFRON SKIES
GRC SAFFRON SKIES
By GRC INFRA
RG-KA-86289 · RERA PRM/KA/RERA/1251/310/PR/220623/006016 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
GRC SAFFRON SKIES is a Residential/Group Housing project by GRC INFRA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/220623/006016 on 22 Jun 2023. Possession is promised by 31 Mar 2028. 22 of the 81 units on this registration are recorded sold or booked, and 7 of 17 construction stages are filed complete.
At a glance
Project
- NameGRC SAFFRON SKIES
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560082
- Pincode560082
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/220623/006016
- ReraGenie IDRG-KA-86289
Builder
- NameGRC INFRA
- Entity typePartnership Firm
- GSTIN29AAVFG7135R1Z8
- Authorized SignatoryRajesh G
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Jun 2023
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings2 building records
- Documents filed125 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tulip | - | - | - | 49 | 0 | 49 |
| Lotus | - | - | - | 32 | 0 | 32 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 17 construction stages are filed complete. The stage furthest along is Electrification, at 80%.
Building: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 70% |
| Joinery: Doors, Windows, Ventilators etc | 60% |
| Basic work of Water supply, Sanitary and Electrification | 70% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 65% |
| Railing and Grill fixing | 65% |
| Electrification, Water supply and Sanitary Finishing | 80% |
| Painting | 65% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 60% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 50% |
| Internal and External work including landscapes as per sanctioned drawings | 50% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 40% |
| Sewage and Drainage System | Yes | 20% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 20% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 60% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 20% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 60% |
| Lifts | Yes | 60% |
| Corridor/Lobbies | Yes | 60% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 60% |
| Basement | Yes | 95% |
| Terrace | Yes | 45% |
| Outer Wall | Yes | 65% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Rajendra Naidu | - | - |
| P RAJENDRA NAIDU | - | - |
| P RAJENDRA NAIDU | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 72.00 cr | Rs 10.37 lakh |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 6.20 cr | - |
| On-site expenditure-Site Overhead | Rs 5.50 cr | Rs 28.90 lakh |
| On-site expenditure-Consultants Fees | Rs 85.00 lakh | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | - | Rs 28.36 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Manoj Kumar Ladhad |
| Engineer | T Selvakumar |
| Chartered Accountant | D Manoj |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed125
As listed on the registration, under the names the promoter filed them with; the newest 80 of 125 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/220623/006016 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: GRC Saffron Skies Phase-compressed.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: q1 Architect certificate.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q1 engineer uttari.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Grc Saffron Skies Phase_compressed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Q2 uttari architect certificate 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q2 engineer 26-27.pdf | 15 Oct 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: GRC Safforn Skies Phase.pdf | 23 Jul 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Q4 artchtech Uttari.pdf | 23 Jul 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Q4 Uttari engineer.pdf | 23 Jul 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Grc Saffron Skies Q3 Final.pdf | 13 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Q3 Artchitect (1).pdf | 13 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Q3 Uttari engineer (1).pdf | 13 Mar 2026 |
| RERA Bank Account ConfirmationFile: RERA Bank Account Confirmation.pdf | 12 Jun 2023 |
| Source of Funds with supporting documentsFile: Source of Funds with supporting documents.pdf | 12 Jun 2023 |
| Development PlanFile: Development Plan.pdf | 12 Jun 2023 |
| Commencement CertificateFile: Commencement Certificate.pdf | 12 Jun 2023 |
| Development plan approval letterFile: Development plan approval letter.pdf | 12 Jun 2023 |
| Updated Form-1File: Updated Form-1.pdf | 12 Jun 2023 |
| RTC, survey 36 | - |
| Mutation, survey 36 | - |
| Encumbrance Certificate, survey 36 | - |
| Conversion/Alienation Order, survey 36 | - |
| Sale/Title/Gift Deed, survey 36 | - |
| JDA, survey 36 | - |
| Khatha, survey 36 | - |
| RTC, survey 37-1 | - |
| Mutation, survey 37-1 | - |
| Encumbrance Certificate, survey 37-1 | - |
| Conversion/Alienation Order, survey 37-1 | - |
| Sale/Title/Gift Deed, survey 37-1 | - |
| JDA, survey 37-1 | - |
| Khatha, survey 37-1 | - |
| RTC, survey 37-2 | - |
| Mutation, survey 37-2 | - |
| Encumbrance Certificate, survey 37-2 | - |
| Conversion/Alienation Order, survey 37-2 | - |
| Sale/Title/Gift Deed, survey 37-2 | - |
| JDA, survey 37-2 | - |
| Khatha, survey 37-2 | - |
| Registration CertificateFile: Company Incorporation Letter.pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Updated Form-1.pdf | - |
| Certificate issued by Architect Form 2File: Form-2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form-3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non-Litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form-1 CA Certificate.pdf | - |
| Balance Sheet 2021 - 2022File: Balance Sheet and P&L 2021-22.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet and P&L 2020-21.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Balance Sheet and P&L 2021-22.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Balance Sheet and P&L 2020-21.pdf | - |
| Cash Flow Statement 2021 - 2022File: Statement of Income 21-22.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR 2020-21.pdf | - |
| Sanction letter | - |
| Bescom NOC with fee paid receipt | - |
| Water NOC | - |
| Approved Plan All Pages | - |
| SITE PLAN | - |
| Project Specification | - |
| Section and Elevation Plan All Towers | - |
| Project Specification | - |
| Stability certificate | - |
| Legal Opinion | - |
| JDA and GPA | - |
| Title Deed M R No 1 95-96 | - |
| Proforma Agreement of Sale | - |
| Proforma Allotment Letter | - |
| Form B Affidavit | - |
| Sec 3(1) Affidavit | - |
| JDA Affidavit | - |
| Bescom NOC with fee paid receipt | - |
| Water NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep GRC SAFFRON SKIES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 16 registered projects within 2 km.
AAROHANA ALTERRA
AAROHANA PROJECTS
Sri Sri Sattva
SRI SUMERU REALTY PRIVATE LIMITED
BREN AVAANA
BREN CORPORATION PRIVATE LIMITED
BREN ANANTA
BREN CORPORATION PRIVATE LIMITED
Primus Darpan
Ameliorate Realtors Private Limited
HASIRU VISTHARA
Hasiru Realty LLP
See every Bengaluru Urban project, with the district possession charts
Builder: GRC INFRA
GRC INFRA has 3 registrations on RERA Karnataka, including GRC SHREEKRISH and GRC SAVORA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if GRC SAFFRON SKIES is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of GRC SAFFRON SKIES?
The registered promoter entity is GRC INFRA, a partnership firm as per the filing. Its GSTIN 29AAVFG7135R1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in GRC SAFFRON SKIES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at GRC SAFFRON SKIES?
The professionals named in the filing: Architect: Manoj Kumar Ladhad; Engineer: T Selvakumar; Chartered Accountant: D Manoj. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GRC SAFFRON SKIES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback