- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
GRAVITY SMERA GARDENS is a Residential/Group Housing project by GRAVITY PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/110925/008089 on 11 Sep 2025. Possession is promised by 30 Jul 2028. 5 of the 95 units on this registration are recorded sold or booked, and 0 of 16 construction stages are filed complete.
At a glance
Project
- NameGRAVITY SMERA GARDENS
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 562107
- Pincode562107
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/110925/008089
- ReraGenie IDRG-KA-69403
Builder
- NameGRAVITY PROPERTIES
- Entity typePartnership Firm
- GSTIN29ABBFG2906R1ZX
- Authorized SignatorySURYA N. C
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on11 Sep 2025
- Promised completion30 Jul 2028
- Revised completionNone
- Buildings9 building records
- Documents filed195 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block 18 | - | - | - | 15 | 0 | 15 |
| Block 17 | - | - | - | 5 | 0 | 5 |
| Block 16 | - | - | - | 9 | 0 | 9 |
| Block 15 | - | - | - | 13 | 0 | 13 |
| Block 14 | - | - | - | 7 | 0 | 7 |
| Block 13 | - | - | - | 7 | 0 | 7 |
| Block 12 | - | - | - | 8 | 0 | 8 |
| Block 11 | - | - | - | 7 | 0 | 7 |
| Block 10 | - | - | - | 24 | 0 | 24 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 16 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 75%.
Building: 14% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 75% |
| Foundation footing work | 70% |
| Upto Plinth Level | 70% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 7% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 10% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 20% |
| Street Lighting | Yes | 5% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership24
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
| B RAJASHEKAR | - | - |
| B N SADHANA | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 94.39 cr | Rs 9.95 cr |
| Payment of taxes | Rs 16.57 cr | - |
| On-site expenditure-Salaries of workers | Rs 12.42 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 2.67 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.16 cr | Rs 1.33 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 51.92 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anoop Rajendra Gumaja |
| Engineer | MALATHESHA S N |
| Chartered Accountant | Naveen Kumar G |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed195
As listed on the registration, under the names the promoter filed them with; the newest 80 of 195 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/110925/008089 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Smera CA Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Arc Cert - Smera Garden.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Eng Cert - Smera Garden.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Rera-CA Cert Smera Garden.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architect Certificate june 2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Enginner Certificate june 2026.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate smera gardens 15-4-26.pdf | 17 Jun 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Certficate Smera - March 26.pdf | 17 Jun 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Smera Gardens Engineer certificate March 26.pdf | 17 Jun 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Cert - Smera Garden.pdf | 5 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Arc Cert - Smera Garden.pdf | 5 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Eng Cert - Smera Garden.pdf | 5 Mar 2026 |
| Provisional BS & PL with UDINFile: Provisional BS & PL with UDIN.pdf | 4 Sep 2025 |
| Source of Fund with supporting DocFile: Source of Fund with supporting Doc.pdf | 4 Sep 2025 |
| DP Approval letter - STRRFile: DP Approval letter - STRR.pdf | 4 Sep 2025 |
| DP Plan - STRRFile: DP Plan - STRR.pdf | 4 Sep 2025 |
| STRR CC Lisence CopyFile: STRR CC Lisence Copy.pdf | 4 Sep 2025 |
| Site PlanFile: Site Plan.pdf | 4 Sep 2025 |
| Block 10File: Block 10.pdf | 4 Sep 2025 |
| Block 11File: Block 11.pdf | 4 Sep 2025 |
| Block 12File: Block 12.pdf | 4 Sep 2025 |
| Block 13File: Block 13.pdf | 4 Sep 2025 |
| Block 14File: Block 14.pdf | 4 Sep 2025 |
| Block 15File: Block 15.pdf | 4 Sep 2025 |
| Block 16File: Block 16.pdf | 4 Sep 2025 |
| Block 17File: Block 17.pdf | 4 Sep 2025 |
| Block 18File: Block 18.pdf | 4 Sep 2025 |
| ADLR SketchFile: ADLR Sketch.pdf | 4 Sep 2025 |
| Location demarcation of the project landFile: Location demarcation of the project.pdf | 4 Sep 2025 |
| CDP Demrcation - SmeraFile: CDP Demrcation - Smera.pdf | 4 Sep 2025 |
| Villege Map Smera SignFile: Villege Map Smera Sign.pdf | 4 Sep 2025 |
| KSPCB NOC with fees receiptFile: KSPCB NOC with fees receipt.pdf | 4 Sep 2025 |
| Proforma Allotment LetterFile: Proforma Allotment Letter.pdf | 4 Sep 2025 |
| Bescom NOCFile: Bescom NOC.pdf | 4 Sep 2025 |
| Area statement signedFile: Area statement signed.pdf | 4 Sep 2025 |
| Common Area and Amenities Details SignedFile: Common_Area_Details Signed.pdf | 4 Sep 2025 |
| Construction Cost EstimationFile: Construction Cost Estimation.pdf | 4 Sep 2025 |
| Proforma Agreement of SaleFile: Proforma Agreement of Sale.pdf | 4 Sep 2025 |
| Gravity Properties - Financials DeclarationFile: Gravity Properties - Financials Declaration.pdf | 4 Sep 2025 |
| Single plot layout and order - DeclarationFile: Single plot layout and order - Declaration.pdf | 4 Sep 2025 |
| Query Reply - Smera GardenFile: Query Reply - Smera Garden.pdf | 4 Sep 2025 |
| RTC, survey 30/1 | - |
| Mutation, survey 30/1 | - |
| Encumbrance Certificate, survey 30/1 | - |
| Conversion/Alienation Order, survey 30/1 | - |
| JDA, survey 30/1 | - |
| Khatha, survey 30/1 | - |
| RTC, survey 30/2 | - |
| Mutation, survey 30/2 | - |
| Encumbrance Certificate, survey 30/2 | - |
| Conversion/Alienation Order, survey 30/2 | - |
| JDA, survey 30/2 | - |
| Khatha, survey 30/2 | - |
| RTC, survey 30/3 | - |
| Mutation, survey 30/3 | - |
| Encumbrance Certificate, survey 30/3 | - |
| Conversion/Alienation Order, survey 30/3 | - |
| JDA, survey 30/3 | - |
| Khatha, survey 30/3 | - |
| RTC, survey 30/6 | - |
| Mutation, survey 30/6 | - |
| Encumbrance Certificate, survey 30/6 | - |
| Conversion/Alienation Order, survey 30/6 | - |
| JDA, survey 30/6 | - |
| Khatha, survey 30/6 | - |
| RTC, survey 30/10 | - |
| Mutation, survey 30/10 | - |
| Encumbrance Certificate, survey 30/10 | - |
| Conversion/Alienation Order, survey 30/10 | - |
| JDA, survey 30/10 | - |
| Khatha, survey 30/10 | - |
| RTC, survey 30/12 | - |
| Mutation, survey 30/12 | - |
| Encumbrance Certificate, survey 30/12 | - |
| Conversion/Alienation Order, survey 30/12 | - |
| JDA, survey 30/12 | - |
| Khatha, survey 30/12 | - |
| RTC, survey 30/13 | - |
| Mutation, survey 30/13 | - |
| Encumbrance Certificate, survey 30/13 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep GRAVITY SMERA GARDENS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
SHRIRAM 107SOUTHEAST - PHASE 3
Shriprop Living Space Private Limited
RAJ HIGH GARDENS
SNN Properties LLP
Sobha Madison Heights-Townpark Phase 2 W1 to 4
SOBHA LIMITED
DS MAX SKY SAMPADHA
DS MAX PROPERTIES PRIVATE LIMITED
Sobha Hamptons -Townpark Phase 1 W4 to 6
SOBHA LIMITED
Sobha Hamptons -Townpark Phase 2 W1 to 3
SOBHA LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: GRAVITY PROPERTIES
GRAVITY PROPERTIES has 1 registration on RERA Karnataka, including GRAVITY SMERA GARDENS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if GRAVITY SMERA GARDENS is delayed beyond 30 Jul 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of GRAVITY SMERA GARDENS?
The registered promoter entity is GRAVITY PROPERTIES, a partnership firm as per the filing. Its GSTIN 29ABBFG2906R1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in GRAVITY SMERA GARDENS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at GRAVITY SMERA GARDENS?
The professionals named in the filing: Architect: Anoop Rajendra Gumaja; Engineer: MALATHESHA S N; Chartered Accountant: Naveen Kumar G. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GRAVITY SMERA GARDENS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback