Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jul 2029Possession promisedno revision filed
6 of 13Construction stages donefurthest along: Plastering inside, 98%
12 of 20Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 113 documents Report an error

GOURINANDAN ARCADE is a Mixed Development project by GOURINANDAN BUILDCON in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/290425/007697 on 29 Apr 2025. Possession is promised by 20 Jul 2029. 8 of the 20 units on this registration are recorded sold or booked, and 6 of 13 construction stages are filed complete.

At a glance

Project

  • NameGOURINANDAN ARCADE
  • TypeMixed Development
  • Location
    • Belagavi
    • 590006
  • Pincode590006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1249/447/PR/290425/007697
  • ReraGenie IDRG-KA-26084

Builder

  • NameGOURINANDAN BUILDCON
  • Entity typePartnership Firm
  • GSTIN29ABAFG2257J1ZA
  • Authorized SignatorySANJEEV JOSHI

Key dates

this monthRegisteredApr 2025PromisedJul 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Apr 2025
  • Promised completion20 Jul 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed113 files

Current status

40%8 of 20 units booked
19.5%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOURNANDAN ARCADE-----20

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 13 construction stages are filed complete. The stage furthest along is Plastering inside, at 98%.

Building: 95% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)95%
Retaining wall (All types)Not applicable
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling98%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification95%
Dadoing, Skirting, Flooring, Tiles work (All types)95%
Railing and Grill fixing95%
Electrification, Water supply and Sanitary Finishing95%
Painting65%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes85%
Sewage and Drainage SystemYes85%
Water conservation/rain water harvesting/recharge of ground waterYes90%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes50%
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes50%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes55%
Corridor/LobbiesYes100%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes95%
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area699 sq m
Named landowners1
LandownerVillageDistrict
GOURINANDAN BUILDCON--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.59 cr
Cost incurredRs 1.28 cr
Spent of the estimate19.46%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 5.40 crRs 38.70 lakh
INTEREST ON BORROWINGRs 56.00 lakhRs 85.00 lakh
Payment of taxesRs 51.62 lakhRs 26,650
On-site expenditure-Consultants FeesRs 11.00 lakhRs 4.35 lakh
ADMINISTRATIVE COSTRs 84,742-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND BELGAONKAR
EngineerSAGAR HUDDAR
Chartered AccountantPUSHAKAR OGALE

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed113

As listed on the registration, under the names the promoter filed them with; the newest 80 of 113 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/290425/007697 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: ARCHITECT'S CERTFICATE.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: ENGINEER CERTIFICATE.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: CERTIFICATE (1)_compressed.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM NO - 06.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 QU 3 2025-26.pdf5 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: FORM 5 QU 3 2025-26.pdf5 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU 3 2025-26).pdf5 Feb 2026
Q3 2025-26 Water supply and sewage board5 Feb 2026
Q3 2025-26 KPTCL- BESCOM5 Feb 2026
ABOUT DISBURSED LOAN AMOUNTFile: about loan amount with supporting documents.pdf3 Apr 2025
SOURCE OF FUND WITH SUPPORTING DOCUMENTSFile: source of fund with supporting documents.pdf3 Apr 2025
ABOUT ORIGINAL APPROVED SINGLE PLOT LAYOUT PLANFile: about Single plot layout order and plan.pdf3 Apr 2025
ABOUT ORIGINAL APPROVED SINGLE PLOT LAYOUT WORK ORDERFile: about Single plot layout order and plan.pdf3 Apr 2025
ORIGINAL COPY OF BUILDING LICENSE FROM LOCAL AUTHORITY (QR CODE)File: Building license from Local Authority.pdf3 Apr 2025
ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR CTS MAP.pdf3 Apr 2025
original approved building planFile: approved plan with QR code.pdf3 Apr 2025
all original sanctioned drawings, floor plan, sectional drawings and elevations in one sheet onlyFile: sanctioned drawings, floor plan, sectional drawings and elevations plan with comment.pdf3 Apr 2025
all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: sanctioned drawings, floor plan, sectional drawings and elevations plan.pdf3 Apr 2025
about COA certificateFile: about COA.pdf3 Apr 2025
Demarcation of proposed land in Approved Master plan in approved copyFile: master plan with demarcation of project land.jpg3 Apr 2025
Demarcation of proposed land in Approved Master plan in approved copyFile: master plan with demarcation of project land - Copy.jpg3 Apr 2025
about ADLR sketch mapFile: about ADLR survey sketch.pdf3 Apr 2025
about No. of car parking lotsFile: about car parking slots.pdf3 Apr 2025
calculation sheet of common area and amenities certified by EngineerFile: common area calculation sheet.pdf3 Apr 2025
sewer line demarcation drawingFile: certified sewer line drawing.pdf3 Apr 2025
Brief estimation certified by EngineerFile: certified Brief estimation.pdf3 Apr 2025
certified area calculations with common area and amenities and unitsFile: Final Area calculations.jpg3 Apr 2025
balance sheet 23-24 with CA UDINFile: BALANCE SHEET 2023-24 WITH CA UDIN (2).jpeg22 Feb 2025
P n L 2023-24 with CA UDINFile: P N L 2023-24 WITH CA UDIN (2).jpeg22 Feb 2025
Source of Fund with supporting documentsFile: source of fund with supporting documents.pdf22 Feb 2025
Bank Letter for account detailsFile: BANK LETTER.jpeg22 Feb 2025
about loan amount and details of the sameFile: about loan amount with supporting documents.pdf22 Feb 2025
self attested Statement o scheduleFile: self attested schedule.pdf22 Feb 2025
about single plot layout plan and work orderFile: about Single plot layout order and plan.pdf22 Feb 2025
about single plot layout plan work orderFile: about Single plot layout order and plan.pdf22 Feb 2025
Building license from local authority original (QR Code)File: original Building license with QR code.pdf22 Feb 2025
ADLR certified survey sketch certifying the boundary of proposed land (CTS Map)File: ADLR CTS MAP.pdf22 Feb 2025
approved building plan with QR Code (original)File: approved plan with QR code.pdf22 Feb 2025
Original sanctioned drawing, floor plan, sectional drawing and elevation in one plan only with QR coFile: approved plan with QR code.pdf22 Feb 2025
about commencement certificateFile: about commencment cetificate.pdf22 Feb 2025
demarcation of proposed by city survey office since property within the limits of CTS officeFile: ADLR CTS MAP.pdf22 Feb 2025
about NOC under 14 of KTCP ActFile: Approval-NOC Section 14.pdf22 Feb 2025
certified common area and amenities calculationsFile: certified common area and amenities calculations.pdf22 Feb 2025
certified sewer line drawingFile: certified sewer line drawing.pdf22 Feb 2025
certified brief estimation of projectFile: certified Brief estimation.pdf22 Feb 2025
about car parkingFile: about car parking.pdf22 Feb 2025
demarcation of proposed land in approved master planFile: master plan with demarcation of project land - Copy.jpg22 Feb 2025
demarcation of proposed land in approved master plan by competent authorityFile: master plan with demarcation of project land.jpg22 Feb 2025
about COA certificateFile: about COA.pdf22 Feb 2025
water NOCFile: Water NOC.pdf22 Feb 2025
undertaking for water supplyFile: Undertaking for water supply.pdf22 Feb 2025
about engineer certificateFile: about Form 6 - Engineer certificate -clarification.pdf22 Feb 2025
Land cost calculationsFile: Land cost calculations.pdf22 Feb 2025
Registration CertificateFile: FIRM REGISTRATION.pdf-
GST Certificate-
Partnership DeedFile: PARTNERSHIP DEED.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: FORM 1.pdf-
Certificate issued by Architect Form 2File: Form - 2- ARCH.pdf-
Certificate issued by Engineer Form 3File: Form - 3, Engineer (PR).pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-

How this compares with Belagavi

40%of this project is bookeddistrict median 39%
24%of Belagavi projects moved their completion datethis one has not
0%of Belagavi registrations are shown as withdrawn or revokedthis one is not

Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.

Keep GOURINANDAN ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Belagavi460+ in Belagavi

2 kmGOURINANDAN ARCADEOther 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: GOURINANDAN BUILDCON

GOURINANDAN BUILDCON has 1 registration on RERA Karnataka, including GOURINANDAN ARCADE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.

Frequently asked questions

What are my rights if GOURINANDAN ARCADE is delayed beyond 20 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GOURINANDAN ARCADE?

The registered promoter entity is GOURINANDAN BUILDCON, a partnership firm as per the filing. Its GSTIN 29ABAFG2257J1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GOURINANDAN ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GOURINANDAN ARCADE?

The professionals named in the filing: Architect: MILIND BELGAONKAR; Engineer: SAGAR HUDDAR; Chartered Accountant: PUSHAKAR OGALE. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOURINANDAN ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOURINANDAN ARCADE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOURINANDAN ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.