Valid until 31 Dec 2023 Residential/Group Housing project

GOKUL RESIDENCY

By AMBICA DEVELOPERS

RG-GJ-40927 · RERA PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA05342/EX2/130723 · Last updated on GujRERA portal: 24 May 2024

Source: official GujRERA filing

Red flags

  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Dec 2023Possession promisedmoved 21 months from the original
28 of 36Construction stages doneacross 4 buildings; furthest along: Plinth, 0%
3 of 46Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

GOKUL RESIDENCY is a Residential/Group Housing project by AMBICA DEVELOPERS in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA05342/EX2/130723 on 29 Apr 2019. Possession is promised by 31 Dec 2023. The completion date has moved by 21 months from the original filing. 43 of the 46 units on this registration are recorded sold or booked, and 28 of 36 construction stages are filed complete.

At a glance

Project

  • NameGOKUL RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Kolavada- Kalol Road
    • Nr. Ambikanagar Society
    • Kolavada
    • Kolavada
    • Gandhinagar
    • 382028
  • Pincode382028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA05342/EX2/130723
  • ReraGenie IDRG-GJ-40927

Builder

  • NameAMBICA DEVELOPERS
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →
  • Past their filed date2

Key dates

this monthRegisteredApr 2019First promiseMar 2022Revised toDec 2023

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2023
  • Registered on29 Apr 2019
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 30 Mar 2022)
  • Buildings4 building records
  • Documents filed44 files

Current status

93%43 of 46 units booked
100.0%Of the estimated cost spent so far

Figures as on 24 May 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---10010
B---606
C---202
D---28028

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 24 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Plinth, at 0%.

A78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D78%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 24 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,731 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.52 cr
Cost incurredRs 2.52 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
ANARs 63.00 lakhRs 63.00 lakh
BNARs 63.00 lakhRs 63.00 lakh
CNARs 63.00 lakhRs 63.00 lakh
DNARs 63.00 lakhRs 63.00 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNISHANT H. KARKHANIS
EngineerNISHANT H. KARKHANIS

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA05342/EX1/140622Applied May 2022; approved Jun 2022
PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA05342/EX2/130723Applied Jun 2023; approved Jul 2023

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/RAA05342/EX2/130723 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)24 May 2024
Architect's certificate (Form 1)23 May 2024
Engineer's certificate (Form 2)23 May 2024
Engineer's certificate annexure23 May 2024
Site photograph, A20 May 2024
Site photograph, B20 May 2024
Site photograph, C20 May 2024
Site photograph, D20 May 2024
RERA registration certificate29 Apr 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

93%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one moved by 21 months

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep GOKUL RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kolavada1,600+ in Gandhinagar

2 kmGOKUL RESIDENCYOther 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: AMBICA DEVELOPERS

AMBICA DEVELOPERS has 2 registrations on GujRERA, including GOKUL RESIDENCY and Gokul Residency 2. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if GOKUL RESIDENCY is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of GOKUL RESIDENCY?

The registered promoter entity is AMBICA DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in GOKUL RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GOKUL RESIDENCY?

The professionals named in the filing: Architect: NISHANT H. KARKHANIS; Engineer: NISHANT H. KARKHANIS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKUL RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKUL RESIDENCY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKUL RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.