Home / Browse projects / Bengaluru Urban, Karnataka / Godrej Woodscapes Phase 2
Godrej Woodscapes Phase 2
RG-KA-12197 · RERA PRM/KA/RERA/1251/446/PR/170524/006888 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 2 complaints at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
Godrej Woodscapes Phase 2 is a Residential/Group Housing project by Godrej Properties Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/170524/006888 on 17 May 2024. Possession is promised by 1 Jun 2030. 220 of the 232 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameGodrej Woodscapes Phase 2
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560049
- Pincode560049
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/170524/006888
- ReraGenie IDRG-KA-12197
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 May 2024
- Promised completion1 Jun 2030
- Revised completionNone
- Buildings2 building records
- Documents filed153 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower P | - | - | - | 116 | 0 | 116 |
| Tower Q | - | - | - | 116 | 0 | 116 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 97%.
Building: 19% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 97% |
| Foundation footing work | 97% |
| Upto Plinth Level | 39% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 45% |
| Retaining wall (All types) | 39% |
| RCC or MS Framed structure | 19% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 10% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 10% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Godrej Properties Limited | - | - |
| Godrej Properties Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 211.71 cr | Rs 37.91 cr |
| On-site expenditure-Site Overhead | Rs 16.58 cr | Rs 14.15 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 11.66 cr | - |
| Payment of fees | Rs 8.77 cr | - |
| On-site expenditure-Consultants Fees | Rs 7.63 cr | - |
| Payment of charges | Rs 5.85 cr | - |
| Payment of Premiums | Rs 33.01 lakh | - |
| Payment of taxes | - | Rs 1.01 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 6.05 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TILAK THOMAS |
| Engineer | Madhura Manjrekar |
| Chartered Accountant | BHAVESH D. SHAH & CO. |
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00801/2024 | - | Godrej Properties Limited | 27/08/2024 |
| 01190/2024 | - | Godrej Properties Limited | 19/11/2024 |
Documents filed153
As listed on the registration, under the names the promoter filed them with; the newest 80 of 153 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/170524/006888 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - GODREJ WOODSCAPES PH 2-FINAL_compressed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5 Architects Woodscapes Ph 2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer -Woodscapes PH2.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 GODREJ WOODSCAPES PH 2-FINAL.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5 Architects Certificate- Godrej Woodscapes Phase 2_30-Jun-2026.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer - Godrej Woodscapes - 30-06-26-PH2.pdf | 10 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 10 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 10 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 10 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 10 Jul 2026 |
| Q1 2026-27 Fire and Safety | 10 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 10 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 10 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 GODREJ WOODSCAPES PH 2- FINAL.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form -5 Architects Certificate- Godrej Woodscapes Phase 2_31-Mar-2026.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer - Godrej Woodscapes - 31-03-26-PH2.pdf | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form4_ CA Certificate _GODREJ WOODSCAPES_ PH 2_Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: 1_Form -5 Architects Certificate- Godrej Woodscapes Phase 2_31-Dec-2025.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer - Godrej Woodscapes - 31-12-25-PH2.pdf | 14 Jan 2026 |
| BS FY 2020-21File: BS FY 202021.pdf | 16 May 2024 |
| BS FY 2021-22File: BS FY 202122.pdf | 16 May 2024 |
| BS FY 2022-23File: BS FY 202223.pdf | 16 May 2024 |
| CF FY 2020-21File: CF FY 202021.pdf | 16 May 2024 |
| CF FY 2021-22File: CF FY 202122.pdf | 16 May 2024 |
| CF FY 2022-23File: CF FY 202223.pdf | 16 May 2024 |
| P & L FY 2020-21File: P L FY 202021.pdf | 16 May 2024 |
| P & L FY 2021-22File: P L FY 202122.pdf | 16 May 2024 |
| P & L FY 2022-23File: P L FY 202223.pdf | 16 May 2024 |
| Auditor Report FY 2020-21File: Auditor Report FY 202021.pdf | 16 May 2024 |
| Auditor Report FY 202122File: Auditor Report FY 202122.pdf | 16 May 2024 |
| GPL Standalone FS March 2023 signedFile: GPL Standalone FS March 2023 signed.pdf | 16 May 2024 |
| Auditor Report FY 2021-22File: Auditor Report FY 202122 (1).pdf | 16 May 2024 |
| Auditor Report FY 2022-23File: Auditor Report FY 202223.pdf | 16 May 2024 |
| Konadasapura Conversion OrderFile: Konadasapura Conversion Order.pdf | 16 May 2024 |
| GPL Standalone FS March 2023 signedFile: GPL Standalone FS March 2023 signedcompressed.pdf | 16 May 2024 |
| EC 01041960 to 31071986 - SyNo3File: EC 01041960 to 31071986 SyNo3.pdf | 16 May 2024 |
| EC - 010886 to 31051989 - SyNo3File: EC 010886 to 31051989 SyNo3.pdf | 16 May 2024 |
| EC 010689 to 31032004 - SyNo3File: EC 010689 to 31032004 SyNo3.pdf | 16 May 2024 |
| EC 01042004 to 21082022 - SyNo3File: EC 01042004 to 21082022 SyNo3.pdf | 16 May 2024 |
| EC 01041960 to 31071986 - SyNo4File: EC 01041960 to 31071986 SyNo4.pdf | 16 May 2024 |
| EC 010686 to 31051989 - SyNo4File: EC 010686 to 31051989 SyNo4.pdf | 16 May 2024 |
| EC 010689 TO 31032004 - SyNo4File: EC 010689 TO 31032004 SyNo4.pdf | 16 May 2024 |
| EC 01042004 to 21082022 - SyNo4File: EC 01042004 to 21082022 SyNo4.pdf | 16 May 2024 |
| FORM 1File: FORM 1 - GODREJ WOODSCAPE PHASE-2.PDF | 16 May 2024 |
| Advocate Search ReportFile: Godrej Woodscapes Title report .pdf | 16 May 2024 |
| CDPFile: Avalahalli CDPcompressed.pdf | 16 May 2024 |
| Village mapFile: Village map Konadasapura.pdf | 16 May 2024 |
| Nakshe ManjuraatiFile: Approval Letter BDA.pdf | 16 May 2024 |
| Relinquishment deedFile: Relinquishment Deed.pdf | 16 May 2024 |
| KSPCB FORM 1File: KSPCBFORM 1.pdf | 16 May 2024 |
| KSPCB FORM 13File: KSPCBFORM 13.pdf | 16 May 2024 |
| DP Work OrderFile: Work Order DP BDA.pdf | 16 May 2024 |
| Architect certified demarcation drawingFile: BL-signed - PHASE 2.pdf | 16 May 2024 |
| Area StatementFile: Area Statement.pdf | 16 May 2024 |
| Area Statement-1File: Area Statement1.pdf | 16 May 2024 |
| Area Statement-2File: Area Statement2.pdf | 16 May 2024 |
| Basement-1File: Basement1.pdf | 16 May 2024 |
| Basement-2File: Basement2.pdf | 16 May 2024 |
| Ground Floor-minFile: Ground Floor-min.pdf | 16 May 2024 |
| Site Plan-minFile: Site Plan-min.pdf | 16 May 2024 |
| Form 1File: FORM 1 - GODREJ WOODSCAPE PHASE-2.PDF | 16 May 2024 |
| Form 2File: Form-2 Architect Certificate - Phase 2-R.pdf | 16 May 2024 |
| Form 3File: Form - 3- Phase 2.pdf | 16 May 2024 |
| Structural safetyFile: Structure Certificate 24012024.pdf | 16 May 2024 |
| Guidance Value Certificate - Bengal LampsFile: Guidance Value Certificate Bengal Lamps.pdf | 16 May 2024 |
| FY 2019-20 Directors ReportFile: FY 201920 Directors Report.pdf | 16 May 2024 |
| FY 2020-21 Director ReportFile: FY 202021 Director Report.pdf | 16 May 2024 |
| FY 2021-22 Director ReportFile: FY 202122 Director Report.pdf | 16 May 2024 |
| FY 2022-23 DIRECTOR REPORTFile: FY 202223 DIRECTOR REPORT.pdf | 16 May 2024 |
| AAI - NoC - BLL-FinalFile: AAI NoC BLLFinal.pdf | 16 May 2024 |
| Bengal lamps Fire NoC- AcknowledgementFile: Bengal lamps Fire NoC Acknowledgement.pdf | 16 May 2024 |
| BESCOM - NoC - Bengal LampsFile: BESCOM NoC Bengal Lamps.pdf | 16 May 2024 |
| BSNLFile: BSNL.pdf | 16 May 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Godrej Splendour Phase II | GODREJ SPLENDOUR PHASE II, 46/1, 46/2, 46/3, 46/4, 46/5, 47 OF DOMMASANDRA VILLAGE AND PORTION OF SY. NO. 107/1 OF KUMBENA AGRAHARA VILLAGE,BIDARAHALLI HOBLI, , WHITEFIELD , BENGALURU EAST , BENGALURU URBAN, KARNATAKA - 560049 | Ongoing | Jan 2028 | Not due yet |
| Godrej Splendour | 46/1, 46/2, 46/3, 46/4, 46/5, 46/6, 47, 49/3, 57(P), 61/2 OF DOMMASANDRA VILLAGESY NO.107/1, 107/2 OF KUMBENA AGRAHARA VILLAGE,BIDARAHALLI HOBLI,, BENGALURU EAST, BENGALURU URBAN | Ongoing | Mar 2027 | Not due yet |
| Godrej Park Retreat | GODREJ PARK RETREAT, SY.NO.77,175/1,175/2A,175/2B,176/2A,176/2B & 177,KODATHI VILLAGE,VARTHUR HOBLI, BENGALURU EAST, BENGALURU URBAN | Ongoing | Feb 2027 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Godrej Woodscapes Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 37 registered projects within 2 km.
Floris & Commercial at Brigade Autograph
Ananthay Properties Private Limited
Godrej Woodscapes
Godrej Properties Limited
Sattva Songbird
Sattva Resi Private Limited
Godrej Splendour
Godrej Properties Limited
PAVANI MIRABILIA PHASE I
Sai Sravanthi Infra Projects Pvt Ltd
Godrej Splendour Phase II
Godrej Properties Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Godrej Properties Limited
Godrej Properties Limited has 17 registrations on RERA Karnataka, including Godrej Woodland Phase 2 and GODREJ PARKSHIRE. Its filings declare 8 earlier projects, none of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Godrej Woodscapes Phase 2 is delayed beyond 1 Jun 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Godrej Woodscapes Phase 2?
The registered promoter entity is Godrej Properties Limited, a company as per the filing. Its GSTIN 29AAACG3995M1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Godrej Woodscapes Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Godrej Woodscapes Phase 2?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Godrej Woodscapes Phase 2?
The professionals named in the filing: Architect: TILAK THOMAS; Engineer: Madhura Manjrekar; Chartered Accountant: BHAVESH D. SHAH & CO.. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Godrej Woodscapes Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback