Home / Browse projects / Bengaluru Urban, Karnataka / GM PALAZZO

Registration approved No litigation declared Residential/Group Housing project

GM PALAZZO

By GULAM MUSTAFA

RG-KA-01351 · RERA PRM/KA/RERA/1251/309/PR/160623/005991 · Last updated on RERA Karnataka portal: 5 Jun 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 99 documents Report an error

GM PALAZZO is a Residential/Group Housing project by GULAM MUSTAFA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/160623/005991 on 16 Jun 2023. Possession is promised by 12 Mar 2028.

At a glance

Project

  • NameGM PALAZZO
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 560025
  • Pincode560025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/160623/005991
  • ReraGenie IDRG-KA-01351

Builder

  • NameGULAM MUSTAFA
  • Entity typeOther ( Individual )
  • GSTIN29AFHPM3875P1ZI
  • Authorized SignatoryGULAM MUSTAFA

Key dates

this monthRegisteredJun 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Jun 2023
  • Promised completion12 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GM Palazzo---14014

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 5 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 5 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasYes-
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceNoNot applicable
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,543 sq m
Named landowners1
LandownerVillageDistrict
GULAM MUSTAFA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 15.20 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 15.20 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDamotharan S
EngineerVijay
Chartered AccountantPatakottu Giri Prasad

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed99

As listed on the registration, under the names the promoter filed them with; the newest 80 of 99 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/160623/005991 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BESCOM NOCFile: BESCOM NOC GM.pdf5 Jun 2023
BWSSB NOCFile: BWSSB NOC.pdf5 Jun 2023
STP - Basement floor planFile: Basement plan.pdf5 Jun 2023
STP- pump roomFile: STP (1).pdf5 Jun 2023
STP Section AAFile: Section (2).pdf5 Jun 2023
Agreement of SaleFile: Final Agreement of Sale - GM Palazzo NEW.pdf5 Jun 2023
Source of FundFile: Source of Funds Letter GM.pdf5 Jun 2023
Balance SheetFile: BALANCE SHEET GM 2021.pdf5 Jun 2023
Balance sheetFile: Balance Sheet GM 2022.pdf5 Jun 2023
Profit & LossFile: Profit & Loss 2021.pdf5 Jun 2023
Profit & LossFile: Profit & Loss 2022.pdf5 Jun 2023
CA Certificate with correct Account numberFile: CA CERTIFICATE GM PALAZZO 3.pdf5 Jun 2023
EC (after cancellation of sale agreement)File: EC.pdf5 Jun 2023
BWSSB RECEIPTFile: GM BWSSB ACK (4).pdf5 Jun 2023
BWSSB AKNOWLEDGEMENTFile: GM BWSSB ACK (2).pdf13 May 2023
KSPCB CFEFile: KSPCB NOC GM.pdf13 May 2023
CFE LETTERFile: CFE LETTER.pdf13 May 2023
KSPCB RECEIPTFile: Payment Reciept.pdf13 May 2023
Village MapFile: Village-map.pdf13 May 2023
Engineer LicenceFile: Merged certificates of the engineer.pdf13 May 2023
Allotment letterFile: Allotment Letter Albert Street GM PALLAZZO NEW.pdf13 May 2023
AOSFile: Final Agreement of Sale GM Palazzo new.pdf13 May 2023
CDP instead of Village map as city limitsFile: CDP QUERY 2.pdf22 Apr 2023
Engineer license(certificates)File: Merged certificates of the engineer.pdf22 Apr 2023
estimated cost of construction certified by the Engineer for civil works.File: Engineer certificated for Civil work.pdf22 Apr 2023
proforma of agreement for saleFile: AOS NEW.pdf22 Apr 2023
Allotment letterFile: ALLOTMENT LETTER.pdf22 Apr 2023
Building LicenseFile: Building License.pdf22 Apr 2023
Designated bank account number not matched with CA certificateFile: CA CERTIFICATE GM PALAZZO.pdf22 Apr 2023
Project SpecificationsFile: Project Specifications.pdf22 Apr 2023
Source of FundsFile: Source of Funds Letter.pdf22 Apr 2023
Form 16File: Form 16.pdf22 Apr 2023
Annual Tax Statement 2022File: 2022.pdf22 Apr 2023
Annual Tax Statement 2021File: 2021.pdf22 Apr 2023
Annual Tax Statement 2020File: 2020.pdf22 Apr 2023
Letter regarding Cancellation AgreementFile: Letter for Agreement cancelation.pdf22 Apr 2023
Application for BWSSB NOCFile: GM BWSSB ACK (1).pdf22 Apr 2023
Designated bank account number not matched with CA certificateFile: CA CERTIFICATE GM PALAZZO.pdf28 Mar 2023
Upload profit and loss account and balance sheetFile: Clarification PL and Balance sheet.pdf28 Mar 2023
What are all the sources of fund to complete the projectFile: Source of fund.pdf28 Mar 2023
Bank account name should be as per bank account direction circularFile: Bank account name.pdf28 Mar 2023
need khata certificatesFile: Khatha certificate.pdf28 Mar 2023
extracts before amalgamation of khataFile: Khatha Extract.pdf28 Mar 2023
need chain of title transfer documents from - before amalgamation of khata land owner to Mohammed FaFile: Gift Deed 598.pdf28 Mar 2023
need chain of title transfer documents from - before amalgamation of khata land owner to Mohammed FaFile: Gift Deed 599.pdf28 Mar 2023
need chain of title transfer documents from - before amalgamation of khata land owner to Mohammed FaFile: Gift Deed 607.pdf28 Mar 2023
need chain of title transfer documents from - before amalgamation of khata land owner to Mohammed FaFile: Gift Deed597.pdf28 Mar 2023
Seed DeedFile: Sale deed 856.pdf28 Mar 2023
Sale DeedFile: Sale deed1329.pdf28 Mar 2023
Deed of AmalgamationFile: Deed of Amalgamation.pdf28 Mar 2023
EC from - date of amalgamation to till dateFile: EC 2004 TO 17.pdf28 Mar 2023
EC from - date of amalgamation to till dateFile: EC 2017 TO 18.pdf28 Mar 2023
EC from - date of amalgamation to till dateFile: EC 2018 TO 2020.pdf28 Mar 2023
EC from - date of amalgamation to till dateFile: EC 2019 TO 22.pdf28 Mar 2023
EC from - date of amalgamation to till dateFile: EC FROM 22 TO 23.pdf28 Mar 2023
CDP mapFile: CDP Drawing.pdf28 Mar 2023
village mapFile: Affidavit ( NOC ).pdf28 Mar 2023
commencement certificateFile: Affidavit ( NOC ).pdf28 Mar 2023
KSPCB CFEFile: Affidavit ( NOC ).pdf28 Mar 2023
Engineer certificateFile: Engineer certificated for Civil work.pdf28 Mar 2023
Engineer certificate FOR CIVIL WORKFile: Engineer certificated for Civil work.pdf28 Mar 2023
Certificate from Registered Engineer indicating the structural safety adopted for the proposed buildFile: Structural stability Certificate.pdf28 Mar 2023
section 3(1) notarized affidavit by incorporating with the project name and project addressFile: Affidavit GM Palazzo 3 of 1 notarised.pdf28 Mar 2023
STP design drawing and STP demarcation drawingFile: Affidavit ( NOC ).pdf28 Mar 2023
upload the NOC issued by BWSSB and BESCOMFile: Affidavit ( NOC ).pdf28 Mar 2023
Allotment letterFile: Allotment Letter new.pdf28 Mar 2023
Sale agreementFile: Sale agreement.pdf28 Mar 2023
Common Area Alloted To AssociationFile: Area Statement.pdf28 Mar 2023
Project specificationFile: Project specification.pdf28 Mar 2023
renewed Engineer license instead tax paid is updatedFile: Certificate of Wealth tax.pdf28 Mar 2023
sanction planFile: Plan.PDF28 Mar 2023
Amalgamation letter from BBMPFile: Amalgamation Letter from BBMP.pdf28 Mar 2023
Types of units bhk wiseFile: Inventory details.pdf28 Mar 2023
Certificate issued by CA Form 1File: CA CERTIFICATE GM PALAZZO (3).pdf-
Certificate issued by Architect Form 2File: Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit for Non Litigation.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep GM PALAZZO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmGM PALAZZOOther 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: GULAM MUSTAFA

GULAM MUSTAFA has 1 registration on RERA Karnataka, including GM PALAZZO. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if GM PALAZZO is delayed beyond 12 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GM PALAZZO?

The registered promoter entity is GULAM MUSTAFA, an other ( individual ) as per the filing. Its GSTIN 29AFHPM3875P1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GM PALAZZO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GM PALAZZO?

The professionals named in the filing: Architect: Damotharan S; Engineer: Vijay; Chartered Accountant: Patakottu Giri Prasad. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GM PALAZZO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GM PALAZZO. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GM PALAZZO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.