ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / ADARSH PARK HEIGHTS PHASE-2

Registration approved Litigation declared Residential/Group Housing project

ADARSH PARK HEIGHTS PHASE-2

By AKARSHA REALTY PRIVATE LIMITED

RG-KA-77318 · RERA PRM/KA/RERA/1251/446/PR/200923/006275 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 1 case
  • 3 complaints at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
May 2027Possession promisedno revision filed
4 of 17Construction stages donefurthest along: RCC or MS Framed structure, 90%
23 of 494Units unsoldnot recorded sold or booked
3Complaints at RERA Karnatakaon this registration
Jump to the 289 documents Report an error

ADARSH PARK HEIGHTS PHASE-2 is a Residential/Group Housing project by AKARSHA REALTY PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/200923/006275 on 20 Sep 2023. Possession is promised by 31 May 2027. 471 of the 494 units on this registration are recorded sold or booked, and 4 of 17 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameADARSH PARK HEIGHTS PHASE-2
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560025
  • Pincode560025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/200923/006275
  • ReraGenie IDRG-KA-77318

Builder

  • NameAKARSHA REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70102KA2007PTC043642
  • GSTIN29AAQCS2460R1ZD
  • Authorized SignatoryB M Jayeshankar
  • Managing DirectorB M Jayeshankar
  • DirectorsB M Jayeshankar, BM Karunesh, Nidhi B J
  • Project HeadShivamurthy K B
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2023PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Sep 2023
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings6 building records
  • Documents filed289 files

Current status

95%471 of 494 units booked
77.9%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK G---84084
BLOCK H---86086
BLOCK J---74074
BLOCK K---74074
BLOCK L---96096
BLOCK M---80080

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 90%.

Building: 44% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)60%
Retaining wall (All types)100%
RCC or MS Framed structure90%
Masonry Construction0%
Plastering inside , outside & Ceiling50%
Joinery: Doors, Windows, Ventilators etc28%
Basic work of Water supply, Sanitary and Electrification28%
Dadoing, Skirting, Flooring, Tiles work (All types)35%
Railing and Grill fixing30%
Electrification, Water supply and Sanitary Finishing12%
Painting0%
Fire prevention and fire fighting fitting and fixture with network22%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership15

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area32,445 sq m
Named landowners15
LandownerVillageDistrict
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--
B M Karunesh--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 465.21 cr
Cost incurredRs 362.32 cr
Spent of the estimate77.88%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 354.80 crRs 322.30 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 75.00 crRs 2.76 cr
On-site expenditure-Salaries of workersRs 20.92 crRs 13.13 cr
On-site expenditure-Site OverheadRs 7.44 crRs 23.31 cr
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 4.76 cr-
On-site expenditure-Consultants FeesRs 2.29 crRs 81.94 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishwaradhya R E
EngineerPruthviraja B E
Chartered AccountantMahesh BS

Litigation declared1

CaseCourtStatus
OS no. 822/2008/2008Senior Civil Judge at Bangalore Rural-

Complaints filed with RERA Karnataka3

Case no.ComplainantRespondentFiled
01342/2025-AKARSHA REALTY PRIVATE LIMITED06/11/2025
01004/2026-AKARSHA REALTY PRIVATE LIMITED14/08/2026
01041/2026-AKARSHA REALTY PRIVATE LIMITED24/08/2026

Documents filed289

As listed on the registration, under the names the promoter filed them with; the newest 80 of 289 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/200923/006275 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Park Height Ph-2_.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Parkheights PH 2.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Parkheights PH 2.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Parkheights PH 2_.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Parkheight PH 2.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Parkheights PH 2.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: APH 2_.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Parkheight PH 2.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Parkheight PH 2.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Parkheight _merged.pdf31 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Parkheight PH 2.pdf31 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Eng Parkheight PH 2.pdf31 Jan 2026
Q3 2025-26 Water supply and sewage board31 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)31 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)31 Jan 2026
Q3 2025-26 KPTCL- BESCOM31 Jan 2026
Q3 2025-26 Fire and Safety31 Jan 2026
Q3 2025-26 Airport Authority of India31 Jan 2026
SITE PLANFile: scan 1 SITE PLAN.pdf6 Sep 2023
T3 FLOOR PLANS 1 of 4File: scan 7 T3 FLOOR PLANS 1 of 4.pdf6 Sep 2023
T3 FLOOR PLANS 2 of 4File: scan 8 T3 FLOOR PLANS 2 of 4.pdf6 Sep 2023
T3 FLOOR PLANS 3 of 4File: scan 9 T3 FLOOR PLANS 3 of 4.pdf6 Sep 2023
T3 FLOOR PLANS 4 of 4File: scan 10 T3 FLOOR PLANS 4 of 4.pdf6 Sep 2023
SECTIONFile: scan 11 SECTION.pdf6 Sep 2023
ELEVATIONFile: scan 12 ELEVATION.pdf6 Sep 2023
Gunjur DP Approved copyFile: Gunjur DP Approved copy.pdf6 Sep 2023
Bank letterFile: Parkheights Phase2 Bank Letter.pdf28 Aug 2023
CA Certificate certifying the Sources of fundsFile: CA Certificate Adarsh Park Heights Phase-2.pdf28 Aug 2023
Release DeedFile: RELEASE DEED-8169-2022-23.pdf28 Aug 2023
EC-01-04-2018 TO 27-07-2023-192-1File: EC-01-04-2018 TO 27-07-2023-192-1.pdf28 Aug 2023
EC-01-04-2018 TO 27-07-2023-192-2AFile: EC-01-04-2018 TO 27-07-2023-192-2A.pdf28 Aug 2023
EC-01-04-2018 TO 27-07-2023-192-2BFile: EC-01-04-2018 TO 27-07-2023-192-2B.pdf28 Aug 2023
EC-01-04-2018 TO 27-07-2023-193-1File: EC-01-04-2018 TO 27-07-2023-193-1.pdf28 Aug 2023
EC-01-04-2018 TO 27-07-2023-193-2File: EC-01-04-2018 TO 27-07-2023-193-2.pdf28 Aug 2023
EC-01-04-2018 TO 27-07-2023-194File: EC-01-04-2018 TO 27-07-2023-194.pdf28 Aug 2023
EC-01-04-2018 TO 27-07-2023-192-4File: EC-01-04-2018 TO 27-07-2023-192-4.pdf28 Aug 2023
Relinquishment deed-08302-2017-18File: Relinquishment deed-08302-2017-18.pdf28 Aug 2023
MR_120_2010-11File: MR_120_2010-11.pdf28 Aug 2023
BDA-Sensitive Clearance Approval LetterFile: BDA-Sensitive Clearance Approval Letter.pdf28 Aug 2023
SITE PLANFile: scan 1 SITE PLAN.pdf28 Aug 2023
T3 FLOOR PLANS 1 of 4File: scan 7 T3 FLOOR PLANS 1 of 4.pdf28 Aug 2023
T3 FLOOR PLANS 2 of 4File: scan 8 T3 FLOOR PLANS 2 of 4.pdf28 Aug 2023
T3 FLOOR PLANS 3 of 4File: scan 9 T3 FLOOR PLANS 3 of 4.pdf28 Aug 2023
T3 FLOOR PLANS 4 of 4File: scan 10 T3 FLOOR PLANS 4 of 4.pdf28 Aug 2023
SECTIONFile: scan 11 SECTION.pdf28 Aug 2023
ELEVATIONFile: scan 12 ELEVATION.pdf28 Aug 2023
AGREEMENT FOR SALEFile: AGREEMENT FOR SALE - PH- PHASE-2 RERA DRAFT.pdf28 Aug 2023
RTC-2020-21 193_2File: RTC-2020-21 193_2.pdf31 Jul 2023
RTC_2020-21-Sy No 193-1File: RTC_2020-21-Sy No 193-1.pdf31 Jul 2023
RTC-2020-21 192_1File: RTC-2020-21 192_1.pdf31 Jul 2023
RTC-2020-21 192_4File: RTC-2020-21 192_4.pdf31 Jul 2023
RTC_2020-21_Sy No192_2AFile: RTC_2020-21_Sy No192_2A.pdf31 Jul 2023
RTC-2020-21 194File: RTC-2020-21 194.pdf31 Jul 2023
MR_96_2008-09File: MR_96_2008-09.pdf31 Jul 2023
MR_84_2010-11File: MR_84_2010-11.pdf31 Jul 2023
MR 226_2006-07File: MR 226_2006-07.pdf31 Jul 2023
MR_120_2010-11File: MR_120_2010-11.pdf31 Jul 2023
MR_35_15-16File: MR_35_15-16.pdf31 Jul 2023
MR_37_2015-16File: MR_37_2015-16.pdf31 Jul 2023
MR 6_2016-17File: MR 6_2016-17.pdf31 Jul 2023
MR 24_90-91File: MR 24_90-91.pdf31 Jul 2023
- Partition Deed_4654_2008-09_05-01-2009File: 2-Partition Deed_4654_2008-09_05-01-2009.pdf31 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Adarsh Park heights Phase 1GUNJUR VILLAGE, VARTHUR HOBLI, BANGALORE EASTOngoingMay 2025Not delivered

How this compares with Bengaluru Urban

95%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ADARSH PARK HEIGHTS PHASE-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmADARSH PARK HEIGHTS PHASOther 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: AKARSHA REALTY PRIVATE LIMITED

AKARSHA REALTY PRIVATE LIMITED has 3 registrations on RERA Karnataka, including Adarsh Parkland Phase 1 and ADARSH PARK HEIGHTS PHASE-2. Its filings declare 2 earlier projects, none of them declared completed. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ADARSH PARK HEIGHTS PHASE-2 is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ADARSH PARK HEIGHTS PHASE-2?

The registered promoter entity is AKARSHA REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70102KA2007PTC043642 and GSTIN 29AAQCS2460R1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ADARSH PARK HEIGHTS PHASE-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ADARSH PARK HEIGHTS PHASE-2?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at ADARSH PARK HEIGHTS PHASE-2?

The professionals named in the filing: Architect: Vishwaradhya R E; Engineer: Pruthviraja B E; Chartered Accountant: Mahesh BS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADARSH PARK HEIGHTS PHASE-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADARSH PARK HEIGHTS PHASE-2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADARSH PARK HEIGHTS PHASE-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.