Home / Browse projects / Belagavi, Karnataka / GAJRAJ ENCLAVE
GAJRAJ ENCLAVE
By SHREE GAJRAJ BUILDERS AND DEVELOPERS
RG-KA-20567 · RERA PRM/KA/RERA/1249/447/PR/130225/007500 · Last updated on RERA Karnataka portal: 19 Feb 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
GAJRAJ ENCLAVE is a Residential/Group Housing project by SHREE GAJRAJ BUILDERS AND DEVELOPERS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/130225/007500 on 13 Feb 2025. Possession is promised by 30 Sep 2027. 3 of the 28 units on this registration are recorded sold or booked, and 5 of 13 construction stages are filed complete.
At a glance
Project
- NameGAJRAJ ENCLAVE
- TypeResidential/Group Housing
- Location
- Belagavi
- PincodeNot stated
- RERA no.PRM/KA/RERA/1249/447/PR/130225/007500
- ReraGenie IDRG-KA-20567
Builder
- NameSHREE GAJRAJ BUILDERS AND DEVELOPERS
- Entity typePartnership Firm
- Authorized SignatoryEKNATH CHOPADE
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on13 Feb 2025
- Promised completion30 Sep 2027
- Revised completionNone
- Buildings1 building record
- Documents filed114 files
Current status
Figures as on 19 Feb 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GAJRAJ ENCLAVE | - | - | - | 28 | 0 | 28 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 19 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 13 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 90%.
Building: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 90% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 85% |
| Joinery: Doors, Windows, Ventilators etc | 70% |
| Basic work of Water supply, Sanitary and Electrification | 70% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 70% |
| Railing and Grill fixing | 70% |
| Electrification, Water supply and Sanitary Finishing | 60% |
| Painting | 52% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 19 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 60% |
| Sewage and Drainage System | Yes | 60% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 60% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 20% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 85% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 85% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 90% |
| Terrace | Yes | 95% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHREE GAJRAJ BUILDERS AND DEVELOPERS | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 4.93 cr | Rs 10.81 lakh |
| INTEREST ON BORROWING | Rs 75.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 8.00 lakh | Rs 63,610 |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHRUTIKA WAGHAMARE |
| Engineer | VINAY BEHERE |
| Chartered Accountant | SANDEEP KAJUKAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed114
As listed on the registration, under the names the promoter filed them with; the newest 80 of 114 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/130225/007500 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 QU 3 25-26 .pdf | 19 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 QU 3 25-26 .pdf | 19 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 QU 3 25-26 .pdf | 19 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 19 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 19 Feb 2026 |
| Balance sheet 2023-24 with CA UDINFile: BALANCE SHEET FY 202324.pdf | 8 Jan 2025 |
| P n L 2023-24 with CA UDINFile: PROFIT AND LOSS AC FY 202324.pdf | 8 Jan 2025 |
| IT ack 2023-24 with self attested scheduleFile: IT 2023-24 with schedule.pdf | 8 Jan 2025 |
| IT ack 2024-25 with self attested scheduleFile: IT 2024-25 with schedule.pdf | 8 Jan 2025 |
| STP design drawing per the Guidelines of KSPCB NOC certified by the EngineerFile: STP design drawing with Engineer certified.jpg | 8 Jan 2025 |
| undertaking for water supplyFile: Undertaking for water supply.pdf | 8 Jan 2025 |
| self attested Land cost calculationsFile: ABOUT COST OF LAND.pdf | 8 Jan 2025 |
| latest dated stability certificateFile: stability certificate.pdf | 8 Jan 2025 |
| about Single/Layout/DP approval Order.File: about Single plot layout order and plan.pdf | 8 Jan 2025 |
| about Single Layout approval plan blue print in readable formatFile: about Single plot layout plan-blue print.pdf | 8 Jan 2025 |
| Building plan Blue print in readable formatFile: building permission- blue print.jpg | 8 Jan 2025 |
| Master Plan proposed area with consent authority seal and signatureFile: 15 (1) - Copy.jpg | 8 Jan 2025 |
| CDP master plan proposed area with consent authority seal and signatureFile: 15 (1).jpg | 8 Jan 2025 |
| Basement Floor planFile: Basement floor plan.jpg | 8 Jan 2025 |
| Ground floor planFile: Ground Floor.jpg | 8 Jan 2025 |
| First to fourth floor planFile: First floor to Fourth Floor Plan.jpg | 8 Jan 2025 |
| Terrace Floor planFile: Terrace Plan.jpg | 8 Jan 2025 |
| sectional planFile: Sectional plan.jpg | 8 Jan 2025 |
| Front Elevation planFile: Front Elevation.jpg | 8 Jan 2025 |
| Entire ZR copy published by the City Corporation of BelagaviFile: Belgaum_PART II_ZR final 15-2-2014 (1).pdf | 8 Jan 2025 |
| ADLR sketch map (CTS Map)File: CTS MAP (ADLR sketch MAP).pdf | 8 Jan 2025 |
| Reply NoticeFile: Reply Notice.pdf | 8 Jan 2025 |
| 1. As per RERA notification date 19/07/2023, its mandatory deposit of money into the RERA project deFile: about utilization of funds-with bank statement.pdf | 10 Dec 2024 |
| Source of fund with supporting documentsFile: Source of fund- with supporting document.pdf | 10 Dec 2024 |
| about balance sheet and P and L 2021-22File: about Balance sheet and P and L 2021-22.pdf | 10 Dec 2024 |
| Balance sheet 2022-23 with CA UDINFile: BALANCE SHEET FY 2022-23.pdf | 10 Dec 2024 |
| Balance sheet 2023-24 with CA UDINFile: BALANCE SHEET FY 2023-24.pdf | 10 Dec 2024 |
| P & L 2022-23 with CA UDINFile: PROFIT AND LOSS FY 2022-23.pdf | 10 Dec 2024 |
| P & L 2023-24 with CA UDINFile: PROFIT AND LOSS AC FY 2023-24.pdf | 10 Dec 2024 |
| self attested KYC of the Partners also attached respectively at promoter detail pageFile: self attested KYC of the partner of firm.pdf | 10 Dec 2024 |
| Certificate of authorizationFile: authorization letter.pdf | 10 Dec 2024 |
| Legal opinionFile: Legal Opinion.pdf | 10 Dec 2024 |
| about single plot/Layout/DP approval Order.File: about Single plot layout order and plan.pdf | 10 Dec 2024 |
| about Single Layout approval plan blue print in readable format.File: about Single plot layout plan-blue print.pdf | 10 Dec 2024 |
| Building plan Blue printFile: building permission- blue print.jpg | 10 Dec 2024 |
| ZR Copy extractFile: Belgaum_PART II_ZR final 15-2-2014 (1).pdf | 10 Dec 2024 |
| ADLR sketch Map (CTS Map)File: CTS MAP (ADLR sketch MAP).pdf | 10 Dec 2024 |
| Each floor and sectional planFile: building permission- blue print.jpg | 10 Dec 2024 |
| about number of car parkingFile: about car parking.pdf | 10 Dec 2024 |
| self attested HESCOM NOC with receiptFile: Self attested HESCOM NOC with receipt.pdf | 10 Dec 2024 |
| self attested Water NOCFile: self attested water NOC.pdf | 10 Dec 2024 |
| STP sewerline drawing with project name and addressFile: SEWAGELINE DRAWING with project name.pdf | 10 Dec 2024 |
| self attested sold and unsold detailsFile: about sold and unsold plots.pdf | 10 Dec 2024 |
| stability certificateFile: stability certificate.jpeg | 10 Dec 2024 |
| Form 6File: Form -6, Engineer (at the time of filing).pdf | 10 Dec 2024 |
| master plan with project landFile: master plan with project land.jpg | 10 Dec 2024 |
| master plan with locationFile: master plan with project land - Copy.jpg | 10 Dec 2024 |
| Registration CertificateFile: FIRM CERTIFICATE.jpeg | - |
| GST CertificateFile: GST CERTIFICATE.pdf | - |
| Partnership DeedFile: PARTNERSHIP DEED.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: FORM-1 GAJRAJ BUILDERS.pdf | - |
| Certificate issued by Architect Form 2File: ARCHITECT CERTIFICATE.pdf | - |
| Certificate issued by Engineer Form 3File: ENGINEER CERTIFICATE.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: NO LITIGATION AFFIDAVIT.pdf | - |
| Certificate from Chartered AccountFile: FORM-1 GAJRAJ BUILDERS.pdf | - |
| Balance Sheet 2023 - 2024File: BALANCE SHEET FY 2023-24.pdf | - |
| Balance Sheet 2022 - 2023File: BALANCE SHEET FY 2022-23.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: PROFIT AND LOSS AC FY 2023-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: PROFIT AND LOSS FY 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: Shree Gajraj Builders And Developers_09-Sep-2024_432696090.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: Shree Gajraj Builders And Developers_09-Sep-2024_432763000.pdf | - |
| APPROVED BUILDING PERMISSION | - |
| HESCOM NOC SWITH RECEIPT | - |
| WATER NOC | - |
| APPROVED BUILDING PERMISSION | - |
| APPROVED BUILDING PERMISSION | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep GAJRAJ ENCLAVE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: SHREE GAJRAJ BUILDERS AND DEVELOPERS
SHREE GAJRAJ BUILDERS AND DEVELOPERS has 1 registration on RERA Karnataka, including GAJRAJ ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if GAJRAJ ENCLAVE is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of GAJRAJ ENCLAVE?
The registered promoter entity is SHREE GAJRAJ BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in GAJRAJ ENCLAVE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at GAJRAJ ENCLAVE?
The professionals named in the filing: Architect: SHRUTIKA WAGHAMARE; Engineer: VINAY BEHERE; Chartered Accountant: SANDEEP KAJUKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GAJRAJ ENCLAVE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback