Home / Browse projects / Bengaluru Urban, Karnataka / FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE

Registration approved No litigation declared Residential/Group Housing project

FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE

By COLLAB PROJECTS LLP

RG-KA-93721 · RERA PRM/KA/RERA/1251/308/PR/120326/008521 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2030Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 15%
455 of 526Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 365 documents Report an error

FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE is a Residential/Group Housing project by COLLAB PROJECTS LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/120326/008521 on 12 Mar 2026. Possession is promised by 31 Dec 2030. 71 of the 526 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameFOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 560087
  • Pincode560087
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/120326/008521
  • ReraGenie IDRG-KA-93721

Builder

  • NameCOLLAB PROJECTS LLP
  • Entity typePartnership Firm
  • LLPINACA-1920
  • GSTIN29AASFC5138M1ZQ
  • Authorized SignatorySANDEEP RAMANOLLA
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on12 Mar 2026
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed365 files

Current status

13%71 of 526 units booked
1.9%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1---1320132
Tower 2---1310131
Tower 7---1310131
Tower 8---1320132

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 15%.

Building: 1% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work15%
Foundation footing work0%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesYes0%

Land and ownership21

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,168 sq m
Named landowners21
LandownerVillageDistrict
V.SUNANDA--
SATISH D C--
Ravindra--
Gullappa--
Sujathamma--
V.Ramaiah--
V.SUNANDA--
SATISH D C--
Sathyana.B--
Ramiah @ Ramiah Reddy--
Sathyanarayana.B--
COLLAB PROJECTS LLP--
Ramakrishna--
Jangama Reddy--
Nandyala Vijaya Narasima reddy--
Krishna Reddy--
Srinivasa Reddy--
B R RAGAMMA--
Rahul Sharma--
Katha Rajasekarareddy--
Smt. Susheela--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 740.00 cr
Cost incurredRs 14.44 cr
Spent of the estimate1.95%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 598.00 crRs 53.85 lakh
c. Admin & Marketing CostsRs 68.00 crRs 8.70 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 38.00 crRs 1.37 cr
On-site expenditure-Site OverheadRs 17.00 cr-
On-site expenditure-Salaries of workersRs 8.00 cr-
On-site expenditure-Consultants FeesRs 8.00 crRs 3.84 cr
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 3.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetha Pillai
EngineerPARAMESH GOWDA M R
Chartered AccountantKrishna Reddy Gundluri

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed365

As listed on the registration, under the names the promoter filed them with; the newest 80 of 365 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/120326/008521 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA RERA FP-1 (QU) 30-09-2026.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5 Archt MSTRL -FP 1 RERA (QU)-30-09-2026-Final.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MSTRL -FP 1 RERA (QU) -30-09-2026-Final.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A MSTRL FP 1 30-06-2026-Final.pdf28 Jul 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form -5 Archt MSTRL -FP 1 RERA (QU)-31-03-2026-Final.pdf28 Jul 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MSTRL -FP 1 RERA (QU) -31st March 2026.pdf28 Jul 2026
Q4 2025-26 Water supply and sewage board28 Jul 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)28 Jul 2026
Q4 2025-26 KPTCL- BESCOM28 Jul 2026
Q4 2025-26 Fire and Safety28 Jul 2026
Q4 2025-26 Airport Authority of India28 Jul 2026
Q4 2025-26 BSNL/Telecommunication Department28 Jul 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 C A MSTRL FP 1 31-03-2026-Final.pdf28 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form -5 Archt MSTRL -FP 1 RERA (QU)-30-06-2026-Final.pdf28 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engi MSTRL -FP 1 RERA (QU) -30-06-2026-Final.pdf28 Jul 2026
Q1 2026-27 Water supply and sewage board28 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)28 Jul 2026
Q1 2026-27 KPTCL- BESCOM28 Jul 2026
Q1 2026-27 Fire and Safety28 Jul 2026
Q1 2026-27 Airport Authority of India28 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department28 Jul 2026
1) MR showing flow of title to current owner before conversion 38/2 AND 38/9File: MR 10-95-96 SY NO 38-2 AND 39-9.pdf8 Mar 2026
2) Podi MR 38 to 38/2, 3,4 and 5-before conversionFile: MR-T25 2023-24 SY NO 38.pdf8 Mar 2026
3) Podi MR 39 to 3/7, 8,9 and 10-before conversionFile: MR-T27 2023-24 SY NO 39.pdf8 Mar 2026
4) MR of Sy No. 40/2 before conversionFile: MR H17 2023-24 SY NO 40-2.pdf8 Mar 2026
5) MR No 2 and MR No 4 SY NO 40-3 before conversionFile: MR No 2 and MR No 4 SY NO 40-3.pdf8 Mar 2026
6) MR of Sy No. 40/4 before conversionFile: MR H3 2023-24 SY NO 40-4.pdf8 Mar 2026
7) MR of Sy No. 40/5 before conversionFile: MR No H7-2020-21 SY NO 40-5.pdf8 Mar 2026
8) MR of Sy No. 40/6 before conversionFile: MR T47-2024-25 SY NO 40-6.pdf8 Mar 2026
9) MR of Sy No. 41/1,3 and 4 before conversionFile: MR T19-2024-25 SY NO 41.pdf8 Mar 2026
10) MR of Sy No. 41/2 before conversionFile: MR H11-2024-25 SY NO 41-2.pdf8 Mar 2026
11) MR of Sy No. 41/5 before conversionFile: MR H9-2024-25 SY NO 41-5.pdf8 Mar 2026
12) MR of Sy No. 41/6 before conversionFile: MR H10-2024-25 SY NO 41-6.pdf8 Mar 2026
13) MR of Sy No. 42 before conversionFile: MR T22 SY NO 42.pdf8 Mar 2026
14) MR of Sy No. 42 to 42/1 and 42/2 before conversionFile: MR T48-2024-25 SY NO 42-1.pdf8 Mar 2026
15) Title deed showing flow of title to current owner in Sy no 38/2 and 39/9File: SALE DEED 1306-95-96 SY NO 38-2, 39-9 CV PURA CERTIFIED.pdf8 Mar 2026
16) Partition Deed showing flow of titile to current owner in Sy.No. 38/3, 4,5, 39/7,8,10File: PARTITION DEED SRJ-1-05210-2023-24 SY NO 38 39 CV PURA.pdf8 Mar 2026
17) Sale Deed of Sy No.40/2File: SALE DEED SRJ-1-09249-2022-23 SY NO 40-2 CV PURA.pdf8 Mar 2026
18) PANCHAYAT PARIKAT 1988 SY NO 40-3File: PANCHAYAT PARIKAT 1988 SY NO 40-3 CV PURA.pdf8 Mar 2026
19) GIFT DEED - SY NO 40-4File: GIFT DEED ANK-1-03639-2023-24 SY NO 40-4 CV PURA.pdf8 Mar 2026
20) Sale Deed - SY NO 40-5File: SALE DEED SRJ-1-05563-2025-26 SY NO 40-5 CV PURA.pdf8 Mar 2026
21) GIFT DEED - SY NO 40-6File: GIFT DEED ANK-1-03640-2023-24 SY NO 40-6 CV PURA.pdf8 Mar 2026
Final Decree of Sy No 41/1,2,3 and 4File: FINAL DECREE ANK-1-01333-2023-24 SY NO 41 CV PURA.pdf8 Mar 2026
Final Decree of Sy No 41/1,3 and 4File: FINAL DECREE ANK-1-01334-2023-24 SY NO 41 CV PURA.pdf8 Mar 2026
Final Decree of Sy No 41/1,3 and 4File: FINAL DECREE ANK-1-01338-2023-24 SY NO 41 CV PURA.pdf8 Mar 2026
Final Decree of Sy No 41/1,3 and 4File: FINAL DECREE ANK-1-01341-2023-24 SY NO 41 CV PURA.pdf8 Mar 2026
Sale Deed Sy No-41-2File: SALE DEED SRJ-1-00590-25-26 SY NO 41-2 CV PURA.pdf8 Mar 2026
Sale Deed Sy No-41-5File: SALE DEED SRJ-1-00575-25-26 SY NO 41-5 CV PURA.pdf8 Mar 2026
Sale Deed Sy No-41-6File: SALE DEED SRJ-1-00577-25-26 SY NO 41-6 CV PURA.pdf8 Mar 2026
Final Decree of Sy No 42/1File: OS 1034-2014 ANK-1-02407-2024-25 FINAL DECREE.pdf8 Mar 2026
Sale Deed Sy No-42-2File: SALE DEED SRJ-1-05898-2023-24 SY NO 42 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 38/2 and 39/9File: JDA JGN-1-01269-2023-24 SY NO 38-2 39-9 CV PURA.pdf8 Mar 2026
Rectification JDA beween Land owner and Promoter in Sy No. 38/2 and 39/9File: RECTIFICATION JDA SRJ-1-09349-2024-25 SY NO 38-2 39-9 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 38/3 and 39/10File: JDA SRJ-1-01635-2023-24 SY NO 38-3 39-10 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 38/4File: JDA SRJ-1-01491-2023-24 SY NO 38-4 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 38/5File: JDA SRJ-1-05214-2023-24 SY NO 38-5 CV PURA.pdf8 Mar 2026
Rectification JDA beween Land owner and Promoter in Sy No. 38/5File: RECTIFICATION JDA SRJ-1-00827-2025-26 SY NO-38-5 CV PURA-NAGARAJ.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 39/7File: JDA SRJ-1-01542-2023-24 SY NO 39-7 CV PURA.pdf8 Mar 2026
Rectification JDA beween Land owner and Promoter in Sy No. 39/7File: RECTIFICATION JDA SRJ-1-01923-2023-24 SY NO 39-7 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 39/8File: JDA SRJ-1-01520-2023-24 SY NO 39-8 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 40/2, 4 and 6File: JDA SRJ-1-04416-2023-24 SY NO 40-2, 40-4, 40-6 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 40/3File: JDA SRJ-1-02058-2024-25 SY NO 40-3 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 41/1File: JDA SRJ-1-08341-2024-25 SY NO 41-1 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 41/2File: JDA SRJ-1-00591-2025-26 SY NO 41-2 CV PURA OLD.pdf8 Mar 2026
Rectification JDA beween Land owner and Promoter in Sy No. 41/2File: RECTIFICATION JDA SRJ-1-04994-2025-56 SY NO 41-2 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 41/3File: JDA SRJ-1-08342-2024-25 SY NO 41-3 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 41/4File: JDA ANK-1-09075-2024-25 SY NO 41-4 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 41/5File: JDA SRJ-1-00576-2025-26 SY NO 41-5 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 41/6File: JDA SRJ-1-00578-2025-26 SY NO 41-6 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 42/1File: JDA SRJ-1-05901-2023-24 SY NO 42-1 CV PURA.pdf8 Mar 2026
JDA beween Land owner and Promoter in Sy No. 42/1File: JDA SRJ-1-02539-2023-24 SY NO 42-2 CV PURA.pdf8 Mar 2026
E khata Sy no.38/2File: SY NO 38-2.pdf8 Mar 2026
E khata Sy no.38/3File: SY NO 38-3.pdf8 Mar 2026
E khata Sy no.38/4File: SY NO 38-4.pdf8 Mar 2026

How this compares with Bengaluru Urban

13%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmFOREST PROVINCE 1 @ MANAOther 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: COLLAB PROJECTS LLP

COLLAB PROJECTS LLP has 2 registrations on RERA Karnataka, including FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE and FOREST PROVINCE 2 @ MANA SKANDA THE RIGHT LIFE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE?

The registered promoter entity is COLLAB PROJECTS LLP, a partnership firm as per the filing. Its LLPIN ACA-1920 and GSTIN 29AASFC5138M1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE?

The professionals named in the filing: Architect: Geetha Pillai; Engineer: PARAMESH GOWDA M R; Chartered Accountant: Krishna Reddy Gundluri. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LIFE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FOREST PROVINCE 1 @ MANA SKANDA THE RIGHT LI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.